Planning application
18 King Edward Avenue Dartford Kent DA1 2HZ
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of existing rear extension, conservatory & detached garage and erection of a single storey rear and side extension, and associated alterations
As published by the council, reference 26/00903/FUL
Application record
- Reference
- 26/00903/FUL
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 4 Aug 2026
- Validated
- 4 Aug 2026
- Ward
- West Hill
- Parish
- Not Parished
- Postcode
- DA1 2HZ
Timeline
Dates from the published record
-
4 Aug 2026
Received by Ebbsfleet Development Corporation
-
12 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 29 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Ebbsfleet Development Corporation took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Ebbsfleet Development Corporation for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
8 King Edward Avenue Dartford Kent DA1 2HZ
Demolition of existing single storey rear addition and erection of a single storey rear extension. Replace dormer window with opening french doors onto terrace
Granted Full applications Extension Loft or dormer +2 12 docsSmall domestic -
18 King Edward Avenue Dartford Kent DA1 2HZ
74% historically approved · decision due ~29 Sep
Demolition of existing rear extension, conservatory & detached garage and erection of a single storey rear and side extension, and associated alterations
Awaiting decision Full applications Extension Demolition 6 docsSmall domestic -
15 King Edward Avenue Dartford Kent DA1 2HZ
Garage conversion into habitable room, rear facade and internal alterations, front porch alterations and erection of rear glass conservatory
Granted Full applications Extension 12 docsSmall domestic -
15 King Edward Avenue Dartford Kent DA1 2HZ
Garage conversion into habitable room, rear facade and internal alterations, front porch alterations and erection of rear glass conservatory
Granted Full applications Extension 12 docsSmall domestic -
20 Alexandra Terrace King Edward Avenue Dartford Kent DA1 2HH
89% historically approved · decision due ~28 Oct
Non-material amendment following grant of planning permission DA/26/00738/FUL in respect of moving the conservatory side walls
Awaiting decision Amendments Extension 2 docs -
20 Alexandra Terrace King Edward Avenue Dartford Kent DA1 2HH
Erection of a single storey rear conservatory and a front porch
Granted Full applications Extension 7 docsSmall domestic
Other full applications applications
In Ebbsfleet Development Corporation
-
26/00785/FUL Granted
Maypole County Primary School Franklin Road Dartford Kent DA2 7UZ
Erection of two enclosures around existing air source heat pump (ASHP) controls
-
26/00789/FUL Refused
14 Ivy Villas Station Road Greenhithe Kent DA9 9NE
Erection of a boundary wall
-
26/00681/FUL Refused
14 The Crescent Greenhithe Kent DA9 9EP
Erection of a part two/part single storey side extension
-
26/01020/FUL Awaiting decision
233 High Road Wilmington Kent DA2 7BU
Erection of a single-storey rear extension
-
26/01015/FUL Awaiting decision
5 Foxwood Road Bean Kent DA2 8BH
Erection of a first floor side extension, single storey rear extension and enlarged porch. Change of materials to the roof and walls