Planning application

East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

Granted East Suffolk DC/25/4399/DRR Discharge of Requirements (56 days)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of Requirement 22 (2)(f) (Air Quality Management Plan) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

As published by the council, reference DC/25/4399/DRR

Application record

Reference
DC/25/4399/DRR
Type
Discharge of Requirements (56 days)
Status
Permitted
Decision
Application Permitted
Received
13 Nov 2025
Validated
13 Nov 2025
Decided
23 Jan 2026
Ward
Woodbridge
Parish
Woodbridge
Decision by
Delegated Decision

Site history

Applications at this address on the East Suffolk register

This site has had 9 applications since 2025: 8 approved, 0 refused.

  • DC/25/4403/DRR Granted

    East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 22 (2)(k) (Watercourse Crossing Method Statement) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Decided 21 Jan 2026 Conditions
  • DC/25/4366/DRR Granted

    East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 22 (2)(d) (Site Waste Management Plan) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Decided 21 Jan 2026 Conditions
  • DC/25/4059/DRR Granted

    East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 22 (Code of Construction Practice) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Decided 18 Nov 2025 Conditions
  • DC/25/4013/DRR Awaiting decision

    East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 22(2)(h) (Pollution Prevention and Response Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Submitted 17 Oct 2025 Conditions
  • DC/25/4006/DRR Granted

    East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 22(2)(j) (Construction Artificial Light Emissions Management Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Decided 11 Dec 2025 Conditions
  • DC/25/4004/DRR Granted

    East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 18(1) and (2) (Contaminated Land Mitigation Scheme) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Decided 10 Dec 2025 Conditions
  • DC/25/3847/DRR Granted

    East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 22 (2)(e) (Soil Management Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Decided 4 Dec 2025 Conditions
  • DC/25/2765/CCC Granted

    East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    County Council Consultation - SCC/0099/25/DoR - Discharge of Requirement 19 (1) pre-commencement archaeology execution plan, requirement 20(1) archaeology, and requirement 32(1) prow strategy for new footpath creation works, in respect of Scottish Power Renewables East Anglia ONE North Wind Farm

    Decided 14 Aug 2025 Outline

Timeline

Dates from the published record

  1. 13 Nov 2025

    Received by East Suffolk

  2. 23 Jan 2026

    Decision issued: Application Permitted

  3. 9 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

East Suffolk granted permission on 23 January 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • East Anglia ONE North Offshore Wind Farm Suffolk

    DC/25/4120/CCC Submitted 24 Oct 2025 0m away

    County Council Consultation - Discharge of Requirement 33 Emergency Planning Arrangements for the Onshore Substation Stage and Onshore Cable Stage, and Offshore Works Phase in respect of Scottish Power Renewables East Anglia ONE North Offshore Wind Farm

    Granted Outline 6 docs
  • East Anglia TWO Offshore Wind Farm Suffolk

    DC/25/4121/CCC Submitted 24 Oct 2025 0m away

    County Council Consultation - Discharge of Requirement 33 Emergency Planning Arrangements for the Onshore Substation Stage and Onshore Cable Stage, and Offshore Works Phase in respect of Scottish Power Renewables East Anglia TWO Offshore Wind Farm

    Granted Outline 6 docs
  • East Anglia ONE North Offshore Wind Farm Suffolk

    DC/25/4515/DRR Submitted 21 Nov 2025 0m away

    Discharge of Requirement 22(2)(c) (Construction Phase Noise and Vibration Management Plan) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Granted Conditions 6 docs
  • East Anglia ONE North Offshore Wind Farm Suffolk

    DC/25/4823/CCC Submitted 12 Dec 2025 0m away

    Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Granted Outline 7 docs
  • East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    DC/25/4827/DRR Submitted 12 Dec 2025 0m away

    99% historically approved · decision due ~6 Feb

    Discharge of Requirement 12 (1) to (16) (Detailed Design) Substations Stage of East Anglia TWO Offshore Wind Farm Development Consent Order

    Awaiting decision Conditions 10 docs
  • East Anglia ONE North Offshore Wind Farm Suffolk

    DC/25/4100/DRR Submitted 22 Oct 2025 0m away

    Discharge of Requirement 14(1) (Landscape Management Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Granted Conditions 7 docs

In East Suffolk

  • DC/26/2035/DRC Split decision

    The Old Rectory The Street South Elmham St Margaret Harleston Suffolk IP20 0PJ

    Discharge of Condition Nos. 4, 5, 6, 7, 10, 11, 12, 13, 14, 16, 17, 18, 19, 20, 21, 22, 23, 24, 27, 28 and 30 of DC/24/4379/LBC - Listed Building Consent - Partial Demolition, extension and internal reordering, plus conversion and repair of outbuildings - Supporting Statement and Drawings submitted

    2 Jun 2026 Conditions
  • DC/26/2017/DRC Granted

    Hand Car Wash Montrose Service Garage London Road Beccles Suffolk NR34 9YU

    Discharge of Condition No. 3 of DC/25/3495/FUL - Erection of a two-storey, 66-bed care home for the elderly with associated access, parking, landscaping, and ancillary buildings, following the demolition of existing garages and associated structures - Fuel Tank and Canopy Removal

    1 Jun 2026 Conditions
  • DC/26/3060/DRC Awaiting decision

    25 Cotmer Road Lowestoft Suffolk NR33 9PN

    Discharge of Condition No. 14 of DC/24/1151/FUL - Sub division of gardens to create 2 plots and construction of 2 detached bungalows with integral garages - Water Calculations

    28 Aug 2026 Conditions
  • DC/26/2904/DRC Granted

    North Suffolk Skills Academy Harrisons Lane Halesworth Suffolk IP19 8PY

    Discharge of Condition No. 3 of DC/21/0007/FUL - Change of use to sports facilities comprising new grass football pitch adjacent to Harrisons Lane and construction of a new artificial football pitch with associated parking, access, lighting, acoustic fencing and drainage adjacent to the Apollo Youth Centre and adjacent field to the south - Demolition and Construction Management Strategy

    14 Aug 2026 Conditions
  • DC/26/3028/DRR42 Awaiting decision

    Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    Development Consent Order Requirement 9 - Main Development Site: Site Clearance of the Sizewell C Development Consent Order

    26 Aug 2026 Conditions