Planning application
Eastern Stort Crossing Eastwick Road Eastwick Hertfordshire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of Condition 11 (Lighting Strategy), attached to 3/19/1051/FUL.
As published by the council, reference X/25/0356/CND
Application record
- Reference
- X/25/0356/CND
- Type
- Discharge Condition
- Status
- Awaiting decision
- Received
- 10 Jun 2025
- Validated
- 10 Jun 2025
- Ward
- Hunsdon
- Parish
- Eastwick Parish Council
Site history
Applications at this address on the East Hertfordshire register
This site has had 5 applications since 2025.
-
3/26/0798/NMA Decided
Eastern Stort Crossing Eastwick Road Eastwick Hertfordshire
Non-material amendment to 3/19/1051/FUL, to add a new condition to carve out Utility Corridor Enabling Works as detailed on Drawing NATTA-C6465-D-738-EUC Rev A from conditions 6, 8, 11, 12, 13, 14, 15, 17, 19, 21, 23, 25, 26, 28, 31, 33, 37 and 42 to allow ducting works to commence
-
X/26/0061/CND Decided
Eastern Stort Crossing Eastwick Road Eastwick Hertfordshire
Part Discharge of Conditions 31 (Tree and Hedge Protection Measures:), attached to 3/19/1051/FUL.
-
X/25/0591/CND Decided
Eastern Stort Crossing Eastwick Road Eastwick Hertfordshire
Discharge of condition 25 (Piling/Deep Foundations Method Statement) attached to 3/19/1051/FUL
-
X/25/0355/CND Awaiting decision
Eastern Stort Crossing Eastwick Road Eastwick Hertfordshire
Discharge of Conditions 8 (Levels), attached to 3/19/1051/FUL.
Timeline
Dates from the published record
-
10 Jun 2025
Received by East Hertfordshire
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Hertfordshire took a median of 81 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with East Hertfordshire for determination, against a statutory target of eight weeks. Over the last year East Hertfordshire decided condition discharge and variation applications in a median of 86 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In East Hertfordshire
-
X/26/0079/CND Decided
Sparrows Nest Thorley Street Thorley Bishops Stortford Hertfordshire CM23 4AL
Discharge of conditions 3 (HMMP), 4 (Bat and Bird box), 5 (Landscape) and 6 (Surfacing) attached to 3/24/0973/FUL
-
X/26/0342/CND Awaiting decision
Red Cottage Howe Green Hertfordshire SG13 8LH
Discharge of Condition 12 (Excavation Plan) attached to 3/25/0089/FUL (allowed on appeal APP/J1915/W/25/3375115)
-
X/26/0336/CND Awaiting decision
Drill Hall 17 Amwell End Ware Hertfordshire SG12 9HP
Discharge of Condition 3 (Door Details) attached to 3/23/2257/LBC
-
X/26/0198/CND Decided
Bishops Folly Winding Hill Much Hadham Hertfordshire SG10 6HW
Discharge conditions 4 (Recording survey), 5 (Method statement), 7 (Staircase design), 8 (New windows), 9 (New doors) and 10 (New plasterwork) attached to 3/25/1290/LBC
-
X/26/0104/CND Decided
Jackson Square Shopping Centre Bishops Stortford Hertfordshire CM23 3XH
Discharge of Conditions 6 (Hard Surfacing) and 7 (Landscape Design Proposal) attached to 3/21/0096/FUL