Planning application
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
County Council Consultation - SCC/0099/25/DoR - Discharge of Requirement 19 (1) pre-commencement archaeology execution plan, requirement 20(1) archaeology, and requirement 32(1) prow strategy for new footpath creation works, in respect of Scottish Power Renewables East Anglia ONE North Wind Farm
As published by the council, reference DC/25/2765/CCC
Application record
- Reference
- DC/25/2765/CCC
- Type
- Consultation by County Council
- Status
- Responded
- Decision
- Granted As published: No Objections
- Received
- 14 Jul 2025
- Validated
- 14 Jul 2025
- Decided
- 14 Aug 2025
- Ward
- Woodbridge
- Parish
- Woodbridge
- Decision by
- Delegated Decision
Site history
Applications at this address on the East Suffolk register
This site has had 10 applications since 2025: 9 approved, 0 refused.
-
DC/25/4403/DRR Granted
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 22 (2)(k) (Watercourse Crossing Method Statement) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4399/DRR Granted
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 22 (2)(f) (Air Quality Management Plan) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4366/DRR Granted
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 22 (2)(d) (Site Waste Management Plan) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4059/DRR Granted
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 22 (Code of Construction Practice) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4013/DRR Awaiting decision
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 22(2)(h) (Pollution Prevention and Response Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4006/DRR Granted
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 22(2)(j) (Construction Artificial Light Emissions Management Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4004/DRR Granted
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 18(1) and (2) (Contaminated Land Mitigation Scheme) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/3847/DRR Granted
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 22 (2)(e) (Soil Management Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/0987/DRR Granted
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 22 (2)(k) (Watercourse Crossing Method Statement) Substations Haul Road Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
Timeline
Dates from the published record
-
14 Jul 2025
Received by East Suffolk
-
14 Aug 2025
Decision issued: No Objections
-
2 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
East Suffolk granted permission on 14 August 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 22 (Code of Construction Practice) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
Granted Conditions 11 docs -
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 22(2)(j) (Construction Artificial Light Emissions Management Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
Granted Conditions 8 docs -
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 18(1) and (2) (Contaminated Land Mitigation Scheme) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
Granted Conditions 8 docs -
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
99% historically approved · decision due ~12 Dec
Discharge of Requirement 22(2)(h) (Pollution Prevention and Response Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
Awaiting decision Conditions 3 docs -
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 22 (Code of Construction Practice) Substations Haul Road Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
Granted Conditions 11 docs -
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 22 (2)(e) (Soil Management Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
Granted Conditions 6 docs
Other outline applications
In East Suffolk
-
DC/26/3004/CCC Granted
A12 Between Junctions 58 (Seven Hills) And Woods Lane Roundabout Woodbridge Suffolk
County Council Consultation - Transport improvements to the A12 from Junction 58 (Seven Hills, Ipswich) to Woods Lane Roundabout, Woodbridge including the upgrade from a single carriageway to dual carriageway between A12 / B1438 and the A12 / B1078, Construction of a new pedestrian bridge and other highways and pedestrian improvements.
-
DC/26/3240/PDN Granted
Proposed Substation Adjacent Broombank Saxmundham Road Aldeburgh Suffolk
Installation of a substation within a land plot of 3m x 3m located near Saxmudham Road, Aldeburgh
-
DC/26/3256/CON Granted
Bank And Premises Exchange Square Beccles Suffolk NR34 9HH
Consultation - New Pavement Licence for Pascolo Lounge, Beccles 4 tables and 8 chairs Front of the premises: left-hand side 1.6m x 3.5m, right-hand side 1.6m x 2.5m Monday to Sunday 08:00 to 23:00
-
DC/26/3255/CON Granted
YouDrink Bottleshop & Taproom 4 Thoroughfare Halesworth Suffolk IP19 8AH
Consultation - RENEWAL of pavement licence - 2 tables 4 chairs, Area infront of the premises - 5.2m x 2.5m, Monday to Sunday 09:00 until 23:00
-
DC/26/3431/CON Awaiting decision
Black Barn Farm Monewden Road Charsfield Woodbridge Suffolk IP13 7QE
Consultation - To install electronic communications apparatus/development ancillary to radio equipment housing on behalf of Cornerstone.