Proposal

Discharge of Requirement 28 (Lowestoft Port Travel Plan Operational & Maintenance Phase) for the Operations and Maintenance Phase of East Anglia THREE Offshore Wind Farm Development Consent Order

As published by the council, reference DC/26/0723/DRR

Timeline

Dates from the published record

  1. 19 Feb 2026

    Received by East Suffolk

  2. 24 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with East Suffolk for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • DC/26/2259/CON Awaiting decision

    Lowestoft Port ZS Hamilton House Battery Green Road Lowestoft Suffolk NR32 1DE

    Consultation - Removal of 6 no. existing antennas and installation of 9 no. new antennas with supporting steelwork, 1 no. transmission dish, and ancillary development thereto.

    18 Jun 2026 68m away Outline
  • DC/26/0918/FUL Awaiting decision

    R J Pryce And Co Ltd Trinity Road Lowestoft Suffolk NR32 1XJ

    East Anglia Three Land Base: Redevelopment of the former RJ Pryce site for use as offices, facilities and warehouse in connection with ScottishPower Renewables (UK) Limited.

    6 Mar 2026 196m away Full applications
  • DC/26/2118/RG3 Awaiting decision

    Battery Green Car Park And Surrounding Land Marina Road Lowestoft Suffolk NR32 1HA

    New cultural building consisting of single and two storey elements, containing multi use hall, lobby, cafe, studio spaces, creative hub, plant areas, and first floor multi use space. Construction of restaurant building. Creation of new plazas and public realm, new soft and hard landscaping with external lighting scheme to create new linkages. Retention of Marina Centre as constructed. Realignment of Marina Road. New public toilets and changing area

    9 Jun 2026 221m away
  • DC/26/2186/DRC Awaiting decision

    Hamilton Docks Hamilton Road Lowestoft Suffolk NR32 1XF

    Discharge of Condition No. 13 of DC/23/1674/FUL - Demolition and development of warehousing and offices to store parts for off-shore renewable infrastructure. - Construction Surface Water Management Plan

    12 Jun 2026 244m away Conditions
  • DC/26/1587/AME Granted

    Hamilton Docks Hamilton Road Lowestoft Suffolk NR32 1XF

    Non Material Amendment of DC/23/1674/FUL - Demolition and development of warehousing and offices to store parts for off-shore renewable infrastructure - 1. Change in cladding types to the offices to a flush cladding panel rather than profile. 2. Change in colour of cladding trims from Goosewing Grey RAL 7038 to Anthracite RAL 7016. 3. Change in position and size of windows to support a revised internal layout. 4. Additional internal office and welfare accommodation. 5. The position of the eastern elevation of the building has moved 1.5 metres to the west. The parking to the front elevation has been revised to support this. 6. Introduction of revolving door to front elevation

    28 Apr 2026 250m away Amendments
  • DC/25/2521/ADI Granted

    Marina Theatre Marina Lowestoft Suffolk NR32 1HH

    Illuminated Advertisement Consent - 1 - LED wrap around screen to front of fascia of canopy above new entrance porch (see planning permission PP-12293474). 2 - Freestanding letters on top of canopy above new entrance porch (see planning permission PP-12293474). 3 - New poster advertisement banner on existing rotunda. 4 - Individual illuminated letters on brick buttress.

    25 Jun 2025 253m away Advertising

In East Suffolk

  • DC/26/2680/DRC Awaiting decision

    Land At Hartree Way Kesgrave Suffolk

    Discharge of Condition No. 9 of DC/25/0549/VOC - Variation of Condition No.2 of DC/15/1900/FUL - Erection of new foodstore, creation of car park, vehicular access and associated external works - Location and detail of fixed plant equipment

    29 Jul 2026 Conditions
  • DC/26/2662/DRC Awaiting decision

    Land Adjacent 29 Mill Road Newbourne Woodbridge Suffolk

    Discharge condition No. 4 of DC/26/1234/ARM - Approval of Reserved Matters of DC/23/3790/OUT - Outline Application (With some Matters Reserved) - Erection of two detached dwellings (resubmission) - Appearance, Landscaping, Layout and Scale. - Demolition Method Statement

    28 Jul 2026 Conditions
  • DC/26/2652/DRC Awaiting decision

    Elm Tree Cottage The Street Farnham Saxmundham Suffolk IP17 1JZ

    Discharge of Condition No. 3 of DC/23/3272/LBC - Listed Building Consent - Re-roofing work to C19 single storey extension, alteration of chimney stack and fireplaces, replacement of door and frame along eastern elevation, damp proofing works, re-instatement of window along the western façade of the single storey extension, replacement of new floor boards in bedroom with reclaimed boards to match existing original boards and cleaning of exposed internal timbers to remove paint covering - External door, window and French doors details.

    27 Jul 2026 Conditions
  • DC/26/2567/DRC Awaiting decision

    Felixstowe Ferry Golf Club Ferry Road Felixstowe Suffolk IP11 9RY

    Discharge of Conditions 16, 17, 26, 36, 38, & 39 of DC/24/0400/VOC - Variation of Condition No. 2 and the details to discharge Condition 19 of DC/22/0361/VOC (Variation of Condition No.2 of DC/19/5049/FUL - Redevelopment of site to provide new clubhouse and new public facilities to include cafe, putting green, toilets and viewing platform, improved access, parking, 5 detached dwellings and associated landscaping, relocation of existing watch tower - existing clubhouse and pro-shop buildings to be demolished - Since planning consent was granted a full design team has been instructed and during the progression of the detailed design (including structural design), some design changes have been implemented to improve the buildability of the proposed dwellings and the clubhouse, include the aligning of structural elements. The clubhouse has now been amended to single storey, with a minimal increase in footprint and a reduction in floor level, whilst the essence of the design has been retained. Other minor fenestration/glazing revisions have also been proposed. - existing clubhouse and pro-shop buildings to be demolished - Since planning consent was granted a full design team has been instructed and during the progression of the detailed design ...end of text...For further information contact local authority Discharging with: Condition 16 - 15001 FFGC Noise Impact Assessment Report 1attached Condition 17 - FFGC Extract Ventilation attached Condition 26 - Asset-data-collection-form - Felixstowe Condition 36 - WK Drawing PA_106A Residential Development layout Condition 38 - WK Drawing PA_106A Residential Development layout Condition 39 - Water Efficiency Calculator attached

    27 Jul 2026 Conditions
  • DC/26/2635/DRC Awaiting decision

    Alde Valley High School Seaward Avenue Leiston Suffolk IP16 4BG

    Discharge of Condition Nos 5a, 5b, 6, and 9 of DC/23/4556/FUL - Creation of new Artificial Grass Pitch (AGP) and separate Muga pitch, installation of new 4.5m high ball stop fencing and entrance gates to AGP perimeter, installation of a new 2.0m high and 1.2m high pitch perimeter barrier and entrance gates within AGP enclosure, installation of new hard standing areas, installation of new floodlight system to both AGP and Muga pitches, installation of new maintenance equipment store located within AGP enclosure, installation of new hardstanding walkway between existing leisure centre/SGP grass pitch and Mug pitches. - 5a. Fifa Certification of Quality - 5b. Registration on Football Association's Register of Football Turf Pitches - 6. Community Use Agreement - 9. Surface water drainage verification

    24 Jul 2026 Conditions