EIA Screening - For the installation and operation of a solar development and battery energy storage system with associated equipment and necessary infrastructure.
As published by the council, reference DC/26/2623/EIA
Application record
- Reference
- DC/26/2623/EIA
- Type
- EIA Screening Opinion
- Status
- Awaiting decision
- Received
- 23 Jul 2026
- Validated
- 23 Jul 2026
- Ward
- Framlingham
- Parish
- Letheringham
Site history
Applications at this address on the East Suffolk register
This site has had 2 applications since 2025.
-
DC/25/0693/EIA Decided
Land North Of Kettleburgh Road Easton And Land South Of The Street Letheringham Suffolk
EIA Screening Opinion - Installation and operation of a Solar Development and Battery Energy Storage System with associated equipment and necessary infrastructure
Timeline
Dates from the published record
-
23 Jul 2026
Received by East Suffolk
-
31 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 17 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Suffolk took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
42 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided outline applications in a median of 18 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Downton Cottage The Street Easton Woodbridge Suffolk IP13 0ED
1no. Ash (T1 on plan) - Crown reduce to 4 metres
Granted Trees 2 docs -
Pedlars Halt The Street Easton Suffolk IP13 0ED
Apple tree - crown reduce by 1m. all round.
Granted Trees 2 docs -
Almond Tree Cottage The Street Easton Woodbridge Suffolk IP13 0ED
100% historically approved · decision due ~15 Jan
1no. Yew (marked on plan) - Reduce to previous pruning points at 3.5 metres above ground
Awaiting decision Trees 1 doc -
Meadow View The Street Easton Woodbridge Suffolk IP13 0ED
100% historically approved · decision due ~2 Apr
1no. Ash (marked on plan) - Fell
Awaiting decision Trees 2 docs -
Lay By School Lane Easton Suffolk IP13 0ES
98% historically approved · decision due ~16 Mar
Construction of 2 no. 3 bedroom self build sustainable dwellings
Awaiting decision Outline New dwelling 35 docs -
Lay By School Lane Easton Suffolk
93% historically approved · decision due ~16 Mar
Erection of 4 Bedroom Self Build Eco House
Awaiting decision Full applications New dwelling 29 docs
Other outline applications
In East Suffolk
-
DC/26/3004/CCC Granted
A12 Between Junctions 58 (Seven Hills) And Woods Lane Roundabout Woodbridge Suffolk
County Council Consultation - Transport improvements to the A12 from Junction 58 (Seven Hills, Ipswich) to Woods Lane Roundabout, Woodbridge including the upgrade from a single carriageway to dual carriageway between A12 / B1438 and the A12 / B1078, Construction of a new pedestrian bridge and other highways and pedestrian improvements.
-
DC/26/3240/PDN Granted
Proposed Substation Adjacent Broombank Saxmundham Road Aldeburgh Suffolk
Installation of a substation within a land plot of 3m x 3m located near Saxmudham Road, Aldeburgh
-
DC/26/3256/CON Granted
Bank And Premises Exchange Square Beccles Suffolk NR34 9HH
Consultation - New Pavement Licence for Pascolo Lounge, Beccles 4 tables and 8 chairs Front of the premises: left-hand side 1.6m x 3.5m, right-hand side 1.6m x 2.5m Monday to Sunday 08:00 to 23:00
-
DC/26/3255/CON Granted
YouDrink Bottleshop & Taproom 4 Thoroughfare Halesworth Suffolk IP19 8AH
Consultation - RENEWAL of pavement licence - 2 tables 4 chairs, Area infront of the premises - 5.2m x 2.5m, Monday to Sunday 09:00 until 23:00
-
DC/26/3431/CON Awaiting decision
Black Barn Farm Monewden Road Charsfield Woodbridge Suffolk IP13 7QE
Consultation - To install electronic communications apparatus/development ancillary to radio equipment housing on behalf of Cornerstone.