Proposal

Installation of a replacement 25m Monopole mast onto new concrete base to accommodate 6 no. Antenna and ancillary radio equipment, 1 no. GPS Module onto proposed gantry pole within compound, 1 no. replacement Equipment Cabinet within compound and ancillary development

As published by the council, reference 24/03160/TELCOM

Application record

Reference
24/03160/TELCOM
Type
Telecommunications - Prior Notifications
Status
Pending Decision
Decision
Required and Granted Prior Approval
Received
24 Oct 2024
Validated
24 Oct 2024
Decided
18 Dec 2024
Ward
Howdenshire
Parish
North Cave Parish Council
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 24 Oct 2024

    Received by East Riding of Yorkshire

  2. 18 Dec 2024

    Decision issued: Required and Granted Prior Approval

  3. 4 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

Nearby applications

Within 500 metres

  • 46 Nordham North Cave East Riding Of Yorkshire HU15 2LT

    26/01195/PLF Submitted 12 May 2026 348m away

    Erection of a one and a half storey extension to side and two storey and single storey extension to rear, construction of pitched roof over existing flat roof and erection of a porch, bay window and application of render to front

    Granted Full applications Extension Windows or glazing 10 docs
    Small domestic
  • Land North Of 20 Nordham North Cave East Riding Of Yorkshire HU15 2LT

    22/01575/VAR Submitted 10 May 2022 385m away

    Variation of Condition 1 (approved plans) of planning permission 17/02789/PLF and Appeal APPP/E2001/W/18/3204887 - Erection of a stable with hardstanding following demolition of existing stable - to allow windows into the building for natural light and surveillance

    Granted Amendments Demolition Windows or glazing 13 docs

In East Riding of Yorkshire

  • 26/01828/TELCOM Granted

    Telecommunications Mast Lings Farm York Road Bishop Burton East Riding Of Yorkshire

    Installation of a replacement 30m lattice mast accommodating 3no. replacement antenna, ancillary radio equipment, 2no. 0.3m and 1no. 0.6m transmission dishes, new concrete base, extended fenced compound and ancillary development thereto

    16 Jul 2026 Telecoms
  • 22/03466/TELCOM Granted

    Telecommunications Mast Pocklington Fire Station Station Road Pocklington East Riding Of Yorkshire

    Installation of 3 antennas on offset brackets off the existing antenna poles on the Fire Tower and installation of 2 cabinets in the existing compound at ground level with ancillary development

    24 Oct 2022 Telecoms