Planning application
East Anglia ONE Thorpeness Aldringham Cum Thorpe Suffolk
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
County Council Consultation - SCC/0101/24/DoR/EA1N - Discharge of requirements 19(1) pre-commencement archaeology execution plan, requirement 20(1) archaeology, for borehole survey works, in respect of Scottish Power Renewables East Anglia One North Offshore Wind Farms
As published by the council, reference DC/24/3471/CCC
Application record
- Reference
- DC/24/3471/CCC
- Type
- Consultation by County Council
- Status
- Permitted
- Decision
- Application Permitted
- Received
- 25 Sep 2024
- Validated
- 25 Sep 2024
- Decided
- 24 Oct 2024
- Ward
- Aldeburgh And Leiston
- Parish
- Aldringham Cum Thorpe
- Decision by
- Delegated Decision
Site history
Applications at this address on the East Suffolk register
This site has had 2 applications since 2024: 2 approved, 0 refused.
-
DC/24/2794/DRR Granted
East Anglia One Thorpeness Aldringham Cum Thorpe Suffolk
Discharge of Requirement 21(2) (Ecological Management Plan) and Requirement 26(1) (Onshore preparation works Management Plan) for the Archaeological Mitigation Works of the East Anglia ONE North Offshore Windfarm Development Consent Order
Timeline
Dates from the published record
-
25 Sep 2024
Received by East Suffolk
-
24 Oct 2024
Decision issued: Application Permitted
-
7 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
11 applications on PlanIndex · across 4 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
East Suffolk granted permission on 24 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
East Anglia Two Thorpeness Aldringham Cum Thorpe Suffolk
Discharge of Requirement 21(2) (Ecological Management Plan) and Requirement 26(1) (Onshore preparation works Management Plan) for the Archaeological Mitigation Works of the East Anglia TWO Offshore Windfarm Development Consent Order
Granted Conditions 10 docs -
East Anglia One Thorpeness Aldringham Cum Thorpe Suffolk
Discharge of Requirement 21(2) (Ecological Management Plan) and Requirement 26(1) (Onshore preparation works Management Plan) for the Archaeological Mitigation Works of the East Anglia ONE North Offshore Windfarm Development Consent Order
Granted Conditions 10 docs -
East Anglia ONE North Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 33 Emergency Planning Arrangements for the Onshore Substation Stage and Onshore Cable Stage, and Offshore Works Phase in respect of Scottish Power Renewables East Anglia ONE North Offshore Wind Farm
Granted Outline 6 docs -
East Anglia TWO Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 33 Emergency Planning Arrangements for the Onshore Substation Stage and Onshore Cable Stage, and Offshore Works Phase in respect of Scottish Power Renewables East Anglia TWO Offshore Wind Farm
Granted Outline 6 docs -
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 22(2)(c) (Construction Phase Noise and Vibration Management Plan) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
Granted Conditions 6 docs -
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
Granted Outline 7 docs
Other outline applications
In East Suffolk
-
DC/26/2769/EIA Decided
Land Off Ringsfield Road Beccles Suffolk
EIA Screening Opinion - Residential development of up to 270 dwellings, together with public open space, suitable alternative natural greenspace (SANG) and associated infrastructure.
-
DC/26/2834/CON Granted
Land To South Of Railway Line Westerfield Road Ipswich Suffolk
Consultation - Part discharge of condition 28 of outline planning permission IP/14/00638/OUTFL in relation to the Community Development Strategy and the full details of projects and measures for the pre-occupancy and early occupancy phase.
-
DC/26/3025/CON Awaiting decision
The Crown Hotel Market Hill Framlingham Woodbridge Suffolk IP13 9AP
Consultation - Renewal of pavement licence for 4 tables each with 3 chairs at the front of the premises, covering an area of left of the door (when facing premises) 11m in length & 1.5m wide and right of the door 8m in length & 1.5m wide. Between the hours of 07:30-23:00 Monday to Saturday and 8:00 to 18:00 Sunday.
-
DC/26/3031/CON Awaiting decision
79 Hamilton Road Felixstowe Suffolk IP11 7BE
Consultation - Renewal of pavement licence: 6 tables and 12 chairs Area in front of premises - 6m x 3.4m Tables 1 to 4 (located on pavement) - Monday to Sunday 08:00 to 16:00 Tables 5 and 6 (located on Hamilton Road) - Monday to Sunday 10:00 to 16:00
-
DC/26/2758/CON Granted
Garland Park Garland Park Avenue Rendlesham Woodbridge Suffolk
Consultation - Variation to Advanced Water Infrastructure Networks Limited, to allow it to supply Water and Sewerage services to a site called Garland Park, Woodbridge.