Planning application
The Chestnuts Broke Hall Park Nacton Ipswich Suffolk IP10 0ET
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Certificate of Lawful Use (Proposed) - The leased caravan is required strictly on a temporary basis to provide necessary on-site accommodation while interior renovation works are carried out on the primary dwellinghouse, during which time the main house will be structurally uninhabitable. The caravan is expected to be sited on the land for a period of approximately 6 months, starting from August 2026 to January 2026. The caravan will be completely disconnected from utilities and removed from the site within 7 days of the renovation works reaching practical completion and the primary dwellinghouse becoming safe and habitable again.
As published by the council, reference DC/26/2196/CLP
Application record
- Reference
- DC/26/2196/CLP
- Type
- Lawful Development Certificate(Proposed)
- Status
- Awaiting decision
- Received
- 15 Jun 2026
- Validated
- 17 Jun 2026
- Ward
- Orwell And Villages
- Parish
- Nacton
- Postcode
- IP10 0ET
Timeline
Dates from the published record
-
15 Jun 2026
Received by East Suffolk
-
17 Jun 2026
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Suffolk took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided lawful development applications in a median of 52 days. More in our guide to how long planning decisions take.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Broke Hall Broke Hall Park Nacton Ipswich Suffolk IP10 0ET
100% historically approved · decision due ~8 Oct
TPO No. 20 / 1985 1no. Holm oak (T1 on plan) - Fell
Awaiting decision Trees 3 docs -
2 The Orangery Broke Hall Park Nacton Ipswich Suffolk IP10 0ET
Retrospective application for the construction of platform and proposed 1.8 metre (6)ft fence
Granted Full applications 35 docsSmall domestic
Other lawful development applications
In East Suffolk
-
DC/26/3382/CLP Awaiting decision
1 Dove Road Reydon Southwold Suffolk IP18 6XJ
Certificate of Lawful Use (Proposed) - Ground floor rear extension, internal alterations, floor plan redesign and all associated works
-
DC/26/3331/CLP Awaiting decision
61 Claydon Drive Lowestoft Suffolk NR32 3DZ
Certificate of Lawful use (Proposed) - Construction of a single storey rear extension.
-
DC/26/3220/CLE Awaiting decision
Crown House Low Road Great Glemham Saxmundham Suffolk IP17 2DJ
Continued use as mixed-use residential dwelling and bed and breakfast accommodation.
-
DC/26/3221/CLP Awaiting decision
21 Southfield Drive Leiston Suffolk IP16 4DP
Certificate of Lawful Use (Proposed) - Installation of three new roof windows to convert existing loft space
-
DC/26/2553/CLP Granted
10 Waveney Road Beccles Suffolk NR34 9NW
Certificate of Lawful Use (Proposed) - Garden room. This will be to the rear left of the garden as you look from the front of the house. It is 6870mm wide, 3150mm deep and 2465mm high. It will be used as an office/bar. No new access is required. Ground screws will be used for the base.