Planning application
A La Ronde Summer Lane Exmouth EX8 5BD
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of a new fire rated door to the lower ground floor of the main house at A la Ronde, to include the construction of a new frame. Amendment to application 24/2402/LBC approved 14 February 2025; the amendment relates to the addition of a new frame to the installation of a new fire rated door
As published by the council, reference 26/1582/LBC
Application record
- Reference
- 26/1582/LBC
- Type
- Listed Building Consent
- Status
- Awaiting decision
- Received
- 24 Aug 2026
- Validated
- 24 Aug 2026
- Ward
- Exmouth Halsdon
- Parish
- Exmouth
- Postcode
- EX8 5BD
Comment by 2 October 2026
The council is taking comments on this application until then. Have your say on East Devon's portal.
Timeline
Dates from the published record
-
24 Aug 2026
Received by East Devon
-
10 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 19 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Devon took a median of 42 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided heritage and listed building applications in a median of 58 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
A La Ronde Summer Lane Exmouth Devon EX8 5BD
T305 Oak: reduce height of tree by 2.5-3m. Reduce lateral spread of southeastern to northwestern side of crown by 2-3m. T304 Oak: reduce height of tree by 2.5-3m. Reduce lateral spread of southeastern to northwestern side of crown by 2-3m. T306 Oak: reduce height of tree by 2.5-3m. Reduce lateral spread of low limb by 2m, using reduction via thinning technique; by removing branch sections up to 4m in length making, making pruning cuts up to 75mm in diameter. Reduce lateral spread of southeastern to northwestern side of crown by 2-3m.
Granted Trees 7 docs -
A La Ronde Summer Lane Exmouth Devon EX8 5BD
Variation of Condition Number 4 (limited time period on siting of structure) on Planning Permission 15/1795/FUL (Construction of visitor hut) Proposal to allow an extension of time of the welcome hut being permitted
Granted Amendments 6 docs -
2 Swiss Close Exmouth EX8 4QF
Construction of a raised decked area to the South elevation.
Granted Full applications 10 docs -
6 April Close Exmouth EX8 4QE
Certificate of proposed lawful development for loft conversion with hip-to-gable rear roof extension, side dormer and roof lights.
Granted Lawful development Extension Loft or dormer 10 docs -
8 Woodlands Drive Exmouth EX8 4QP
Certificate of proposed lawful development for the construction of a single storey rear extension
Granted Lawful development Extension 13 docsSmall domestic -
21 Willow Avenue Exmouth EX8 4QS
Demolition of existing conservatory and construction of new ground floor rear extension and covered carport to side elevation.
Granted Full applications Extension Demolition 19 docs
Other heritage and listed building applications
In East Devon
-
26/0890/LBC Withdrawn
62 Camperdown Terrace Exmouth EX8 1EQ
Installation of a single electric vehicle charge point
-
26/0878/LBC Granted
3 Primley House Sidford Road Sidmouth EX10 9LN
Replacement of 8no windows and 2no external doors, and repair works to sections of external and boundary walls.
-
26/1825/LBC Awaiting decision
Newlands Dalwood Axminster EX13 7HQ
Raising of existing chimney to 1.8 metres above ridge to comply with Hetas Regulations
-
26/1659/LBC Awaiting decision
1 & 2 School Cottages Woodbury Salterton Exeter EX5 1PG
Remove and replace first three rows of roof tiles at the rear of the property for the full width of cottages no. 1 and no. 2 from guttering upwards; tiles are manufactured and suitable replacements will be sought and selected to ensure the continuity is kept
-
26/1719/LBC Awaiting decision
Flat 7 18 The Beacon Exmouth EX8 2AF
Replace existing balcony railings at second floor front (south west) elevation