Planning application
25/00010/SCO
Seton Sands Holiday Village Longniddry East Lothian EH32 0QF
Proposal
Scoping Request for the 1) Demolition of: 6 single storey buildings and workshops including the Haven mini market shop, facility management and maintenance buildings, sheds and storage containers; removal of 40 existing touring caravan pitches; and, 2) The proposed siting of: up to 278 static caravans for staff accommodation and holiday occupation; and repositioning 19 existing static caravans for staff accommodation; and, 3) The erection of: single storey extension and redevelopment of the central facilities hub; the layout of a new maintenance area; external works to create a new adventure village area 4) The reconfiguration and installation of: internal roads; hardstanding bases for caravans; parking areas; footpaths; utilities; drainage and flood infrastructure and mitigation works including replacement pond; and landscaping.
As published by the council, reference 25/00010/SCO
Timeline
Dates from the published record
-
6 Nov 2025
Received by East Lothian
-
18 Dec 2025
Decision issued: EIA required
-
29 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
25/00010/SCR Status unknown
Seton Sands Holiday Village Longniddry East Lothian EH32 0QF
Full planning permission for the partial redevelopment of the Seton Sands Holiday Village, comprising the following elements: 1) Demolition of: 6 single storey buildings and workshops including the Haven mini market shop, facility management and maintenance buildings, sheds and storage containers; removal of 40 existing touring caravan pitches; and, 2) The proposed siting of: up to 278 static caravans for staff accommodation and holiday occupation; and repositioning 19 existing static caravans for staff accommodation; and, 3) The erection of: single storey extension and redevelopment of the central facilities hub; the layout of a new maintenance area; external works to create a new adventure village area 4) The reconfiguration and installation of: internal roads; hardstanding bases for caravans; parking areas; footpaths; utilities; drainage and flood infrastructure and mitigation works including replacement pond; and landscaping.
-
26/00424/P Granted
Seton Sands Holiday Village Longniddry East Lothian EH32 0QF
Section 42 application to vary Condition 1 of Planning Permission 22/00047/P to extend the time period for the siting of a shop/laundrette and associated works for a further period of 3 years
-
25/01298/P Granted
Atholl-Dene Port Seton Longniddry EH32 0PW
Renewal of Planning Permission 22/01236/P for extension to house and formation of dormer
Other outline applications
In East Lothian
-
26/00006/SCR Status unknown
Blindwells East Lothian
The forthcoming Section 42 application relates specifically to amendments to the overall development quantum and land use distribution across the approved masterplan, rather than changes to the site boundary, primary infrastructure strategy or development principles previously assessed
-
26/00005/SCR Status unknown
Baird Maltings Pencaitland EH34 5DQ
The proposed development includes the demolition of all existing buildings and structures within the site. This will include an asbestos survey and removal of any asbestos in an appropriate manner. Explosive demolition is likely to be used for the two 6-storey concrete framed mill buildings on the site. Depending on the precise phasing and approach taken the demolition process is expected to take between around 40 and 65 weeks. The demolition itself is a single project. It may be that planning permission is obtained for an alternative use in due course. However, the demolition is not dependent on planning permission being obtained for another use. The demolition is necessary due to the high cost of securing the site and structures on a vacant state. The proposed development of this EIA screening request does not include the erection of any other buildings or hard standing surfaces.
-
26/00196/PP Refused
Garden Ground Of 43 Dunbar Road Haddington East Lothian
Planning Permission in Principle for the erection of 1 house
-
26/00004/SCR Decided
Land To North Of A199 At Beanston Farm Haddington East Lothian
Proposed anaerobic digestion plant with perimeter bunding and associated landscaping, access and infrastructure works.
-
26/00570/SCO Status unknown
Howden Farm Gifford EH41 1JS
60,000 capacity free range hen shed to be located in Howden Farm. Access is from the B6355