Skip to content
PlanIndex Get alerts
Menu

Planning application

A La Ronde Summer Lane Exmouth EX8 5BD

Awaiting decision East Devon 26/1582/LBC Listed Building Consent

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of a new fire rated door to the lower ground floor of the main house at A la Ronde, to include the construction of a new frame. Amendment to application 24/2402/LBC approved 14 February 2025; the amendment relates to the addition of a new frame to the installation of a new fire rated door

As published by the council, reference 26/1582/LBC

Application record

Reference
26/1582/LBC
Type
Listed Building Consent
Status
Awaiting decision
Received
24 Aug 2026
Validated
24 Aug 2026
Ward
Exmouth Halsdon
Parish
Exmouth
Postcode
EX8 5BD

Comment by 2 October 2026

The council is taking comments on this application until then. Have your say on East Devon's portal.

Timeline

Dates from the published record

  1. 24 Aug 2026

    Received by East Devon

  2. 10 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 19 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided heritage and listed building applications in a median of 58 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • A La Ronde Summer Lane Exmouth Devon EX8 5BD

    25/1954/TRE Submitted 22 Sep 2025 192m away

    T305 Oak: reduce height of tree by 2.5-3m. Reduce lateral spread of southeastern to northwestern side of crown by 2-3m. T304 Oak: reduce height of tree by 2.5-3m. Reduce lateral spread of southeastern to northwestern side of crown by 2-3m. T306 Oak: reduce height of tree by 2.5-3m. Reduce lateral spread of low limb by 2m, using reduction via thinning technique; by removing branch sections up to 4m in length making, making pruning cuts up to 75mm in diameter. Reduce lateral spread of southeastern to northwestern side of crown by 2-3m.

    Granted Trees 7 docs
  • A La Ronde Summer Lane Exmouth Devon EX8 5BD

    25/1896/VAR Submitted 11 Sep 2025 264m away

    Variation of Condition Number 4 (limited time period on siting of structure) on Planning Permission 15/1795/FUL (Construction of visitor hut) Proposal to allow an extension of time of the welcome hut being permitted

    Granted Amendments 6 docs
  • 2 Swiss Close Exmouth EX8 4QF

    26/0819/FUL Submitted 8 May 2026 286m away

    Construction of a raised decked area to the South elevation.

    Granted Full applications 10 docs
  • 6 April Close Exmouth EX8 4QE

    26/1528/CPL Submitted 29 Jul 2026 344m away

    Certificate of proposed lawful development for loft conversion with hip-to-gable rear roof extension, side dormer and roof lights.

    Granted Lawful development Extension Loft or dormer 10 docs
  • 8 Woodlands Drive Exmouth EX8 4QP

    26/0112/CPL Submitted 20 Jan 2026 353m away

    Certificate of proposed lawful development for the construction of a single storey rear extension

    Granted Lawful development Extension 13 docs
    Small domestic
  • 21 Willow Avenue Exmouth EX8 4QS

    21/0245/FUL Submitted 1 Feb 2021 373m away

    Demolition of existing conservatory and construction of new ground floor rear extension and covered carport to side elevation.

    Granted Full applications Extension Demolition 19 docs

In East Devon

  • 26/0890/LBC Withdrawn

    62 Camperdown Terrace Exmouth EX8 1EQ

    Installation of a single electric vehicle charge point

    9 Jun 2026 Heritage and listed buildings
  • 26/0878/LBC Granted

    3 Primley House Sidford Road Sidmouth EX10 9LN

    Replacement of 8no windows and 2no external doors, and repair works to sections of external and boundary walls.

    2 Jun 2026 Heritage and listed buildings
  • 26/1825/LBC Awaiting decision

    Newlands Dalwood Axminster EX13 7HQ

    Raising of existing chimney to 1.8 metres above ridge to comply with Hetas Regulations

    8 Sep 2026 Heritage and listed buildings
  • 26/1659/LBC Awaiting decision

    1 & 2 School Cottages Woodbury Salterton Exeter EX5 1PG

    Remove and replace first three rows of roof tiles at the rear of the property for the full width of cottages no. 1 and no. 2 from guttering upwards; tiles are manufactured and suitable replacements will be sought and selected to ensure the continuity is kept

    4 Sep 2026 Heritage and listed buildings
  • 26/1719/LBC Awaiting decision

    Flat 7 18 The Beacon Exmouth EX8 2AF

    Replace existing balcony railings at second floor front (south west) elevation

    3 Sep 2026 Heritage and listed buildings