Planning application
1 Hardys Mews East Molesey Surrey KT8 9BQ
Works: Extension Loft or dormer Windows or glazing
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Change of use from Class E (Commercial) to Class C3 (Residential) with roof extension incorporating front and rear dormer windows and alterations to fenestration.
As published by the council, reference 2023/3095
Application record
- Reference
- 2023/3095
- Type
- Full Application
- Status
- Withdrawn
- Decision
- Withdrawn Decision
- Received
- 13 Nov 2023
- Validated
- 6 Dec 2023
- Ward
- Molesey East Ward
- Decision by
- Officer delegated
- Postcode
- KT8 9BQ
Timeline
Dates from the published record
-
13 Nov 2023
Received by Elmbridge
-
6 Dec 2023
Validated
Checked as complete and ready for consideration.
-
14 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat withdrawal means
The process from here
The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.
The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2 Hardys Mews East Molesey Surrey KT8 9BQ
Change of use from Class E (Commercial) to Class C3 (Residential) with first floor front extension and roof extension incorporating front and rear dormer windows and alterations to fenestration.
Withdrawn Full applications Extension Loft or dormer +1 15 docs -
11 Palace Road East Molesey Surrey KT8 9DJ
Tree Preservation Order EL:91/02 - Crown reduce 2 x Lime (G2).
Granted Trees 6 docs -
11 Palace Road East Molesey Surrey KT8 9DJ
Tree Preservation Order EL:91/02 - TG2 - Common Lime - Crown reduction by up to 1 metres in height and spread - reason for work: The proposed crown reduction of the 2 Common lime by up to 1 metre in height and spread is intended to maintain the tree at or close to its current dimensions, ensuring it remains appropriate for the location in which it is situated. The works will help manage future growth while retaining a balanced and aesthetically pleasing crown, with only a limited impact on the tree's health and amenity value. All pruning works will be carried out in accordance with BS3998:2010 - Tree Work Recommendations, with pruning wounds kept to a minimum and not exceeding approximately 30mm in diameter.
Granted Trees 7 docs -
11 Palace Road East Molesey Surrey KT8 9DJ
East Molesey Conservation Area - Crown reduce 2 x Sycamore.
Decided Trees 3 docs -
11 Palace Road East Molesey Surrey KT8 9DJ
Tree Preservation Order EL:91/02 - Crown reduce 1 x Lime.
Granted Trees 4 docs -
11 Palace Road East Molesey Surrey KT8 9DJ
East Molesey Kent Town Conservation Area - TG1 - Sycamore (Acer pseudoplatanus) - 2 trees both the same location on map and work specification Two Sycamore trees (Acer pseudoplatanus) Proposed works (description) Crown reduction of both Sycamore trees by an average of approximately 1.5 metres, with over-extended limbs reduced by up to 2 metres. Works to be carried out evenly and selectively throughout the crowns to maintain their current overall size and to leave a natural, flowing, and aesthetically pleasing crown form. Maximum pruning wound diameter not to exceed 50mm. Reason for works The proposed crown reduction is intended to maintain the trees at or close to their current crown dimensions and to prevent further increase in size due to the trees being in very close proximity to the building at the rear of the property. The trees have been heavily reduced in the past, and continued cyclical crown management is considered appropriate to control regrowth, maintain structural balance, and reduce the need for more severe works in the future. All works will be undertaken in accordance with BS3998:2010 - Tree Work Recommendations, with the aim of retaining the trees while having only a limited impact on their health, amenity value, and long-term condition.
Granted Trees 5 docs
Other full applications applications
In Elmbridge
-
2026/1551 Granted
Squirrels Leap 13 Fernhill Oxshott Leatherhead Surrey KT22 0JH
Two pairs of semi-detached two-storey houses with rooms in the roofspace, bin and cycle storage, new access, associated parking and landscaping following demolition of existing house and detached garage and outbuildings.
-
2025/2670 Granted
Cartref Ellesmere Road Weybridge Surrey KT13 0HY
Residential development comprising 3 detached two-storey houses with rooms in roof space, 1 with a detached garage, and 6 pairs of semi-detached two-storey houses with rooms in the roof space, bin and cycle stores and associated hard and soft landscaping following the demolition of existing house and associated outbuildings.
-
2026/0550 Refused
Tanglewood Sandy Lane Cobham Surrey KT11 2EP
Two-storey detached house with rooms in the roofspace and dormer windows following demolition of the existing house.
-
2026/1406 Decided
Unit 1 Worthy Yard Redhill Road Cobham Surrey KT11 1EG
Application for temporary change of use of land for vehicle parking in connection with vehicle storage and recovery depot (2 years)
-
2026/1475 Granted
15 Ashley Park Road Walton-On-Thames Surrey KT12 1JU
Subdivision of the existing residential plot and the construction of a single self-build residential dwelling, detached garage, parking, new vehicle access from Ashley Park Road with associated entrance gates, pedestrian access from Ashley Drive with associated gate, and associated bin storage and landscaping.