Planning application
Hibernian Training Centre East Mains Ormiston Tranent East Lothian EH35 5NG
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Proposed expansion of existing facility to provide indoor full size football pitch, first team changing and associated facilities, 7 aside external pitches, 2 full size pitches and carpark
As published by the council, reference 25/00011/SCR
Application record
- Reference
- 25/00011/SCR
- Type
- Screening Opinion
- Status
- Permitted
- Decision
- EIA not required
- Received
- 10 Nov 2025
- Validated
- 25 Nov 2025
- Decided
- 16 Dec 2025
- Ward
- Haddington And Lammermuir
- Parish
- Ormiston Community Council
- Postcode
- EH35 5NG
Timeline
Dates from the published record
-
10 Nov 2025
Received by East Lothian
-
25 Nov 2025
Validated
Checked as complete and ready for consideration.
-
16 Dec 2025
Decision issued: EIA not required
-
29 Jul 2026
Added to PlanIndex
Documents
7 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
After the decision
East Lothian has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Hibernian Training Centre Ormiston Tranent East Lothian EH35 5NG
Change of use of agricultural land to become part of the existing Hibernian Training Centre. Changing room, and related Club facilities, building. Building/dome covering new artificial football pitch. New outdoor football pitches. New car park and related footpath. Multi-modal transport improvements. New energy, drainage, and utilities, infrastructure. Lighting. High performance CCTV system. Ground remodelling works required for the proposals. New hard and soft landscaping, fencing, and biodiversity enhancement measures.
Decided 5 docs -
Hibernian Training Centre 1A E Mains Ormiston Tranent EH35 5NG
Construction of dome/building over artificial football pitch
Withdrawn 3 docs -
East Mains Ormiston East Lothian
Alterations, change use of agricultural buildings and land to whisky distillery (Class 5), whisky cask storage (Class 6) and associated works
Granted Full applications 25 docs -
East Mains Farm Ormiston East Lothian EH35 5NG
Siting of laboratory building for a temporary period of 3 years
Granted Full applications 6 docs -
Hibernian Training Centre Ormiston Tranent EH35 5NG
96% historically approved · decision due ~27 Nov
Change of use of agricultural land to football training centre, erection of associated building, dome, formation of football pitches and associated works
Status unknown Full applications 55 docs
Other outline applications
In East Lothian
-
26/00469/PP Withdrawn
Land East Of Drummore House Wallyford Toll Wallyford East Lothian
Planning permission in principle for the erection of a 60-bed care home, 10 associated extra care apartments (Class 8), car parking, landscaping, and associated works
-
26/00006/SCR Status unknown
Blindwells East Lothian
The forthcoming Section 42 application relates specifically to amendments to the overall development quantum and land use distribution across the approved masterplan, rather than changes to the site boundary, primary infrastructure strategy or development principles previously assessed
-
26/00005/SCR Decided
Baird Maltings Pencaitland EH34 5DQ
The proposed development includes the demolition of all existing buildings and structures within the site. This will include an asbestos survey and removal of any asbestos in an appropriate manner. Explosive demolition is likely to be used for the two 6-storey concrete framed mill buildings on the site. Depending on the precise phasing and approach taken the demolition process is expected to take between around 40 and 65 weeks. The demolition itself is a single project. It may be that planning permission is obtained for an alternative use in due course. However, the demolition is not dependent on planning permission being obtained for another use. The demolition is necessary due to the high cost of securing the site and structures on a vacant state. The proposed development of this EIA screening request does not include the erection of any other buildings or hard standing surfaces.
-
26/00196/PP Refused
Garden Ground Of 43 Dunbar Road Haddington East Lothian
Planning Permission in Principle for the erection of 1 house
-
26/00004/SCR Decided
Land To North Of A199 At Beanston Farm Haddington East Lothian
Proposed anaerobic digestion plant with perimeter bunding and associated landscaping, access and infrastructure works.