Planning application
Bank Farm Main Road Frithville Lincolnshire PE22 7DP
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Environmental Impact Assessment (E.E.C. Directive 85/337/E.E.C. as amended by Council Directive 97/11E.C.) for a screening opinion with respect to the erection of 3no. linked poultry buildings, an egg packing and storage building, attenuation pond, silos and hardstanding. Demolition of existing poultry buildings.
As published by the council, reference 00223/26/ESR
Application record
- Reference
- 00223/26/ESR
- Type
- EIA - Screening Option
- Status
- Awaiting decision
- Received
- 22 Jan 2026
- Validated
- 22 Jan 2026
- Ward
- Sibsey And Stickney Ward
- Parish
- Frithville And Westville
- Postcode
- PE22 7DP
Site history
Applications at this address on the East Lindsey register
This site has had 3 applications since 2026.
-
01411/26/FUL Awaiting decision
Bank Farm Main Road Frithville Lincolnshire PE22 7DP
Planning Permission - Erection of a dwelling with detached garage
-
00873/26/DPC Decided
Bank Farm Main Road Frithville Lincolnshire PE22 7DP
Discharge condition 10 (waste management) and Biodiversity Net Gain condition imposed on 00076/26/FUL.
Timeline
Dates from the published record
-
22 Jan 2026
Received by East Lindsey
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 19 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Lindsey took a median of 66 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Harrison Pick Ltd Agent, registered in Driffield
Active · incorporated 2024 · Driffield
299 applications on PlanIndex · across 45 councils · 93% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with East Lindsey for determination, against a statutory target of eight weeks. Over the last year East Lindsey decided outline applications in a median of 19 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Bank Farm Main Road Frithville Lincolnshire PE22 7DP
Discharge condition 10 (waste management) and Biodiversity Net Gain condition imposed on 00076/26/FUL.
Decided Conditions 15 docs -
Bank Farm Main Road Frithville Lincolnshire PE22 7DP
93% historically approved · decision due ~22 Oct
Planning Permission - Erection of a dwelling with detached garage
Awaiting decision Full applications New dwelling 7 docsDomestic -
Riverside Cottage, Main Road, Frithville, BOSTON, PE22 7DR
Planning Permission - Change of use of an existing outbuilding for light industrial use (for the manufacture and repair of fibreglass products) and provision of parking.
Granted Full applications 1 doc -
Swandyke Cottage, Main Road, Frithville, PE22 7DN
Listed Building Consent - Alterations to provide the installation of a boiler flue.
Granted Heritage and listed buildings 2 docs
Other outline applications
In East Lindsey
-
01521/26/ESR Awaiting decision
Hasthorpe Grange Farm Habertoft Lane Habertoft Lincolnshire LN13 9NU
Environmental Impact Assessment (E.E.C. Directive 85/337/E.E.C. as amended by Council Directive 97/11E.C.) for a screening opinion with respect to the erection of a free range egg production unit with associated infrastructure and landscaping.
-
01119/26/ESR Decided
Green Lane Farm Main Road Saltfleetby Lincolnshire LN11 7SS
Environmental Impact Assessment (E.E.C. Directive 85/337/E.E.C. as amended by Council Directive 97/11E.C.) for a screening opinion with respect to the erection of a general-purpose building, padel court, stables and helipad and change of use of land to equestrian use.
-
02594/25/OUT Granted
Land West Of Tothby Close Alford Lincolnshire
Outline planning application (with all matters reserved except for means of access) for the erection of up to 200 dwellings, with public open space, landscaping, sustainable drainage system (SuDs) and associated infrastructure.
-
03523/25/OUT Refused
Summerlands Corner Park Roman Bank Ingoldmells Lincolnshire PE25 1HZ
Outline erection of a shop on the site of an existing shop which is to be demolished.
-
01483/26/ESR Awaiting decision
Pinetrees Caravan Park Croft Bank Croft Lincolnshire PE24 4RE
Environmental Impact Assessment (E.E.C. Directive 85/337/E.E.C. as amended by Council Directive 97/11E.C.) for a screening opinion with respect to change of use of land to form an extension to the existing caravan park and to include the erection of a wc block, installation of lighting, construction of internal access roads and landscaping.