Planning application
Seton Sands Holiday Village Longniddry East Lothian EH32 0QF
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Full planning permission for the partial redevelopment of the Seton Sands Holiday Village, comprising the following elements: 1) Demolition of: 6 single storey buildings and workshops including the Haven mini market shop, facility management and maintenance buildings, sheds and storage containers; removal of 40 existing touring caravan pitches; and, 2) The proposed siting of: up to 278 static caravans for staff accommodation and holiday occupation; and repositioning 19 existing static caravans for staff accommodation; and, 3) The erection of: single storey extension and redevelopment of the central facilities hub; the layout of a new maintenance area; external works to create a new adventure village area 4) The reconfiguration and installation of: internal roads; hardstanding bases for caravans; parking areas; footpaths; utilities; drainage and flood infrastructure and mitigation works including replacement pond; and landscaping.
As published by the council, reference 25/00010/SCR
Application record
- Reference
- 25/00010/SCR
- Type
- Screening Opinion
- Received
- 6 Nov 2025
- Validated
- 6 Nov 2025
- Ward
- Preston Seton And Gosford
- Parish
- Cockenzie & Port Seton Community Council
- Postcode
- EH32 0QF
Site history
Applications at this address on the East Lothian register
This site has had 3 applications since 2025: 1 approved, 0 refused.
-
26/00424/P Granted
Seton Sands Holiday Village Longniddry East Lothian EH32 0QF
Section 42 application to vary Condition 1 of Planning Permission 22/00047/P to extend the time period for the siting of a shop/laundrette and associated works for a further period of 3 years
-
25/00010/SCO Decided
Seton Sands Holiday Village Longniddry East Lothian EH32 0QF
Scoping Request for the 1) Demolition of: 6 single storey buildings and workshops including the Haven mini market shop, facility management and maintenance buildings, sheds and storage containers; removal of 40 existing touring caravan pitches; and, 2) The proposed siting of: up to 278 static caravans for staff accommodation and holiday occupation; and repositioning 19 existing static caravans for staff accommodation; and, 3) The erection of: single storey extension and redevelopment of the central facilities hub; the layout of a new maintenance area; external works to create a new adventure village area 4) The reconfiguration and installation of: internal roads; hardstanding bases for caravans; parking areas; footpaths; utilities; drainage and flood infrastructure and mitigation works including replacement pond; and landscaping.
Timeline
Dates from the published record
-
6 Nov 2025
Received by East Lothian
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Lothian took a median of 56 days over the applications it decided in the last year.
Documents
3 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
Checking the current position
The published feed does not show a live status for this application; the register on East Lothian's own portal holds the authoritative version.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Seton Sands Holiday Village Port Seton East Lothian EH32 0QF
96% historically approved · decision due ~29 Oct
Section 42 application to vary condition 1 of planning permission 25/00769/P to extend period of occupancy from 1st February to January 7th each year
Status unknown Full applications 4 docs -
Seton Sands Holiday Village Port Seton East Lothian EH32 0QF
96% historically approved · decision due ~29 Oct
Section 42 application to vary condition 1 of planning permission 25/00770/PM to extend period of occupancy from 1st February to January 7th each year
Decided 6 docs -
Seton Sands Holiday Village Port Seton East Lothian EH32 0QF
96% historically approved · decision due ~29 Oct
Section 42 application to vary condition 1 of planning permission 25/00768/PM to extend period of occupancy from 1st February to January 7th each year
Decided 4 docs -
Seton Sands Holiday Village Port Seton East Lothian EH32 0QF
Installation of solar panels
Granted Full applications 6 docs -
Seton Sands Holiday Village Port Seton Prestonpans EH32 0QF
96% historically approved · decision due ~21 Sep
Erection of shop/laundrette and associated works
Status unknown Full applications 16 docs -
Seton Sands Holiday Village Port Seton East Lothian EH32 0QF
Erection of a jump tower/climbing wall, fencing and gate
Granted Full applications 6 docs
Other outline applications
In East Lothian
-
26/00469/PP Withdrawn
Land East Of Drummore House Wallyford Toll Wallyford East Lothian
Planning permission in principle for the erection of a 60-bed care home, 10 associated extra care apartments (Class 8), car parking, landscaping, and associated works
-
26/00006/SCR Status unknown
Blindwells East Lothian
The forthcoming Section 42 application relates specifically to amendments to the overall development quantum and land use distribution across the approved masterplan, rather than changes to the site boundary, primary infrastructure strategy or development principles previously assessed
-
26/00005/SCR Decided
Baird Maltings Pencaitland EH34 5DQ
The proposed development includes the demolition of all existing buildings and structures within the site. This will include an asbestos survey and removal of any asbestos in an appropriate manner. Explosive demolition is likely to be used for the two 6-storey concrete framed mill buildings on the site. Depending on the precise phasing and approach taken the demolition process is expected to take between around 40 and 65 weeks. The demolition itself is a single project. It may be that planning permission is obtained for an alternative use in due course. However, the demolition is not dependent on planning permission being obtained for another use. The demolition is necessary due to the high cost of securing the site and structures on a vacant state. The proposed development of this EIA screening request does not include the erection of any other buildings or hard standing surfaces.
-
26/00196/PP Refused
Garden Ground Of 43 Dunbar Road Haddington East Lothian
Planning Permission in Principle for the erection of 1 house
-
26/00004/SCR Decided
Land To North Of A199 At Beanston Farm Haddington East Lothian
Proposed anaerobic digestion plant with perimeter bunding and associated landscaping, access and infrastructure works.