Skip to content
PlanIndex Get alerts
Menu

Planning application

Telecommunications Mast Pocklington Fire Station Station Road Pocklington East Riding Of Yorkshire

Granted East Riding of Yorkshire 22/03466/TELCOM Telecommunications - Prior Notifications

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of 3 antennas on offset brackets off the existing antenna poles on the Fire Tower and installation of 2 cabinets in the existing compound at ground level with ancillary development

As published by the council, reference 22/03466/TELCOM

Application record

Reference
22/03466/TELCOM
Type
Telecommunications - Prior Notifications
Status
Prior Approval Not Required
Decision
Prior Approval Not Required
Received
24 Oct 2022
Validated
24 Oct 2022
Decided
15 Dec 2022
Ward
Pocklington Provincial
Parish
Pocklington Town Council
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 24 Oct 2022

    Received by East Riding of Yorkshire

  2. 15 Dec 2022

    Decision issued: Prior Approval Not Required

  3. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

40 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

Nearby applications

Within 500 metres

In East Riding of Yorkshire

  • 26/01828/TELCOM Granted

    Telecommunications Mast Lings Farm York Road Bishop Burton East Riding Of Yorkshire

    Installation of a replacement 30m lattice mast accommodating 3no. replacement antenna, ancillary radio equipment, 2no. 0.3m and 1no. 0.6m transmission dishes, new concrete base, extended fenced compound and ancillary development thereto

    16 Jul 2026 Telecoms
  • 24/03160/TELCOM Granted

    Telecommunications Mast Hotham Road North Cave East Riding Of Yorkshire

    Installation of a replacement 25m Monopole mast onto new concrete base to accommodate 6 no. Antenna and ancillary radio equipment, 1 no. GPS Module onto proposed gantry pole within compound, 1 no. replacement Equipment Cabinet within compound and ancillary development

    24 Oct 2024 Telecoms