Planning application
Woodbury House Greenway Woodbury Devon EX5 1LS
Works: Extension Roofing Demolition Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed demolition of existing single storey side extension and construction of new single storey side extension, reroof (with solar PV slates on S.E. rear roof), revised window on N.E. elevation, internal alterations including part removal of bathroom floor, and demolition of garage with construction of replacement garage/carport
As published by the council, reference 26/1981/FUL
Application record
- Reference
- 26/1981/FUL
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 7 Oct 2026
- Validated
- 7 Oct 2026
- Ward
- Woodbury And Lympstone
- Parish
- Woodbury
- Postcode
- EX5 1LS
Site history
Applications at this address on the East Devon register
This site has had 2 applications since 2026.
-
26/1982/LBC Awaiting decision
Woodbury House Greenway Woodbury Devon EX5 1LS
Proposed demolition of existing single storey side extension and construction of new single storey side extension, reroof (with solar PV slates on S.E. rear roof), revised window on N.E. elevation, internal alterations including part removal of bathroom floor, and demolition of garage with construction of replacement garage/carport.
Timeline
Dates from the published record
-
7 Oct 2026
Received by East Devon
-
16 Nov 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Devon took a median of 43 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
ArchitEXE Ltd Agent, registered in Exmouth
Active · incorporated 2012 · Exmouth
59 applications on PlanIndex · across 3 councils · 88% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
7 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What happens while it is decided
This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided full applications in a median of 50 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Woodbury House Greenway Woodbury Devon EX5 1LS
95% historically approved · decision due ~2 Dec
Proposed demolition of existing single storey side extension and construction of new single storey side extension, reroof (with solar PV slates on S.E. rear roof), revised window on N.E. elevation, internal alterations including part removal of bathroom floor, and demolition of garage with construction of replacement garage/carport.
Awaiting decision Heritage and listed buildings Extension Roofing +2 7 docsSmall domestic -
April Cottage 1 The Green Woodbury EX5 1LT
Lime Tree : Reduce height of tree by 5 metres and cut back sides to maintain current shape; removal of lowest oblique right limb
Granted Trees 6 docs -
Claremont Cottage Mirey Lane Woodbury EX5 1DX
Demolish rear garden brick wall and replace with wooden panel fencing
Refused Full applications Demolition 15 docs -
Woodbury War Memorial Greenway Woodbury Devon EX5 1LP
T64, Lime: reduce where overhanging play equipment to achieve 0.5m of horizontal clearance, Maximum Diameter of Cuts (MDC) 50mm. T65, Oak: reduce lowest branch back to first live union 2m distal from stem, MDC 100mm. Reduce any other branches overhanging play equipment to achieve 0.5m of horizontal clearance, MDC 50mm. Reduce lowest southern canopy only, immediately above garden sheds, by 1m, MDC 25mm. Pear & Rowan: crown lift over footpath as required to give a minimum clearance of 2.5m, MDC 25mm.
Decided Trees 6 docs -
-
41 Fulford Way Woodbury Devon EX5 1PD
Alterations to driveway and access.
Granted Full applications 7 docs
Other full applications
In East Devon
-
26/2184/FUL Awaiting decision
Dirks Garden Birchill Axminster EX13 7LF
Erection of a 25 square metre natural timber horticultural greenhouse structure on land with established lawful horticultural use under approval 4725 EJ/7138 dated 17th March 1967
-
26/2213/FUL Awaiting decision
Downhams Farm Woodbury Salterton
Construction of earth lined slurry lagoon with perimeter fencing
-
26/2148/FUL Awaiting decision
Bramley Barn Orchard Farm Plymtree Cullompton EX15 2LW
Enlargement of residential curtilage with associated change of use from agricultural use to residential (use class C3), construction of a first-floor balcony on north/east elevation, and construction of a garage and garden store building
-
26/2170/FUL Awaiting decision
Premier Inn Esplanade Exmouth EX8 2AZ
Replacement roof plant enclosure
-
26/2153/FUL Awaiting decision
The Old Quarry Farringdon EX5 2HZ
Proposed erection of two replacement storage buildings following the demolition of the existing buildings and structures