Planning application

25/00010/SCR

Seton Sands Holiday Village Longniddry East Lothian EH32 0QF

Status unknown East Lothian Screening Opinion

Proposal

Full planning permission for the partial redevelopment of the Seton Sands Holiday Village, comprising the following elements: 1) Demolition of: 6 single storey buildings and workshops including the Haven mini market shop, facility management and maintenance buildings, sheds and storage containers; removal of 40 existing touring caravan pitches; and, 2) The proposed siting of: up to 278 static caravans for staff accommodation and holiday occupation; and repositioning 19 existing static caravans for staff accommodation; and, 3) The erection of: single storey extension and redevelopment of the central facilities hub; the layout of a new maintenance area; external works to create a new adventure village area 4) The reconfiguration and installation of: internal roads; hardstanding bases for caravans; parking areas; footpaths; utilities; drainage and flood infrastructure and mitigation works including replacement pond; and landscaping.

As published by the council, reference 25/00010/SCR

Timeline

Dates from the published record

  1. 6 Nov 2025

    Received by East Lothian

  2. 29 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

Checking the current position

The process from here

The published feed does not show a live status for this application, which usually means the council register holds more recent detail than the copy PlanIndex receives.

The council portal linked on this page carries the authoritative version, including the documents, any consultation deadline and the decision once made. PlanIndex refreshes its copy of the register on a daily cycle.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 26/00424/P Granted

    Seton Sands Holiday Village Longniddry East Lothian EH32 0QF

    Section 42 application to vary Condition 1 of Planning Permission 22/00047/P to extend the time period for the siting of a shop/laundrette and associated works for a further period of 3 years

    22 Apr 2026 177m away Full applications
  • 25/00010/SCO Decided

    Seton Sands Holiday Village Longniddry East Lothian EH32 0QF

    Scoping Request for the 1) Demolition of: 6 single storey buildings and workshops including the Haven mini market shop, facility management and maintenance buildings, sheds and storage containers; removal of 40 existing touring caravan pitches; and, 2) The proposed siting of: up to 278 static caravans for staff accommodation and holiday occupation; and repositioning 19 existing static caravans for staff accommodation; and, 3) The erection of: single storey extension and redevelopment of the central facilities hub; the layout of a new maintenance area; external works to create a new adventure village area 4) The reconfiguration and installation of: internal roads; hardstanding bases for caravans; parking areas; footpaths; utilities; drainage and flood infrastructure and mitigation works including replacement pond; and landscaping.

    6 Nov 2025 263m away Outline
  • 25/01298/P Granted

    Atholl-Dene Port Seton Longniddry EH32 0PW

    Renewal of Planning Permission 22/01236/P for extension to house and formation of dormer

    14 Nov 2025 295m away Full applications

In East Lothian

  • 26/00006/SCR Status unknown

    Blindwells East Lothian

    The forthcoming Section 42 application relates specifically to amendments to the overall development quantum and land use distribution across the approved masterplan, rather than changes to the site boundary, primary infrastructure strategy or development principles previously assessed

    14 Jul 2026 Outline
  • 26/00005/SCR Status unknown

    Baird Maltings Pencaitland EH34 5DQ

    The proposed development includes the demolition of all existing buildings and structures within the site. This will include an asbestos survey and removal of any asbestos in an appropriate manner. Explosive demolition is likely to be used for the two 6-storey concrete framed mill buildings on the site. Depending on the precise phasing and approach taken the demolition process is expected to take between around 40 and 65 weeks. The demolition itself is a single project. It may be that planning permission is obtained for an alternative use in due course. However, the demolition is not dependent on planning permission being obtained for another use. The demolition is necessary due to the high cost of securing the site and structures on a vacant state. The proposed development of this EIA screening request does not include the erection of any other buildings or hard standing surfaces.

    19 Jun 2026 Outline
  • 26/00196/PP Refused

    Garden Ground Of 43 Dunbar Road Haddington East Lothian

    Planning Permission in Principle for the erection of 1 house

    19 Feb 2026 Outline
  • 26/00004/SCR Decided

    Land To North Of A199 At Beanston Farm Haddington East Lothian

    Proposed anaerobic digestion plant with perimeter bunding and associated landscaping, access and infrastructure works.

    18 May 2026 Outline
  • 26/00570/SCO Status unknown

    Howden Farm Gifford EH41 1JS

    60,000 capacity free range hen shed to be located in Howden Farm. Access is from the B6355

    2 Jun 2026 Outline