Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Bishops Stortford North, Bishops Stortford Hertfordshire

Granted East Hertfordshire 3/22/1929/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection electricity sub station to serve the eastern neighborhood secondary school

As published by the council, reference 3/22/1929/FUL

Application record

Reference
3/22/1929/FUL
Type
Full Application
Status
Decided
Decision
Granted As published: Grant Plan Permission
Received
12 Sep 2022
Validated
29 Sep 2022
Decided
24 Feb 2023
Ward
Bishops Stortford - Silverleys
Parish
Bishops Stortford Town Council
Decision by
Delegated Decision

Site history

Applications at this address on the East Hertfordshire register

This site has had 5 applications since 2020: 3 approved, 0 refused.

  • 3/22/2355/NMA Granted

    Land At Bishops Stortford North, Bishops Stortford Hertfordshire

    A non-material amendment to add the route of the informal footpath to the landscape drawings of the acoustic bund corridor approved under application ref. 3/13/0804/OP (Erection of up to 2,200 dwellings inclusive of affordable housing; green infrastructure, amenity and formal and informal recreation space; landscaping; development of 2 mixed use local centres on 4.1 hectares of land providing up to 21,000 sq.m. (gross) commercial floorspace (Use Class B1 a, b and c) inclusive of (if required) a maximum of 3,000 sq.m. (gross) for healthcare facilities (Use Class D1), together with retail floorspace (Use Classes A1, A2, A3, A4 & A5) up to a maximum of 1,200 sq.m. (gross), residential development (use Class C3), and the potential for other community/cultural/leisure (Use Class D1 & D2) if required (floorspace to be agreed); the potential for an additional 0.5 hectares of land for up to 4,000 sq.m. (gross) commercial floorspace (Use Class B1 a, b and c) if required or for residential purposes (Use Class C3) if not; a primary school and associated facilities on 1.25 hectares of land; a further primary school on 2 hectares of land with the potential to extend by 1.08 hectares if required or for the expansion land to be used for residential purposes if not; 4 new junctions (A120, Hadham Road, Rye Street and Farnham Road); estate roads and public transport route; footpaths/cycleways; site profiling/earthworks; a noise bund with barrier; a sustainable drainage system; utilities services including foul water pumping stations; 2 residential garden extensions; and the demolition of 221 Rye Street and 164 & 166 Hadham Road. (All matters reserved with the exception of full details of the appearance, landscaping, layout and scale of the residential element of Phase 1 and Access for Phases 1 & 2)

    Decided 1 Jun 2023 Amendments
  • X/22/0415/CND Granted

    Land At Bishops Stortford North, Bishops Stortford Hertfordshire

    Discharge of condition 14 (Play areas) for planning approval 3/13/0804/OP

    Decided 8 Mar 2023 Conditions
  • 3/21/1868/FUL Withdrawn

    Land At Bishops Stortford North Bishops Stortford Hertfordshire

    Fourth arm on proposed Stortford Fields roundabout on A120, with revised emergency/maintenance access to school playing pitches.

    Decided 2 Jun 2023 Full applications
  • X/20/0321/CND Split decision

    Land At Bishops Stortford North Bishops Stortford Hertfordshire

    Discharge conditions 6a-d (Western Neighbourhood - details), 20 (implementation of landscaping), 22 (boundary treatment), 29 (water conservation), 30 (reduction in energy use) and 42 (street lighting) attached to 3/18/1898/VAR - Parcels B1, B2, B10, B17, B20, B26, B27 and B28

    Decided 28 May 2021 Conditions

Timeline

Dates from the published record

  1. 12 Sep 2022

    Received by East Hertfordshire

  2. 29 Sep 2022

    Validated

    Checked as complete and ready for consideration.

  3. 24 Feb 2023

    Decision issued: Grant Plan Permission

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

East Hertfordshire granted permission on 24 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Avanti Grange Secondary School Newland Avenue Bishops Stortford Hertfordshire CM23 2BD

    3/26/0092/FUL Submitted 26 Jan 2026 100 yards away

    78% historically approved · decision due ~27 May

    Construction of a single storey sixth form teaching block, hard and soft landscaping and associated works

    Decided Full applications
    Small domestic
  • Parcel P, Q, W - Eastern Neighbourhood Land At Bishops Stortford North Bishops Stortford Hertfordshire

    3/23/2317/REM Submitted 4 Dec 2023 250 yards away

    Reserved Matters (relating to scale, appearance, layout and landscaping) for 114 dwellings and associated ancillary works pursuant to planning permission ref: 3/13/0804/OP- Erection of up to 2,200 dwellings inclusive of affordable housing; green infrastructure, amenity and formal and informal recreation space; landscaping; development of 2 mixed use local centres on 4.1 hectares of land providing up to 21,000 sq.m. (gross) commercial floorspace (Use Class B1 a, b and c) inclusive of (if required) a maximum of 3,000 sq.m. (gross) for healthcare facilities (Use Class D1), together with retail floorspace (Use Classes A1, A2, A3, A4 and A5) up to a maximum of 1,200 sq.m. (gross), residential development (use Class C3) and the potential for other community/cultural/leisure (Use Class D1 and D2) if required (floorspace to be agreed); the potential for an additional 0.5 hectares of land for up to 4,000 sq.m. (gross) commercial floorspace (Use Class B1 a, b and c) if required or for residential purposes (Use Class C3) if not; a primary school and associated facilities on 1.25 hectares of land; a further primary school on 2 hectares of land with the potential to extend by 1.08 hectares if required or for the expansion land to be used for residential purposes if not; 4 new junctions (A120, Hadham Road, Rye Street and Farnham Road); estate roads and public transport route; footpaths/cycleways; site profiling/earthworks; a noise bund with barrier; a sustainable drainage system; utilities services, including foul water pumping stations; 2 residential garden extensions and the demolition of 221 Rye Street and 164 and 166 Hadham Road. (All matters reserved with the exception of full details of the appearance, landscaping, layout and scale of the residential element of Phase 1 and Access for Phases 1 and 2)

    Granted Reserved matters New dwelling Extension +1 89 docs
    Major scheme
  • (Parcel L/M) Bishops Stortford North Bishops Stortford Hertfordshire

    3/21/1599/REM Submitted 16 Jun 2021 250 yards away

    Reserved Matters application for 78 units together with associated access, parking and landscaping following grant of Outline consent (3/13/0804/OP)

    Granted Reserved matters 140 docs
    Major scheme
  • Eastern Neighbourhood Land At Bishop's Stortford North Bishops Stortford Hertfordshire CM23 2JP

    3/22/0997/FUL Submitted 11 May 2022 350 yards away

    Five electricity sub stations to serve the eastern neighborhood

    Granted Full applications 19 docs
  • Parcels R And T1 Land At Bishop's Stortford North Bishops Stortford Hertfordshire

    3/24/1142/REM Submitted 18 Jun 2024 400 yards away

    Reserved matters application relating to the Layout, Scale, Appearance and Landscaping for approval of 161 dwellings with associated infrastructure within parcels R and T1 - in relation to a variation of outline planning permission 3/22/0214/VAR (Originally 3/13/0804/OP).

    Granted Reserved matters 223 docs
    Major scheme
  • Land At Bishops Stortford North, Bishops Stortford Hertfordshire

    3/22/2355/NMA Submitted 8 Nov 2022 450 yards away

    A non-material amendment to add the route of the informal footpath to the landscape drawings of the acoustic bund corridor approved under application ref. 3/13/0804/OP (Erection of up to 2,200 dwellings inclusive of affordable housing; green infrastructure, amenity and formal and informal recreation space; landscaping; development of 2 mixed use local centres on 4.1 hectares of land providing up to 21,000 sq.m. (gross) commercial floorspace (Use Class B1 a, b and c) inclusive of (if required) a maximum of 3,000 sq.m. (gross) for healthcare facilities (Use Class D1), together with retail floorspace (Use Classes A1, A2, A3, A4 & A5) up to a maximum of 1,200 sq.m. (gross), residential development (use Class C3), and the potential for other community/cultural/leisure (Use Class D1 & D2) if required (floorspace to be agreed); the potential for an additional 0.5 hectares of land for up to 4,000 sq.m. (gross) commercial floorspace (Use Class B1 a, b and c) if required or for residential purposes (Use Class C3) if not; a primary school and associated facilities on 1.25 hectares of land; a further primary school on 2 hectares of land with the potential to extend by 1.08 hectares if required or for the expansion land to be used for residential purposes if not; 4 new junctions (A120, Hadham Road, Rye Street and Farnham Road); estate roads and public transport route; footpaths/cycleways; site profiling/earthworks; a noise bund with barrier; a sustainable drainage system; utilities services including foul water pumping stations; 2 residential garden extensions; and the demolition of 221 Rye Street and 164 & 166 Hadham Road. (All matters reserved with the exception of full details of the appearance, landscaping, layout and scale of the residential element of Phase 1 and Access for Phases 1 & 2)

    Granted Amendments New dwelling Extension +1 10 docs
    Major scheme

In East Hertfordshire

  • 3/26/1039/FUL Withdrawn

    Mayflower Place Hertingfordbury Road Hertford Hertfordshire SG14 2LG

    Erection of rear orangery garden room

    Received 24 Jul, published by the council 20 Aug 2026 Full applications
  • 3/26/0860/FUL Withdrawn

    Aston Village Hall New Park Lane Aston Hertfordshire SG2 7ED

    Single storey side extension with alterations

    Received 16 Jun, published by the council 8 Aug 2026 Full applications
  • 3/26/1414/FUL Awaiting decision

    4 Reynard Copse Bishops Stortford Hertfordshire CM23 2BB

    Demolition of dwelling and construction of a replacement dwelling with solar roof panels

    Received 5 Oct, published by the council 21 Oct 2026 Full applications
  • 3/26/1411/FUL Awaiting decision

    47 London Road Hertford Heath Hertfordshire SG13 7RJ

    Change of use and conversion of existing HMO dwelling to two residential dwellings with internal and external alterations including removal of the rear outbuilding,/store, conversion of the garage into habitable space and roof alterations

    Received 4 Oct, published by the council 16 Oct 2026 Full applications
  • 3/26/1419/FUL Awaiting decision

    53 And 55 Trinity Road Hertford Heath Hertfordshire SG13 7QR

    Raising of roof and construction of first floor accommodation for both properties

    Received 2 Oct, published by the council 15 Oct 2026 Full applications