Planning application
3/25/1602/FUL
Land At Gosmore Paddock Hebing End Benington Hertfordshire SG2 7DD
Proposal
Erection of 5 x dwellings with associated access, landscaping, drainage and on-site parking, following demolition of existing buildings
As published by the council, reference 3/25/1602/FUL
Timeline
Dates from the published record
-
9 Oct 2025
Received by East Hertfordshire
-
20 Nov 2025
Validated
Checked as complete and ready for consideration.
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with East Hertfordshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
3/24/1765/ARPN Granted
Moles Farm Hebing End Benington Hertfordshire SG2 7DD
Change of use and conversion of 3 agricultural buildings to 3 dwellings.
-
3/26/0675/HH Granted
Moles Farm Hebing End Benington Hertfordshire SG2 7DD
Single storey rear extension (orangery)
-
3/26/0896/PIP Awaiting decision
Cobblestones 12 Hebing End Benington Hertfordshire SG2 7DD
Permission in principle for erection of 5 x dwellinghouses together with parking, landscaping and access
-
3/24/1758/HH Granted
18 Hebing End Benington Hertfordshire SG2 7DD
Erection of single storey rear extension with a Sedum green roof incorporating a flat roof roof-light window. Erection of a first floor side extension incorporating a roof-light window to the front elevation and a front roof canopy supported by oak post. Alteration to first floor windows and new first floor rear facing Juliet balcony.
-
3/26/0473/HH Granted
The Stables 40 Hebing End Benington Hertfordshire SG2 7DD
Front and rear extensions and conversion of garage to habitable room
-
3/07/1613/FP Withdrawn
20, Hebing End, Benington, Herts, SG2 7DD
Two storey side & single storey rear extension to create residential annexe. Pitched roof to porch.
Other full applications applications
In East Hertfordshire
-
3/26/0679/FUL Granted
Gu Indulgent Foods Dunmow Road Bishops Stortford Hertfordshire CM23 5PA
Creation of water treatment facility and concrete bund within existing industrial site
-
3/26/0639/FUL Granted
Riverside Wharf Riverside Bishops Stortford Hertfordshire CM23 3GN
Facade remediation works including replacement of existing render system, of existing timber cladding, of existing timber balcony decking, of existing infill panel boards and replacement of existing soffit within the courtyard
-
3/26/0734/FUL Withdrawn
Snow End House Anstey Hertfordshire SG9 0DJ
Installation of an array of 24 solar panels including batteries for storage to be sited behind the panels
-
3/26/0691/FUL Refused
The Brooms 69 Lower Road Great Amwell Hertfordshire SG12 9SZ
Erection of 2no. self-build and custom eco dwellings with associated landscape, ASHP and solar panels
-
3/25/2026/FUL Refused
Westmill Farmhouse Westmill Road Westmill Ware Hertfordshire SG12 0ES
Erection of two enclosed padel courts over partial golf course, including installation of glass and wire mesh enclosures, associated hardsurfacing, eight low-level LED floodlights and compensatory grassland