12 Feb 2026
Received by Ebbsfleet Development Corporation
-
5 Mar 2026
Validated
Checked as complete and ready for consideration.
-
30 Apr 2026
Decision issued: Application Withdrawn
-
27 Jul 2026
Added to PlanIndex
What withdrawal means
The process from here
The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.
The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00159/FUL Withdrawn
Land To The East Of New Barn Road Southfleet Gravesend Kent
Construction of a temporary commercial electric vehicle charging hub and associated infrastructure, internal access roads/hardstanding and landscaping
-
25/01087/CDNA Granted
Land East Of New Barn Road South Of Watling Street Southfleet Kent
Submission of details relating to WSI and subsequent reports pursuant to Conditions 4 (archaeology) of planning permission DA/23/00863/FUL for proposed construction of a Battery Energy Storage Facility and associated works including battery energy storage containers, AUX (Auxiliary) transformer, KNAN transformers, MV (Medium voltage) Switch room, DNO (distribution network operator) Switch room, erection of boundary fencing & CCTV camera and connection to existing electricity grid. Formation of temporary construction compound
-
25/01087/CDNA Granted
Land East Of New Barn Road South Of Watling Street Southfleet Kent
Submission of details relating to WSI and subsequent reports pursuant to Conditions 4 (archaeology) of planning permission DA/23/00863/FUL for proposed construction of a Battery Energy Storage Facility and associated works including battery energy storage containers, AUX (Auxiliary) transformer, KNAN transformers, MV (Medium voltage) Switch room, DNO (distribution network operator) Switch room, erection of boundary fencing & CCTV camera and connection to existing electricity grid. Formation of temporary construction compound
Other full applications applications
In Ebbsfleet Development Corporation
-
26/00595/FUL Refused
72 Hedge Place Road Greenhithe Kent DA9 9LH
Change of use from dwellinghouse (Class C3) to a 6-bedroom 6-person HMO (Class C4) and engineering works to front garden for provision of bike storage
-
26/00596/FUL Refused
30 Brent Lane Dartford Kent DA1 1QW
Change of use from dwellinghouse (Class C3) to 6-bedroom 6-person HMO (Class C4) with provision of bike and bin storage
-
26/00883/FUL Awaiting decision
17 Seaton Road Dartford Kent DA1 3LB
Conversion of existing garage into habitable room with associated alterations to front elevation, demolition of existing front porch and erection of a new front porch
-
26/00520/FUL Refused
158 Summerhouse Drive Bexley Kent DA2 7PD
Erection of a dwelling with associated parking, extension to existing vehicular access with bin storage and cycle storage
-
26/00554/FUL Granted
Telephone Exchange Suffolk Road Dartford Kent DA1 1EH
Provision of 2 no. shipping containers for storage of telecoms materials and equipment