Skip to content
PlanIndex Get alerts
Menu

Planning application

Land South Of Hogg Lane Ilketshall St Lawrence Suffolk

Awaiting decision East Suffolk DC/25/1598/VLA Variation of Legal Agreement

Works: New dwelling

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Variation of Legal Agreement of DC/23/3045/FUL - Mixed residential development of twenty-five mixed tenure dwellings (Phased Development) - The trigger point of the S106 obligation (On site Open Space Provision & Maintenance: Point 3.1) does not work with the phasing of the scheme.

As published by the council, reference DC/25/1598/VLA

Application record

Reference
DC/25/1598/VLA
Type
Variation of Legal Agreement
Status
Awaiting decision
Received
16 Apr 2025
Validated
16 Apr 2025
Ward
Bungay And Wainford
Parish
Ilketshall St Lawrence

Site history

Applications at this address on the East Suffolk register

This site has had 2 applications since 2025.

  • DC/26/1000/AME Awaiting decision

    Land South Of Hogg Lane Ilketshall St Lawrence Suffolk

    Non-Material Amendment of DC/23/3045/FUL -Mixed residential development of twenty-five mixed tenure dwellings (Phased Development) - To reduce the footway width, outside the site boundary, from 2m down to 1.2m, and provision of crossing point.

    Submitted 12 Mar 2026 Amendments

Timeline

Dates from the published record

  1. 16 Apr 2025

    Received by East Suffolk

  2. 27 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 11 June 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Suffolk took a median of 53 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Qube Design Group Ltd Agent, a design practice registered in Beccles

Active · incorporated 2018 · Beccles

65 applications on PlanIndex · across 7 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided condition discharge and variation applications in a median of 51 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land South Of Hogg Lane Ilketshall St Lawrence Suffolk

    DC/26/1000/AME Submitted 12 Mar 2026 0m away

    91% historically approved · decision due ~7 May

    Non-Material Amendment of DC/23/3045/FUL -Mixed residential development of twenty-five mixed tenure dwellings (Phased Development) - To reduce the footway width, outside the site boundary, from 2m down to 1.2m, and provision of crossing point.

    Awaiting decision Amendments New dwelling 3 docs
  • Land To Rear Of 3 & 4 Hogg Lane Ilketshall St Lawrence Suffolk NR35 8ND

    DC/25/4145/FUL Submitted 27 Oct 2025 199m away

    Change of Use of part of land from agricultural to small holding. Hard standing area, fenced paddocks, animal pens and sheds, electric meter housing and pole. Part retrospective.

    Granted Full applications 20 docs
  • Avenida Halesworth Road Ilketshall St Lawrence Beccles Suffolk NR34 8LB

    DC/26/1506/FUL Submitted 22 Apr 2026 373m away

    Construction of two storey side extension

    Refused Full applications Extension 15 docs

In East Suffolk

  • DC/26/1893/DRC Granted

    The Workshop Brick Kiln Lane Melton Woodbridge Suffolk IP12 2PB

    Discharge of conditions 7 and 10 of DC/23/2365/FUL - Demolition of existing workshop buildings, erection of replacement workshop, authorisation of existing workshop extensions, associated works. - Condition 7 - Construction Management Plan; Condition 10 - Noise Management Plan

    Received 21 May, published by the council 24 Jul 2026 Conditions
  • DC/26/2573/DRC Granted

    North Suffolk Skills Academy Harrisons Lane Halesworth Suffolk IP19 8PY

    Discharge of condition Nos. 14, 19 & 26 of DC/21/0007/FUL - Change of use to sports facilities comprising new grass football pitch adjacent to Harrisons Lane and construction of a new artificial football pitch with associated parking, access, lighting, acoustic fencing and drainage adjacent to the Apollo Youth Centre and adjacent field to the south. - 14 - Construction Mngt Plan, 19 - Construction and Phasing Plan and 26 - Surface Water

    Received 20 Jul, published by the council 27 Jul 2026 Conditions
  • DC/26/2736/DRC Granted

    Land Adj School Road Church Road Ringsfield Suffolk

    Discharge of Condition No. 10 of DC/25/3030/VOC - Variation of Condition No. 2 of DC/17/2934/VOC - Construction of 10 No.Holiday Lodges, 1 No. retail unit and 1 No. self contained flat. This application is seeking modification to the appearance and layout of the originally approved lodges - discharge of surface water

    Received 3 Aug, published by the council 15 Aug 2026 Conditions
  • DC/26/3165/DRC Awaiting decision

    Timber Mill Barns Sizewell Hall Road Leiston Suffolk IP16 4TT

    Discharge of Condition Nos. 18, 21 and 23 of DC/25/1355/FUL - Alterations to the existing structure & external envelope as part of the formation of two residential dwellings from agricultural barn - 18. Construction Method Statement 21. Emergency Demolition/Construction Manangement Plan 23. Radiation Emergency Contingency Plan.

    Received 8 Sep, published by the council 17 Sep 2026 Conditions
  • DC/26/3167/DRC Awaiting decision

    St Michaels Church Church Street Framlingham Suffolk IP13 9BQ

    Discharge of Condition No. 3 of DC/26/1993/FUL - Rebuilding of a brick bounday wall - Archaeological Monitoring

    Received 8 Sep, published by the council 17 Sep 2026 Conditions