Planning application
Land At Station Road South Of Cottrell Road Broadclyst Station
Works: New dwelling Major scheme
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Hybrid application for full planning permission for the construction of 19 residential dwellings including 12 affordable housing, access, internal roads, parking, and landscaping and outline planning permission (with appearance, landscaping, layout and scale as reserved matters) for the construction of 5 self-build dwellings
As published by the council, reference 26/1454/MFUL
Application record
- Reference
- 26/1454/MFUL
- Type
- Major - Full application
- Status
- Awaiting decision
- Received
- 10 Aug 2026
- Validated
- 10 Aug 2026
- Ward
- Broadclyst
- Parish
- Broadclyst
Timeline
Dates from the published record
-
10 Aug 2026
Received by East Devon
-
16 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 9 November 2026, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.
East Devon took a median of 43 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
XL Planning Ltd Agent, a planning consultancy
98 applications on PlanIndex · across 14 councils · 72% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
55 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with East Devon for determination, against a statutory target of thirteen weeks. Over the last year East Devon decided full applications in a median of 50 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Threshing Barn Shermoor Farm Station Road Broadclyst Exeter EX5 3AZ
Construction of Front Porch.
Granted Full applications Extension 8 docsSmall domestic -
Little Hayes Broadclyst Station Exeter EX5 3AX
Replacement dwelling.
Granted Full applications 21 docsDomestic -
Spenco Ltd Clyst Honiton Exeter EX5 2DX
93% historically approved · decision due ~4 Feb
Construct a single storey, temporary portal-framed, fabric covered structure to provide warehousing to facilitate an expansion of production. The duration of the requirement will be between 5 and 7 years.
Awaiting decision Full applications 10 docsSmall domestic -
Exeter Logistics Park Werstan Road Clyst Honiton Devon EX5 2GB
Discharge of condition for 24/1114/FUL: Condition 3 (Landscaping)
Granted Conditions 3 docs
Other full applications
In East Devon
-
26/2021/FUL Awaiting decision
19 Stoneborough Lane Budleigh Salterton EX9 6HL
Proposed single storey rear and side extensions
-
26/1999/FUL Awaiting decision
Glendale Clyst St George Exeter EX3 0QJ
Demolition of existing rear single storey extension with replacement single storey extension and formation of new internal driveway
-
26/1111/FUL Refused
Flat 1 11 Marine Place Seaton EX12 2QJ
Replacing non-functioning timber sash windows with same style white uPVC sash windows on western elevation.
-
26/1770/FUL Awaiting decision
Roseleigh Church Road Colaton Raleigh Devon EX10 0LH
Demolition of existing bungalow and construction of replacement two-storey dwelling
-
26/1708/FUL Granted
Southlea Lower Broad Oak Road West Hill Ottery St Mary EX11 1XH
Proposed rear/south extension in place of existing conservatory, new entrance door and canopy, cladding and raised patio to main dwelling; garage extension and roof alterations, including solar installation