Planning application
Bempton Lane Agricultural Land Bempton Lane Bridlington East Riding Of Yorkshire YO16 6HG
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of 142 dwellings, construction of access and associated infrastructure, drainage and public open space
As published by the council, reference 26/01531/REG3
Application record
- Reference
- 26/01531/REG3
- Type
- Regulation 3 - Development by Council
- Status
- Pending Consideration
- Received
- 16 Jun 2026
- Validated
- 20 Jul 2026
- Ward
- Bridlington North
- Parish
- Bridlington Town Council
- Decision by
- Delegated Decision
- Postcode
- YO16 6HG
Timeline
Dates from the published record
-
16 Jun 2026
Received by East Riding of Yorkshire
-
20 Jul 2026
Validated
Checked as complete and ready for consideration.
-
30 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 14 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Riding of Yorkshire took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
East Riding Of Yorkshire Council Applicant
31 applications on PlanIndex · 96% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
144 documents on file for this application
- . TRANSPORT PLANNING
- AMENDED - PLOT ACCOMMODATION SCHEDULE
- AMENDED - VEHICLE TRACKING SHEET 2 OF 2 TURNING HEADS
- AMENDED - VEHICLE TRACKING SHEET 1 OF 2 SPINE ROAD JUNCTION
- SUPERSEDED - PLOT ACCOMMODATION SCHEDULE
- . OPSCG OUTDOOR PLAY SPACE CONSULTATION GROUP
- AMENDED - PROPOSED SITE BLOCK PLAN
- AMENDED - PARAMETER PLAN - TRANSPORT
- AMENDED - TRANSPORT ASSESSMENT
- JAMES GOODYEAR - DEVELOPMENT MANAGEMENT ARCHAEOLOGIST
- . NATURE CONSERVATION OFFICER
- MISS CAROLINE SUMNER
- YORKSHIRE WATER AUTHORITY
- . BRIDLINGTON TOWN COUNCIL
- MRS MAUREEN BELL(FULL)
- EDUCATION
- HUMBERSIDE FIRE & RESCUE
- ENVIRONMENTAL CONTROL
- . LLFA - LEAD LOCAL FLOOD AUTHORITY
- . LAND DRAINAGE
- MRS TRACY ROKAHR
- ADVERT - BRIDLINGTON FREE PRESS
- ACTIVE TRAVEL
- ENVIRONMENT AGENCY
- MR GARY ANSELL
- APPLICATION FORM
- EXISTING SITE PLAN - CHILDREN AND YOUNG PERSON OPEN SPACE PROVISION
- SUPERSEDED - CIVIL AND STRUCTURAL REPORT - VEHICLE TRACKING - SHEET 2 OF 2 - TU
- SUPERSEDED - CIVIL AND STRUCTURAL REPORT - VEHICLE TRACKING - SHEET 1 OF 2 - SPI
- SURFACE FINISHES
- HOUSE TYPE 10 (SEMI) - ELEVATIONS AND PLANS
- HOUSE TYPE 10 (AS)/14 (AS)/10 (OP) (3 BLOCK) - ELEVATIONS AND PLANS
- HOUSE TYPE 11 (AS)/14 (AS)/10 (OP) (3 BLOCK) - ELEVATIONS AND PLANS
- HOUSE TYPE 10 (AS)/14 (OP)/11 (OP) (3 BLOCK) - ELEVATIONS AND PLANS
- HOUSE TYPE 20 (AS)/23 (OP) (SEMI) - ELEVATIONS AND PLANS
- HOUSE TYPE 31 (AS)/30 (OP) (SEMI) - ELEVATIONS AND PLANS
- HOUSE TYPE 40 (SEMI) - ELEVATIONS AND PLANS
- HOUSE TYPE 41 (OP)/40 (OP) (SEMI) - ELEVATIONS AND PLANS
- HOUSE TYPE 50 (AS)/51 (OP) (SEMI) - ELEVATIONS AND PLANS
- HOUSE TYPE 51 (AS)/50 (OP) (SEMI) - ELEVATIONS AND PLANS
- HOUSE TYPE 61 (AS)/60 (OP) (SEMI) - ELEVATIONS AND PLANS
- HOUSE TYPE BUNGALOW 70 (AS)/71 (OP) (4 BLOCK) - ELEVATIONS AND PLANS
- HOUSE TYPE BUNGALOW 70 (AS)/71 (OP)/71 (AS)/71 (OP)/72 (AS) (5 BLOCK) - ELEVATIO
- HOUSE TYPE BUNGALOW 81 (OP)/80 (OP) (SEMI) - ELEVATIONS AND PLANS
- HOUSE TYPE BUNGALOW 82 (AS)/ 10 (OP) (SEMI) - ELEVATIONS AND PLANS
- HOUSE TYPE FLAT 91 (AS)/92 (AS)/90 (OP) (3 BLOCK) - ELEVATIONS AND PLANS
- HOUSE TYPE FLAT 94 (AS)/92 (OP)/90 (AS) (6 BLOCK) - ELEVATIONS AND PLANS
- HOUSE TYPE FLAT 94 (AS)/92 (OP)/90 (AS) (6 BLOCK) - ELEVATIONS AND PLANS
- HOUSE TYPE FLAT 94 (AS)/92 (OP)/90 (AS) (6 BLOCK) - ELEVATIONS AND PLANS
- SUBSTATION - ELEVATIONS AND PLANS
- ROAD LIGHTING LAYOUT
- PARAMETER PLAN - FEDERATED HOUSE TYPES
- SUPERSEDED - PLOT ACCOMMODATION SCHEDULE
- PROPOSED FENCING ELEVATIONS
- LOCATION PLAN
- EXISTING SITE BLOCK PLAN
- SUPERSEDED - PROPOSED SITE BLOCK PLAN
- PROPOSED SITE GROUND FLOOR PLAN
- PROPOSED SITE PLAN - OPEN SPACE PROVISION
- PARAMETER PLAN - MATERIALS
- SUPERSEDED - PARAMETER PLAN - TRANSPORT
- PROPOSED VISUALS 1-4
- PROPOSED VISUALS 5-8
- HOUSE TYPE 20 (SEMI) - ELEVATIONS AND PLANS
- HOUSE TYPE 20 (AS)/21 (AS)/20 (OP) (3 BLOCK) - ELEVATIONS AND PLANS
- HOUSE TYPE 20 (AS)/21 (OP)/23 (AS) (3 BLOCK) - ELEVATIONS AND PLANS
- HOUSE TYPE 30 (AS)/31 (OP) (SEMI) - ELEVATIONS AND PLANS
- CIVIL AND STRUCTURAL REPORT - ADOPTABLE HIGHWAY - GENERAL ARRANGEMENT
- CIVIL AND STRUCTURAL REPORT - BEMPTON LANE FOUNDATION ZONING PLAN
- CIVIL AND STRUCTURAL REPORT - FOUNDATION SCHEDULE
- CIVIL AND STRUCTURAL REPORT - PHASE 2 INFILTRATION TESTING REPORT - SEE FRA
- TOPOGRAPHIC SURVEY - SHEET 01 OF 10
- TOPOGRAPHIC SURVEY - SHEET 02 OF 10
- TOPOGRAPHIC SURVEY - SHEET 03 OF 10
- TOPOGRAPHIC SURVEY - SHEET 04 OF 10
- TOPOGRAPHIC SURVEY - SHEET 05 OF 10
- TOPOGRAPHIC SURVEY - SHEET 06 OF 10
- TOPOGRAPHIC SURVEY - SHEET 07 OF 10
- TOPOGRAPHIC SURVEY - SHEET 08 OF 10
- TOPOGRAPHIC SURVEY - SHEET 09 OF 10
- TOPOGRAPHIC SURVEY - SHEET 10 OF 10
- UNDERGROUND UTILITY SURVEY - SHEET 1 OF 9
- UNDERGROUND UTILITY SURVEY - SHEET 2 OF 9
- UNDERGROUND UTILITY SURVEY - SHEET 3 OF 9
- UNDERGROUND UTILITY SURVEY - SHEET 4 OF 9
- UNDERGROUND UTILITY SURVEY - SHEET 5 OF 9
- UNDERGROUND UTILITY SURVEY - SHEET 6 OF 9
- UNDERGROUND UTILITY SURVEY - SHEET 7 OF 9
- UNDERGROUND UTILITY SURVEY - SHEET 8 OF 9
- UNDERGROUND UTILITY SURVEY - SHEET 9 OF 9
- EXISTING SITE SECTION A
- EXISTING SITE SECTION B
- EXISTING SITE SECTION C AND D
- PROPOSED SITE SECTION A
- PROPOSED SITE SECTION B
- PROPOSED SITE SECTION C AND D
- PARAMETER PLAN - TENURE
- DESIGN CODE COMPLIANCE CHECKLIST
- OPEN SPACE ASSESSMENT
- AFFORDABLE HOUSING STATEMENT
- VIABILITY APPRAISAL
- AIR QUALITY ASSESSMENT
- GEOPHYSICAL SURVEY
- BIODIVERSITY NET GAIN - BASELINE ONSITE HABITAT SURVEY REPORT (PRE-DEVELOPMENT)
- BIODIVERSITY NET GAIN - ASSESSMENT SUPPORTING DOCUMENT
- GROUND PENETRATING REPORT
- GROUND PENETRATING REPORT - 3D GRID SURVEY
- PRELIMINARY ECOLOGICAL APPRAISAL REPORT
- CIVIL AND STRUCTURAL REPORT
- TRAVEL PLAN
- CIVIL AND STRUCTURAL REPORT - PRELIMINARY CUT AND FILL
- CIVIL AND STRUCTURAL REPORT - PRELIMINARY SOAKAWAY AND SILT TRAP DETAILS
- CIVIL AND STRUCTURAL REPORT - PRELIMINARY SITE LEVELS
- PRELIMINARY DRAINAGE STRATEGY
- CIVIL AND STRUCTURAL REPORT - ACCESS ROAD - TYPICAL CROSS SECTION
- BUILDING FOR A HEALTHY LIFELSTYE - DESIGN APPRAISAL
- LANDSCAPE MANGEMENT PLAN - LANDSCAPE GENERAL ARRANGEMENT PLAN
- LANDSCAPE MANAGEMENT PLAN - AMENITY AND PLAY AREA (LAP)
- LANDSCAPE MANAGEMENT PLAN - SOFT LANDSCAPE STRATEGY
- LANDSCAPE MANAGEMENT PLAN - SOFT LANDSCAPE PALETTE
- LANDSCAPE MANAGEMENT PLAN - BOUNDARIES AND FENCING STRATEGY
- BIODIVERSITY NET GAIN - METRIC
- LANDSCAPE MANAGEMENT PLAN
- AIR SOURCE HEATING PUMP - LOCATIONS AND ACOUSTICS
- SUBSTATION/DISTRIBUTION SUBSTATION - ELEVATIONS AND PLANS
- ROADWAY LIGHTING REPORT - 9 DECEMBER 2024 - LIGHTING CLASS P4 - FOOTPATH - MAX S
- ROADWAY LIGHTING REPORT - 6 DECEMBER 2024 - LIGHTING CLASS P4 - MAX SPACING 39.5
- ROADWAY LIGHTING REPORT - 9 DECEMBER 2024 - LIGHTING CLASS P4 - MAX SPACING 44.5
- ROADWAY LIGHTING REPORT - 9 DECEMBER 2024 - LIGHTING CLASS P4 - FOOTPATH - MIN S
- ROADWAY LIGHTING REPORT - 9 DECEMBER 2024 - LIGHTING CLASS P4 - MIN SPACING 34.0
- ROADWAY LIGHTING REPORT - 6 DECEMBER 2024 - LIGHTING CLASS P4 - MIN SPACING 26.5
- NOISE IMPACT ASSESSMENT
- LANDSCAPE PROPOSAL - STAGE 3 REPORT
- PHASE II SITE INVESTIGATION INTERPRETATIVE GEOTECHNICAL AND GEOENVIRONMENTAL REP
- PHASE I SITE INVESTIGATION DESK STUDY REPORT
- ARCHAEOLOGICAL TRIAL TRENCH EVALUATION OSA REPORT
- DESKTOP UTILITIES REPORT
- LANDSCAPE CHARACTER ASSESSMENT
- ARBORICULTURAL REPORT, IMPACT ASSESSMENT AND METHOD STATEMENT
- FLOOD RISK ASSESSMENT
- BIODIVERSITY NET GAIN - POST DEVELOPMENT PLAN
- SUPERSEDED - TRANSPORT ASSESSMENT
- DESIGN AND ACCESS STATEMENT
- BIODIVERSITY NET GAIN - BASELINE PLAN
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with East Riding of Yorkshire for determination, against a statutory target of eight weeks. Over the last year East Riding of Yorkshire decided less common application types in a median of 78 days. More in our guide to how long planning decisions take.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
12 Derwent Gardens Bridlington East Riding Of Yorkshire YO16 6HH
Erection of two storey and single storey extensions to rear
Granted Full applications Extension 7 docsSmall domestic -
Land North Of Nostell Way Bridlington East Riding Of Yorkshire YO16 6FY
90% historically approved · decision due ~1 Oct
Variation of Condition 1 of planning permission 24/00501/STVAR (Variation to Condition 2 (Approved Plans - Proposed Site Layout Plan only) amendment to proposed adopted highways, alterations to the open space, repositioning of dwellings and substitution of house types following planning permission 22/00980/STPLF (Erection of 151 dwellings and associated infrastructure, drainage and open space) to allow a substitution of house types for Plots 52-58 and 61-92 and removal of detached garages to Plots 52, 59-60, 67, 70, 82, 83-86 and 88
Awaiting decision Amendments 32 docsMajor scheme -
Land North Of Pinfold House Pinfold Lane Bridlington East Riding Of Yorkshire YO16 7AF
Erection of plantroom and construction of external ASHP compound
Granted Full applications 23 docs -
Gleeson Development Site Bempton Lane Bridlington East Riding Of Yorkshire YO16 6HH
Erection of 2 substations
Granted Full applications 27 docs -
Land North Of Pinfold House Pinfold Lane Bridlington East Riding Of Yorkshire YO16 7AF
Submission of details required by Conditions 3 (External materials), 9 (Construction Traffic Management Plan (CTMP)), 10 (Temporary vehicle parking, loading, off-loading, manoeuvring and wheel wash facilities), 13 (Construction Emissions Management Plan), 19 (Method statement for the protection of groundwater) and 23 (Construction Method Statement) of planning permission 23/00790/STPLF
Granted Conditions 19 docs -
Field At Grid Reference 518323 469698 Bempton Lane Bridlington East Riding Of Yorkshire YO16 6GT
88% historically approved · decision due ~21 Jul
Erection of 67 dwellings including associated infrastructure, drainage and public open space
Awaiting decision Full applications 86 docsMajor scheme
Other less common application types
In East Riding of Yorkshire
-
26/00630/CM Granted
Anaerobic Digestion Plant Plaxton Bridge Road Woodmansey East Riding Of Yorkshire HU17 0RT
Variation of Condition 3 (fuel feedstock for AD Plant) of planning permission 15/03894/STPLF (Erection of an Anaerobic Digestion Plant to comprise two digester tanks, combined heat and power (CHP) containers, technical and pasteurisation buildings, substation and pumping station, transformer, glycerine tanks, centrifuge and drier (Resubmission of 15/02417/STPLF)) to allow for varying of wording to condition 3
-
26/01696/REG3 Granted
South Cliff Holiday Park Solar Farm Pioneer Road Wilsthorpe East Riding Of Yorkshire YO15 3QJ
Installation of substation/battery infrastructure to approved solar farm extension (Application No. 25/03255/REG3)
-
26/00380/CM Withdrawn
Melton Recycling Facility Gibson Lane South Melton East Riding Of Yorkshire HU14 3HH
Removal of Condition 3 (Feedstock from Waste Transfer Station only) of planning permission 21/03258/CM (Variation of Condition 5 (hours of operation - to allow 24 hour operation of existing waste transfer station) of planning permission 20/03491/CM (Erection of an extension to existing waste storage building)
-
26/02379/REG3 Awaiting decision
5 Pasture Close Kilham East Riding Of Yorkshire YO25 4SE
Construction of access ramp with galvanised steel handrails and installation of a new front door with window following removal of existing window to front
-
26/01994/REG3 Awaiting decision
Burlington Centre Long Lane Bridlington East Riding Of Yorkshire YO16 7NE
Erection of 2.4m high closeboard fence