Planning application
East Anglia THREE Lowestoft Suffolk
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of Requirement 28 (Lowestoft Port Travel Plan Operational & Maintenance Phase) for the Operations and Maintenance Phase of East Anglia THREE Offshore Wind Farm Development Consent Order
As published by the council, reference DC/26/0723/DRR
Application record
- Reference
- DC/26/0723/DRR
- Type
- Discharge of Requirements (56 days)
- Status
- Awaiting decision
- Received
- 19 Feb 2026
- Validated
- 19 Feb 2026
- Ward
- Harbour And Normanston
- Parish
- Lowestoft
Timeline
Dates from the published record
-
19 Feb 2026
Received by East Suffolk
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 16 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Suffolk took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided condition discharge and variation applications in a median of 51 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Lowestoft Port ZS Hamilton House Battery Green Road Lowestoft Suffolk NR32 1DE
Consultation - Removal of 6 no. existing antennas and installation of 9 no. new antennas with supporting steelwork, 1 no. transmission dish, and ancillary development thereto.
Granted Outline 6 docs -
Lowestoft Port Hamilton House Battery Green Road Lowestoft Suffolk NR32 1DE
Consultation - Removal of 6 no. existing antennas and installation of 9 no. new antennas with supporting steelwork, 1 no. transmission dish, and ancillary development thereto
Granted Outline 1 doc -
Owl Building Battery Green Road Lowestoft Suffolk NR32 1DH
84% historically approved · decision due ~12 Mar
Non-Illuminated Advertisement Consent - Billboard mounted to side of building for multiple advertisements
Awaiting decision Advertising 5 docs -
Land Adjacent To Newcombe House Newcombe Road Lowestoft Suffolk NR32 1XA
Non Material Amendment of DC/22/4533/FUL - Demolition of all existing buildings within the boundary except for Newcombe House and the external concrete slab surfacing around Newcombe House up to southern and western boundary and the single storey storage outbuilding on the northern boundary. The construction of 16 industrial units split between 5 buildings. The scheme will include all associated landscape works. - Installation of approx. 150m of weld mesh fencing along eastern and part of northern and southern boundaries.
Granted Amendments Demolition 4 docsSmall domestic -
R J Pryce And Co Ltd Trinity Road Lowestoft Suffolk NR32 1XJ
99% historically approved · decision due ~15 Oct
Discharge of Conditions Nos. 5, 10 & 24 and BNG Condition of DC/26/0918/FUL - East Anglia Three Land Base: Redevelopment of the former RJ Pryce site for use as offices, facilities and warehouse - Demolition Environmental Management Plan; Demolition Surface Water Management Plan; Biodiversity Gain Plan
Awaiting decision Conditions Demolition 10 docs -
R J Pryce And Co Ltd Trinity Road Lowestoft Suffolk NR32 1XJ
93% historically approved · decision due ~21 May
East Anglia Three Land Base: Redevelopment of the former RJ Pryce site for use as offices, facilities and warehouse in connection with ScottishPower Renewables (UK) Limited.
Awaiting decision Full applications 21 docs
Other condition discharge and variation applications
In East Suffolk
-
DC/26/1893/DRC Granted
The Workshop Brick Kiln Lane Melton Woodbridge Suffolk IP12 2PB
Discharge of conditions 7 and 10 of DC/23/2365/FUL - Demolition of existing workshop buildings, erection of replacement workshop, authorisation of existing workshop extensions, associated works. - Condition 7 - Construction Management Plan; Condition 10 - Noise Management Plan
-
DC/26/2573/DRC Granted
North Suffolk Skills Academy Harrisons Lane Halesworth Suffolk IP19 8PY
Discharge of condition Nos. 14, 19 & 26 of DC/21/0007/FUL - Change of use to sports facilities comprising new grass football pitch adjacent to Harrisons Lane and construction of a new artificial football pitch with associated parking, access, lighting, acoustic fencing and drainage adjacent to the Apollo Youth Centre and adjacent field to the south. - 14 - Construction Mngt Plan, 19 - Construction and Phasing Plan and 26 - Surface Water
-
DC/26/2736/DRC Granted
Land Adj School Road Church Road Ringsfield Suffolk
Discharge of Condition No. 10 of DC/25/3030/VOC - Variation of Condition No. 2 of DC/17/2934/VOC - Construction of 10 No.Holiday Lodges, 1 No. retail unit and 1 No. self contained flat. This application is seeking modification to the appearance and layout of the originally approved lodges - discharge of surface water
-
DC/26/3165/DRC Awaiting decision
Timber Mill Barns Sizewell Hall Road Leiston Suffolk IP16 4TT
Discharge of Condition Nos. 18, 21 and 23 of DC/25/1355/FUL - Alterations to the existing structure & external envelope as part of the formation of two residential dwellings from agricultural barn - 18. Construction Method Statement 21. Emergency Demolition/Construction Manangement Plan 23. Radiation Emergency Contingency Plan.
-
DC/26/3167/DRC Awaiting decision
St Michaels Church Church Street Framlingham Suffolk IP13 9BQ
Discharge of Condition No. 3 of DC/26/1993/FUL - Rebuilding of a brick bounday wall - Archaeological Monitoring