Skip to content
PlanIndex Get alerts
Menu

Planning application

Hibernian Training Centre 1A E Mains Ormiston Tranent EH35 5NG

Withdrawn East Lothian 26/00003/PAN Proposal of Application Notice

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Construction of dome/building over artificial football pitch

As published by the council, reference 26/00003/PAN

Application record

Reference
26/00003/PAN
Type
Proposal of Application Notice
Status
Withdrawn
Decision
Application Withdrawn
Received
11 Mar 2026
Validated
11 Mar 2026
Decided
19 Mar 2026
Ward
Haddington And Lammermuir
Parish
Ormiston Community Council
Postcode
EH35 5NG

Timeline

Dates from the published record

  1. 11 Mar 2026

    Received by East Lothian

  2. 19 Mar 2026

    Decision issued: Application Withdrawn

  3. 29 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What withdrawal means

The applicant withdrew this application before East Lothian decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on East Lothian's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Hibernian Training Centre Ormiston Tranent East Lothian EH35 5NG

    26/00004/PAN Submitted 19 Mar 2026 0m away

    Change of use of agricultural land to become part of the existing Hibernian Training Centre. Changing room, and related Club facilities, building. Building/dome covering new artificial football pitch. New outdoor football pitches. New car park and related footpath. Multi-modal transport improvements. New energy, drainage, and utilities, infrastructure. Lighting. High performance CCTV system. Ground remodelling works required for the proposals. New hard and soft landscaping, fencing, and biodiversity enhancement measures.

    Decided 5 docs
  • Hibernian Training Centre East Mains Ormiston Tranent East Lothian EH35 5NG

    25/00011/SCR Submitted 10 Nov 2025 33m away

    Proposed expansion of existing facility to provide indoor full size football pitch, first team changing and associated facilities, 7 aside external pitches, 2 full size pitches and carpark

    Decided Outline 7 docs