Skip to content
PlanIndex Get alerts
Menu

Planning application

CS/26/101147

6 Riverside Industrial Park Conegar Road Chickenhall Lane, Eastleigh, SO50 6RQ

Decided Eastleigh Consultations

Proposal

HCC Consultation Request. Variation of conditions 4, (Operating Hours) 11 & 12 (Noise) of Planning Permission CS/22/92808 at Aquavitrum, 6 Riverside Industrial Estate, Conegar Road, Eastleigh SO50 6RQ.

As published by the council, reference CS/26/101147

Timeline

Dates from the published record

  1. 23 Mar 2026

    Received by Eastleigh

  2. 24 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 25 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • CS/26/101644 Decided

    ENERGY RECOVERY CENTRE, CHICKENHALL LANE, EASTLEIGH, SO50 6RQ

    HCC Consultation request. Pre-application - Request for advice on information to accompany applications for an electrical sub-station and temporary gas-powered generator.

    24 Jun 2026 0m away
  • CS/25/100492 Granted

    SOUTHAMPTON TRANSFER STATION AND RECYCLING CENTRE, TOWER LANE, EASTLEIGH, SO50 6NZ

    HCC Consultation request. Consultation for the installation of a Helios fire suppression and prevention system

    20 Nov 2025 484m away

In Eastleigh

  • CS/26/101397 Granted

    HAMBLE PRIMARY SCHOOL, HAMBLE LANE, HAMBLE-LE-RICE, SOUTHAMPTON, SO31 4ND

    HCC Consultation Request: Addition of hardstanding to the existing car park, and the provision of a new external play area at Hamble Primary School, Hamble Lane, Hamble-le-rice Hampshire SO31 4ND. Comments due by 2 June 2026.

    12 May 2026 Outline
  • CS/26/101392 Granted

    HAMBLE PRIMARY SCHOOL, HAMBLE LANE, HAMBLE-LE-RICE, SOUTHAMPTON, SO31 4ND

    HCC Consultation Request: Removal of Condition 2 (Time Limits) of Planning Permission CS/19/85469 to continue siting of a double modular temporary classroom following expiry of condition at Hamble Primary School, Hamble Lane, Hamble-le-rice Hampshire SO31 4ND. Comments due by 25 June 2026.

    11 May 2026 Outline
  • CS/26/101385 Granted

    HAMBLE PRIMARY SCHOOL, HAMBLE LANE, HAMBLE-LE-RICE, SOUTHAMPTON, SO31 4ND

    HCC Consultation Request: Removal of Condition 1 (Time Limits) of Planning Permission S/17/79744 to continue siting of a double modular temporary classroom following expiry of condition at Hamble Primary School, Hamble Lane, Hamble-Le-Rice, SO31 4ND.

    11 May 2026 Outline
  • O/26/101417 Decided

    Land adjacent to Windhover Roundabout, Bursledon, Bursledon Road, Bursledon, SO31 8BN

    Outline planning application (all matters reserved except for access) for employment development (Use Class B2/B8) of up to 18,580 square metres together with ancillary offices (Use Class E(g)(i)) and other ancillary buildings, structures, parking, servicing and manoeuvring areas, landscaping and sustainable urban drainage features, following demolition of existing buildings.

    18 May 2026 Outline
  • CS/26/101093 Granted

    The Hamble School Satchell Lane, Hamble, SO31 4NE

    HCC Consultation Request. External hard surfacing relating to the provision of a new modular classroom and adaptation of existing car park to accommodate pickup/dropoff bays

    16 Mar 2026 Outline