Skip to content
PlanIndex Get alerts
Menu

Archive · East Suffolk · 2025

Planning applications in East Suffolk, April 2025

Page 3 of 3, newest first. Back to the first page for April 2025.

Applications, April 2025

Newest first ยท page 3 of 3

  • DC/25/1463/ADI Granted

    52 Thoroughfare Woodbridge Suffolk IP12 1AL

    Illuminated Advertisement Consent - Installation of Banking Hub signage including, Acrylic letters to be fixed to an ACM panel which will be fixed to the existing marble shopfront. Displayed in the ground floor will be 2.no marketing posters, an A4 opening hours, DDA and A5 CCTV sign. Banking Hub advertisement will surround the ATM.

    Submitted 4 Apr 2025 Advertising
  • DC/25/1465/DRR Granted

    Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    Discharge of Requirement 5 (Main Development Site: Surface and Foul Water Drainage) Partial discharge for Main Development Site Roads Scheme (Work No. 1A(gg), 1A(hh), 1B and 1C) of Sizewell C Development Consent Order

    Submitted 4 Apr 2025 Conditions
  • DC/25/1481/VOC Awaiting decision

    Part Land Opposite Ashe Green Farm Ivy Lodge Road Campsea Ashe Suffolk

    Variation of Condition Nos. 2, 4, 11, 12, 14 and 17 of DC/21/4896/FUL - Change of use from agriculture to private horse riding school and livery, to create grazing paddocks, fence perimeter, build 12 stables, 10 riding school stables and storage and manege of 40m x 80m. Provision on field isolation shelter. As amended by revised plans and Design Report received on 08/02/2022 and further revised plans received 22/12/2022 - Minor changes to the design of the approved building and layout/function of the site. Revised external lighting scheme, including the provision of 11 x No. arena lighting columns. Conditions 4 and 14 only to be amended to refer to the updated drawings.

    Submitted 4 Apr 2025 Amendments
  • DC/25/1446/DRR Granted

    Sizewell C And Associated Development Sites Suffolk

    Discharge of Requirement 25 (Main development site: Fen Meadow) Halesworth (Work No. 6) of Sizewell C Development Consent Order

    Submitted 3 Apr 2025 Conditions
  • DC/25/1450/FUL Granted

    224 Kirkley Run Lowestoft Suffolk NR33 0NW

    Single storey rear extension

    Submitted 3 Apr 2025 Full applications
  • DC/25/1429/FUL Awaiting decision

    The Round House Boulge Road Burgh Woodbridge Suffolk IP13 6SU

    To replace, like for like, the wooden framed windows

    Submitted 2 Apr 2025 Full applications
  • DC/25/1434/ADI Granted

    East Of England Co-Op Supermarket 189 Hamilton Road Felixstowe IP11 7DT

    Illuminated Advertisement Consent - signage including x2 Sainsbury's Fascia Signs, x2 Argos Flex Signs, x1 Store Totem Sign, x1 Pedestrian Totem Sign, x1 ATM Surround Sign, x1 ATM Projecting Sign, x1 Welcome Wall Sign and Lightbox and various car park signage.

    Submitted 2 Apr 2025 Advertising
  • DC/25/1430/LBC Awaiting decision

    The Round House Boulge Road Burgh Woodbridge Suffolk IP13 6SU

    Listed Building Consent - To replace, like for like, the wooden framed windows

    Submitted 2 Apr 2025 Heritage and listed buildings
  • DC/25/1408/DRC Awaiting decision

    Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk

    Discharge of Condition Nos. 13, 14 & 23 of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure - Construction Environmental Management Plan (Biodiversity) / Landscape and Ecological Management Plan / Surface Water Details

    Submitted 1 Apr 2025 Conditions
  • DC/25/1421/VOC Granted

    The Old Police House Ipswich Road Orford Woodbridge Suffolk IP12 2LT

    Variation of Condition No. 2 of DC/24/0996/FUL - Demolition of existing attached garage and rear conservatory. Proposed ground floor side extension. Proposed two storey and single storey rear extension. Fitting replacement windows. Rebuilding a chimneystack. Overcladding the side and rear elevations of an existing ground floor extension with painted timber boarding. Reinstating the original central front door opening. Retiling the existing roof. Internal alterations.

    Submitted 1 Apr 2025 Amendments
  • DC/25/1410/DRR Granted

    Sizewell C And Associated Development Sites Suffolk

    Discharge of Requirement 25 Main Development Site: Fen Meadow (Work No. 7 Benhall) of Sizewell C Development Consent Order

    Submitted 1 Apr 2025 Conditions

Other months in 2025

All of 2025