Skip to content
PlanIndex Get alerts
Menu

Planning application

HUTTS FARM STANTON LANE ELLASTONE DE6 2HD

Awaiting decision East Staffordshire P/2026/00690 Change of Use

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use of land to a mixed use of domestic and doggy day care and change of use of existing stable block to doggy day care facility.

As published by the council, reference P/2026/00690

Application record

Reference
P/2026/00690
Type
Change of Use
Status
Live
Received
26 May 2026
Validated
26 Jun 2026
Ward
Stramshall & Weaver
Parish
Ellastone CP
Decision by
Delegated
Postcode
DE6 2HD

Timeline

Dates from the published record

  1. 26 May 2026

    Received by East Staffordshire

  2. 26 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 21 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Staffordshire took a median of 81 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

JMI Planning Ltd Agent, a planning consultancy registered in Uttoxeter

Active · incorporated 2016 · Uttoxeter

499 applications on PlanIndex · across 30 councils · 82% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with East Staffordshire for determination, against a statutory target of eight weeks. Over the last year East Staffordshire decided full applications in a median of 161 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Ousley Cross Farm Stanton Lane Ellastone Staffordshire DE6 2HD

    P/2016/00742 Submitted 26 May 2016 250 yards away

    Prior approval for the conversion of an agricultural building to form a dwelling

    Withdrawn Prior approval 10 docs
    Domestic
  • The Rowan Bank Stanton Lane Ellastone DE6 2HD

    P/2017/00993 Submitted 3 Aug 2017 300 yards away

    Application under Section 73 of the Town and Country Planning Act 1990 for a Minor Material Amendment for the demolition of existing dwelling and structures and erection of a replacement detached dwelling, construction of vehicular access and installation of package treatment plant without complying with Condition 2 of planning permission P/2016/00170 relating to the omission of oak frame and change of material to natural stone

    Granted Amendments New dwelling Demolition 4 docs
    Domestic
  • The Rowan Bank Stanton Lane Ellastone Staffordshire DE6 2HD

    P/2015/00843 Submitted 5 Jun 2015 300 yards away

    Demolition of existing dwelling and structures and erection of a replacement detached dwelling, construction of veicular access and installation of package treatment plant

    Withdrawn Full applications New dwelling Demolition 13 docs
    Domestic
  • The Rowan Bank Stanton Lane Ellastone DE6 2HD

    P/2016/01436 Submitted 3 Oct 2016 300 yards away

    Discharge of conditions 3, 4, 6 & 17 of planning permission P/2016/00170 relating to demolition of existing dwelling and structures and erection of a replacement detached dwelling, construction of vehicular access and installation of package treatment plant.

    Granted Conditions New dwelling Demolition
    Domestic
  • The Rowan Bank Stanton Lane Ellastone DE6 2HD

    P/2018/00450 Submitted 3 Apr 2018 300 yards away

    Erection of a detached garage and garden store with first floor music and exercise studio

    Granted Full applications 8 docs
  • The Rowan Bank Stanton Lane Ellastone Staffordshire DE6 2HD

    P/2016/00170 Submitted 3 Feb 2016 300 yards away

    Demolition of existing dwelling and structures and erection of a replacement detached dwelling, construction of vehicular access and installation of package treatment plant

    Granted Full applications New dwelling Demolition 14 docs
    Domestic

In East Staffordshire

  • P/2026/00701 Granted

    10 NORMAN ROAD TUTBURY DE13 9JZ

    Change of use from C3 to C2 children care home for up to two children.

    Received 24 Jun, published by the council 22 Jul 2026 Full applications
  • P/2025/01398 Granted

    JOHN TAYLOR HIGH SCHOOL DUNSTALL ROAD BARTON UNDER NEEDWOOD DE13 8AZ

    Construction of outdoor artificial sports pitch and cricket strip including 6 no 13m high floodlights, 4.5m high perimeter fencing, installation of modular toilet and changing block, associated groundworks and formation of new pathway

    Received 24 Nov, published by the council 22 Jul 2026 Full applications
  • P/2026/00895 Granted

    ENVIRONMENT AGENCY UTTOXETER DEPOT DERBY ROAD UTTOXETER ST14 5AA

    Installation of 1no. air source heat pump with associated base

    Received 21 Jul, published by the council 22 Aug 2026 Full applications
  • P/2026/00633 Refused

    LAND ADJACENT TO 67 HOPLEY ROAD ANSLOW DE13 9PZ

    Erection of a detached dwelling

    Received 27 Apr, published by the council 22 Jul 2026 Full applications
  • P/2026/00913 Granted

    ROEBUCK INN TOBYS HILL DRAYCOTT IN THE CLAY DE6 5BT

    Removal and relocation of the existing liquefied petroleum gas storage tank with associated 1.8m high fencing, gates & fire wall, 0.9m bollards and car park alterations

    Received 10 Aug, published by the council 2 Sep 2026 Full applications