Planning application

Snape Maltings Snape Bridge Tunstall Suffolk IP17 1SR

Awaiting decision East Suffolk DC/26/2442/VOC Variation of Conditions

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Variation of Condition No. 2 of DC/16/3159/FUL - Improvements to existing flood defences comprising: a mix of hard and soft engineering works which will raise, renew or replace existing flood defence structures and affecting buildings and structures within the curtilage of a listed building; replacement of ground floor windows to the east elevation of the concert hall - Revised Flood Defence Improvements

As published by the council, reference DC/26/2442/VOC

Application record

Reference
DC/26/2442/VOC
Type
Variation of Conditions
Status
Awaiting decision
Received
6 Jul 2026
Validated
31 Jul 2026
Ward
Rendlesham And Orford
Parish
Tunstall
Postcode
IP17 1SR

Comment by 14 September 2026

The council is taking comments on this application until then. Have your say on East Suffolk's portal.

Timeline

Dates from the published record

  1. 6 Jul 2026

    Received by East Suffolk

  2. 31 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 15 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 25 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Suffolk took a median of 54 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Cambridge

648 applications on PlanIndex · across 82 councils · 89% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

74 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with East Suffolk for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About amendments applications

How this application type works

An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.

More on amendments applications in our guide

Nearby applications

Within 500 metres

  • Snape Maltings Snape Bridge Tunstall Suffolk IP17 1SR

    DC/26/2504/DRC Submitted 13 Jul 2026 10m away

    99% historically approved · decision due ~7 Sep

    Discharge of Condition Nos. 3 and 5 of DC/16/3159/FUL - Improvements to existing flood defences comprising: a mix of hard and soft engineering works which will raise, renew or replace existing flood defence structures and affecting buildings and structures within the curtilage of a listed building; replacement of ground floor windows to the east elevation of the concert hall - Ecological Mitigation and Improvement Plan and i) Specification for new walling brickwork; brick bond; mortar type; coping; and junction with existing bridge to be supplied. ii) Replacement steel moorings to existing quayside upstand where replaced to match existing in position, size and material iii) Details of the connection between the new flood wall and north gable of the concert hall iv) Details of new platform lift from external terrace to refectory/concert hall entrance on south elevation to show appearance, position, size. v) Detail of the gradient of the footpath/bank at the eastern end of the works proposed in Area 3.

    Awaiting decision Conditions Windows or glazing 26 docs
  • Britten Pears School For Advanced Musical Studies Snape Maltings Concert Hall Snape Bridge Tunstall Saxmundham Suffolk IP17 1SP

    DC/25/2818/VOC Submitted 17 Jul 2025 23m away

    Variation of Condition No.2 of DC/25/1472/VOC - Various works including, new lift tower (including sprinkler tank relocation), general access improvements including access ramp and provision of a lift to all floors and internal reconfiguration and refurbishment and remodelled top floor activity space - revised plans in relation to tank details

    Granted Amendments 16 docs
  • Britten Pears School For Advanced Musical Studies Snape Maltings Concert Hall Snape Bridge Tunstall Saxmundham Suffolk IP17 1SP

    DC/26/1940/DRC Submitted 26 May 2026 24m away

    Discharge part of Condition No.3 of DC/25/2818/VOC - Variation of Condition No.2 of DC/25/1472/VOC - Various works including, new lift tower (including sprinkler tank relocation), general access improvements including access ramp and provision of a lift to all floors and internal reconfiguration and refurbishment and remodelled top floor activity space - revised plans in relation to tank details - Verification report

    Granted Conditions 5 docs
  • Clock Tower Snape Maltings Snape Bridge Tunstall Saxmundham Suffolk IP17 1SR

    DC/25/2561/TCA Submitted 27 Jun 2025 53m away

    Undertake tree works listed in submitted tree survey

    Granted Trees 3 docs
  • Snape Maltings Concert Hall Snape Bridge Tunstall Woodbridge Suffolk IP17 1SP

    DC/26/2083/LBC Submitted 5 Jun 2026 82m away

    Listed Building Consent - Refurbishment and upgrading of the existing seating, alongside the introduction of measures to improve accessibility and safety within the auditorium, including the installation of new handrails to the stepped gangways within the raked seating area.

    Granted Heritage and listed buildings 19 docs
  • Snape Maltings Snape Bridge Tunstall Suffolk IP17 1SR

    DC/24/2915/TCA Submitted 14 Aug 2024 184m away

    Trees to front of Snape Bridge House: T1 Beech - Fell, tree has dieback and hollow stem at base. T2 Holly - Fell, heavy ivy cover.

    Granted Trees 2 docs

In East Suffolk

  • DC/26/2584/VOC Granted

    Edwin House Lowestoft Road Beccles Suffolk NR34 7DE

    Variation of Condition No. 2 of DC/26/1575/FUL - First floor side extension - Additional high level window into proposed first floor bedroom extension

    20 Jul 2026 Amendments
  • DC/26/1113/VOC Granted

    Former Deben High School Garrison Lane Felixstowe Suffolk

    Application to vary condition 9a (approved plans) of DC/24/0773/VOC (amended scheme to that approved under DC/21/0541/FUL) in relation to the design and layout of the roofs of the apartments and dwellings (to reduce the extent of solar PV and green roof provision). Variation of all conditions relating to the Outline consent of DC/24/0773/VOC and condition 1 (approved plans), condition 2 (cricket building materials), condition 4 (green roofs) and condition 9 (operation hours) of the Reserved Matters consent DC/24/2048/ARM to amend the approved plans and drainage strategy (by substituting the green roof of the cricket pavilion for alternative drainage strategies) and amend the operation hours (to allow for operation of the cricket club between 09:00hrs to 23:00hrs inclusive).

    23 Mar 2026 Amendments
  • DC/26/3027/VOC Awaiting decision

    29 Bracken Avenue Kesgrave Ipswich Suffolk IP5 2PP

    Variation of Condition No. 2 of DC/26/0983/FUL - Construction of single storey rear extension and outbuilding - Reduce the scale of outbuilding

    26 Aug 2026 Amendments
  • DC/26/2751/AME Granted

    Flora Bank Coastguard Lane Kessingland Lowestoft Suffolk NR33 7RE

    Non-Material Amendment of DC/25/0237/FUL - Proposed Bungalow - amended site boundary

    4 Aug 2026 Amendments
  • DC/26/3008/AME Awaiting decision

    Brookland The Street Grundisburgh Woodbridge Suffolk IP13 6TD

    Non-Material Amendment of DC/26/0506/FUL - Repair and replace Circa 20C rear glazed conservatory, construct small side extension for side entrance and boot room and minor internal changes and new kitchen fit-out - Change timber framed windows to Smart Heritage window and door (refer revised elevations) Relocate proposed side entrance door from front elevation to side elevation

    25 Aug 2026 Amendments