Skip to content
PlanIndex Get alerts
Menu

Planning application

Weir Lodge Millford Road Sidmouth Devon EX10 8DP

Awaiting decision East Devon 26/1540/FUL Full Application

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of new timber gates and replacement of existing windows

As published by the council, reference 26/1540/FUL

Application record

Reference
26/1540/FUL
Type
Full Application
Status
Awaiting decision
Received
3 Aug 2026
Validated
3 Aug 2026
Ward
Sidmouth Rural
Parish
Sidmouth
Postcode
EX10 8DP

Timeline

Dates from the published record

  1. 3 Aug 2026

    Received by East Devon

  2. 5 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 28 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with East Devon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Weir Lodge Millford Road Sidmouth EX10 8DP

    26/0718/FUL Submitted 16 Apr 2026 2m away

    Demolition and replacement of detached garage.

    Granted Full applications Demolition 12 docs
  • Weir Lodge Millford Road Sidmouth Devon EX10 8DP

    26/1228/DOC Submitted 17 Jun 2026 2m away

    Discharge of condition for 26/0718/FUL: Condition 3 (Materials), Condition 4 (Drainage), Condition 5 (Ecology), Condition 6 (Trees)

    Granted Conditions Trees 9 docs
  • Strands Millford Road Sidmouth EX10 8DP

    26/1381/PRETDD Submitted 9 Jul 2026 37m away

    5 day notice: Elm - remove (dead). Exception to Sid Vale Conservation Area. Replacement planting: Elm 'New Horizons'

    Withdrawn Trees 1 doc
  • Flat 3 Counters Court Mill Street Sidmouth EX10 8DW

    22/2175/LBC Submitted 28 Sep 2022 67m away

    Replace 1 no. window on front (south) elevation.

    Granted Heritage and listed buildings Windows or glazing 11 docs
  • 6 Millford Avenue Sidmouth Devon EX10 8DS

    26/0363/TCA Submitted 23 Feb 2026 68m away

    T1424 : Sycamore - reduce tree height and lateral spread by up to approximately 2000mm with cut diameters up to 60mm. T1425 : Sycamore - reduce lateral spread by up to approximately 2000mm with cut diameters up to 60mm.

    Decided Trees 9 docs
  • 4 Counters Court Mill Street Sidmouth Devon EX10 8DW

    26/0295/LBC Submitted 27 Feb 2026 75m away

    Retention of paint work on south, west and north elevations; all render painted white; gutters, fascias, downpipes, timber windows and lower stone plinth painted ball green

    Refused Heritage and listed buildings Windows or glazing

In East Devon

  • 26/1714/FUL Awaiting decision

    5 Long Copp Budleigh Salterton Devon EX9 6DY

    Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit

    4 Sep 2026 Full applications
  • 26/1565/FUL Granted

    1 Hillymead Seaton EX12 2LF

    Retrospective permission for re-landscaping the drive area

    4 Aug 2026 Full applications
  • 26/1757/FUL Awaiting decision

    Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL

    New porch

    3 Sep 2026 Full applications
  • 26/1571/FUL Granted

    Hillsboro 44 Marlpit Lane Seaton EX12 2HL

    Construction of two-storey side extension

    5 Aug 2026 Full applications
  • 26/1536/FUL Granted

    Bramblings Smallridge Axminster EX13 7JL

    Single storey extension to the east elevation and raised patio.

    4 Aug 2026 Full applications