Planning application
Land North Of Kettleburgh Road Easton And Land South Of The Street Letheringham Suffolk
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
EIA Screening - For the installation and operation of a solar development and battery energy storage system with associated equipment and necessary infrastructure.
As published by the council, reference DC/26/2623/EIA
Application record
- Reference
- DC/26/2623/EIA
- Type
- EIA Screening Opinion
- Status
- Awaiting decision
- Received
- 23 Jul 2026
- Validated
- 23 Jul 2026
- Ward
- Framlingham
- Parish
- Letheringham
Timeline
Dates from the published record
-
23 Jul 2026
Received by East Suffolk
-
31 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 17 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Suffolk took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
42 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided outline applications in a median of 17 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Downton Cottage The Street Easton Woodbridge Suffolk IP13 0ED
1no. Ash (T1 on plan) - Crown reduce to 4 metres
Granted Trees 2 docs -
Pedlars Halt The Street Easton Suffolk IP13 0ED
Apple tree - crown reduce by 1m. all round.
Granted Trees 2 docs -
Almond Tree Cottage The Street Easton Woodbridge Suffolk IP13 0ED
100% historically approved · decision due ~15 Jan
1no. Yew (marked on plan) - Reduce to previous pruning points at 3.5 metres above ground
Awaiting decision Trees 1 doc -
Meadow View The Street Easton Woodbridge Suffolk IP13 0ED
100% historically approved · decision due ~2 Apr
1no. Ash (marked on plan) - Fell
Awaiting decision Trees 2 docs -
Lay By School Lane Easton Suffolk IP13 0ES
98% historically approved · decision due ~16 Mar
Construction of 2 no. 3 bedroom self build sustainable dwellings
Awaiting decision Outline New dwelling 35 docs -
Lay By School Lane Easton Suffolk
93% historically approved · decision due ~16 Mar
Erection of 4 Bedroom Self Build Eco House
Awaiting decision Full applications New dwelling 29 docs
Other outline applications
In East Suffolk
-
DC/26/3197/EIA Awaiting decision
Part Land South East Of Grimseys Lane Leiston Suffolk
EIA Screening Opinion - Reservoir Extension to Sizewell Estate
-
DC/26/2832/CON Granted
Land To North Of Railway Line Henley Road Ipswich Suffolk
Consultation - Submission of Reserved Matters (appearance, layout, landscaping, and scale) for part of Phase 4a and Phase 4b (Part of Phase 5 of approved Phasing Strategy) of the development at Henley Gate comprising 121 dwellings, roads, parking, open space, landscaping, drainage, and other associated works; pursuant to Outline Planning Permission IP/16/00608/OUT comprising up to 1,100 dwellings, local centre, country park, open space, sustainable urban drainage systems, access points from Henley Road and associated engineering works. IP/16/00608/OUT was an EIA development and an Environmental Statement was submitted with the application under the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 2011 (as amended).
-
DC/26/3120/CON Awaiting decision
Suffolk Water Recycling Transfer And Storage Project Suffolk
Consultation - Request for Scoping Opinion under Regulation 10 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 and Regulation 13 of The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended in 2017)
-
DC/26/2886/CON Granted
Land At Silverlace Green Benhall Suffolk IP17 1JH
Consultation - To facilitate a new connection it has become necessary for Eastern Power Networks plc to upgrade the existing pole mounted transformer to 50kVa.
-
DC/26/2965/CCC Granted
Land At Foxburrow Farm Brightwell Suffolk
County Council Consultation - Retrospective extension to an existing recycling facility for the importation, storage, treatment and recycling of inert waste and storage of building materials, with parking, office, storage facilities and associated infrastructure.