Planning application
Parcel G1 (A), (B) And (D) Land At Bishops Stortford South (BISH5) Off Whittington Way Bishops Stortford Hertfordshire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of condition 51 (Surface water/drainage strategy) attached to 3/21/1749/VAR
As published by the council, reference X/23/0079/CND
Application record
- Reference
- X/23/0079/CND
- Type
- Discharge Condition
- Status
- Awaiting decision
- Received
- 28 Feb 2023
- Validated
- 2 Mar 2023
- Ward
- Bishops Stortford - South
- Parish
- Bishops Stortford Town Council
Site history
Applications at this address on the East Hertfordshire register
This site has had 4 applications since 2022: 1 approved, 0 refused.
-
X/23/0283/CND Decided
Parcel G1 (A), (B) And (D) Land At Bishops Stortford South (BISH5) Off Whittington Way Bishops Stortford Hertfordshire
Discharge condition 25 (air quality) attached to 3/18/2253/OUT.
-
X/23/0155/CND Decided
Parcel G1 (A), (B), And (D) Land At Bishops Stortford South (BISH5) Off Whittington Way Bishops Stortford Hertfordshire
Discharge of condition 42 (details of highways for phase for planning approval 3/21/1749/VAR
-
3/22/1704/REM Granted
Parcel G1 (A), (B) And (D) Land At Bishops Stortford South (BISH5) Off Whittington Way Bishops Stortford Hertfordshire
Approval of reserved matters (layout, scale, appearance and landscaping) for Parcel G1 (a), (b) and (d) of planning permission 3/21/1749/VAR comprising 124 residential dwellings (Use Class C3) and associated works.
Timeline
Dates from the published record
-
28 Feb 2023
Received by East Hertfordshire
-
2 Mar 2023
Validated
Checked as complete and ready for consideration.
-
19 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 April 2023, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Hertfordshire took a median of 81 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
32 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with East Hertfordshire for determination, against a statutory target of eight weeks. Over the last year East Hertfordshire decided condition discharge and variation applications in a median of 86 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In East Hertfordshire
-
X/26/0079/CND Decided
Sparrows Nest Thorley Street Thorley Bishops Stortford Hertfordshire CM23 4AL
Discharge of conditions 3 (HMMP), 4 (Bat and Bird box), 5 (Landscape) and 6 (Surfacing) attached to 3/24/0973/FUL
-
X/26/0342/CND Awaiting decision
Red Cottage Howe Green Hertfordshire SG13 8LH
Discharge of Condition 12 (Excavation Plan) attached to 3/25/0089/FUL (allowed on appeal APP/J1915/W/25/3375115)
-
X/26/0336/CND Awaiting decision
Drill Hall 17 Amwell End Ware Hertfordshire SG12 9HP
Discharge of Condition 3 (Door Details) attached to 3/23/2257/LBC
-
X/26/0198/CND Decided
Bishops Folly Winding Hill Much Hadham Hertfordshire SG10 6HW
Discharge conditions 4 (Recording survey), 5 (Method statement), 7 (Staircase design), 8 (New windows), 9 (New doors) and 10 (New plasterwork) attached to 3/25/1290/LBC
-
X/26/0104/CND Decided
Jackson Square Shopping Centre Bishops Stortford Hertfordshire CM23 3XH
Discharge of Conditions 6 (Hard Surfacing) and 7 (Landscape Design Proposal) attached to 3/21/0096/FUL