Skip to content
PlanIndex Get alerts
Menu

Planning application

Former Bishops Stortford High School London Road Bishops Stortford Hertfordshire CM23 3LU

Awaiting decision East Hertfordshire X/25/0470/CND Discharge Condition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of condition 27 (SUDS Management and Maintenance Plan) attached to 3/20/0151/OUT.

As published by the council, reference X/25/0470/CND

Application record

Reference
X/25/0470/CND
Type
Discharge Condition
Status
Awaiting decision
Received
20 Aug 2025
Validated
20 Aug 2025
Ward
Bishop's Stortford South
Parish
Bishops Stortford Town Council
Postcode
CM23 3LU

Site history

Applications at this address on the East Hertfordshire register

This site has had 20 applications since 2025.

  • X/26/0341/CND Awaiting decision

    Former Bishops Stortford High School London Road Bishops Stortford Hertfordshire CM23 3LU

    Discharge of Condition 23 (Travel Plan) attached to 3/20/0151/OUT

    Submitted 5 Aug 2026
  • X/26/0265/CND Awaiting decision

    Former Bishops Stortford High School London Road Bishops Stortford Hertfordshire CM23 3LU

    Application for approval of details reserved by condition 33 (management and maintenance of open space) pursuant to planning approval 3/20/0151/OUT

    Submitted 10 Jun 2026
  • X/26/0236/CND Awaiting decision

    Former Bishops Stortford High School London Road Bishops Stortford Hertfordshire CM23 3LU

    Discharge of Condition 7 (Photovoltaics Specification and Siting) attached to 3/25/0913/REM

    Submitted 21 May 2026
  • X/26/0233/CND Decided

    Former Bishops Stortford High School London Road Bishops Stortford Hertfordshire CM23 3LU

    Discharge of Condition 14 (Local Area for Play (LAP) and Locally Equipped Area for Play (LEAP)) attached to 3/25/0913/REM

    Submitted 21 May 2026
  • X/26/0228/CND Awaiting decision

    Former Bishops Stortford High School London Road Bishops Stortford Hertfordshire CM23 3LU

    Discharge of Condition 12 (Shared Surface Roads) attached to 3/25/0913/REM

    Submitted 21 May 2026
  • X/26/0234/CND Decided

    Former Bishops Stortford High School London Road Bishops Stortford Hertfordshire CM23 3LU

    Discharge of Condition 5 (Secure Bicycle Storage) attached to 3/25/0913/REM

    Submitted 21 May 2026
  • X/26/0235/CND Awaiting decision

    Former Bishops Stortford High School London Road Bishops Stortford Hertfordshire CM23 3LU

    Discharge of Condition 6 (Sustainability Statement) attached to 3/25/0913/REM

    Submitted 21 May 2026
  • X/26/0230/CND Decided

    Former Bishops Stortford High School London Road Bishops Stortford Hertfordshire CM23 3LU

    Discharge of Condition 9 (Nodal Square Details) attached to 3/25/0913/REM

    Submitted 21 May 2026
  • X/26/0229/CND Decided

    Former Bishops Stortford High School London Road Bishops Stortford Hertfordshire CM23 3LU

    Discharge of Condition 35 (Accessible Natural Greenspace) attached to 3/20/0151/OUT

    Submitted 21 May 2026
  • X/26/0231/CND Awaiting decision

    Former Bishops Stortford High School London Road Bishops Stortford Hertfordshire CM23 3LU

    Discharge of Condition 10 (Climbing Plant Strategy) attached to 3/25/0913/REM

    Submitted 21 May 2026

Timeline

Dates from the published record

  1. 20 Aug 2025

    Received by East Hertfordshire

  2. 23 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 15 October 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Hertfordshire took a median of 81 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Hertfordshire for determination, against a statutory target of eight weeks. Over the last year East Hertfordshire decided condition discharge and variation applications in a median of 86 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

In East Hertfordshire

  • X/26/0079/CND Decided

    Sparrows Nest Thorley Street Thorley Bishops Stortford Hertfordshire CM23 4AL

    Discharge of conditions 3 (HMMP), 4 (Bat and Bird box), 5 (Landscape) and 6 (Surfacing) attached to 3/24/0973/FUL

    24 Feb 2026 Conditions
  • X/26/0342/CND Awaiting decision

    Red Cottage Howe Green Hertfordshire SG13 8LH

    Discharge of Condition 12 (Excavation Plan) attached to 3/25/0089/FUL (allowed on appeal APP/J1915/W/25/3375115)

    6 Aug 2026 Conditions
  • X/26/0336/CND Awaiting decision

    Drill Hall 17 Amwell End Ware Hertfordshire SG12 9HP

    Discharge of Condition 3 (Door Details) attached to 3/23/2257/LBC

    31 Jul 2026 Conditions
  • X/26/0198/CND Decided

    Bishops Folly Winding Hill Much Hadham Hertfordshire SG10 6HW

    Discharge conditions 4 (Recording survey), 5 (Method statement), 7 (Staircase design), 8 (New windows), 9 (New doors) and 10 (New plasterwork) attached to 3/25/1290/LBC

    28 Apr 2026 Conditions
  • X/26/0104/CND Decided

    Jackson Square Shopping Centre Bishops Stortford Hertfordshire CM23 3XH

    Discharge of Conditions 6 (Hard Surfacing) and 7 (Landscape Design Proposal) attached to 3/21/0096/FUL

    10 Mar 2026 Conditions