Planning application
West Winds Yawl Hill Lane Uplyme Devon DT7 3RW
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
External alterations including timber cladding and render, alterations to garage roof, and ground floor single storey extension following demolition of existing porch and conservatory (partially retrospective as foundations laid)
As published by the council, reference 26/1418/FUL
Application record
- Reference
- 26/1418/FUL
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 23 Jul 2026
- Validated
- 23 Jul 2026
- Ward
- Trinity
- Parish
- Uplyme
- Postcode
- DT7 3RW
Timeline
Dates from the published record
-
23 Jul 2026
Received by East Devon
-
5 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 17 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Devon took a median of 42 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Axminster
14 applications on PlanIndex · across 5 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with East Devon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Knoll Cottage Rocombe Lyme Regis DT7 3RR
93% historically approved · decision due ~8 Sep
Replace porch and provide raised terrace to rear
Awaiting decision Full applications Extension 10 docsSmall domestic
Other full applications applications
In East Devon
-
26/1714/FUL Awaiting decision
5 Long Copp Budleigh Salterton Devon EX9 6DY
Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit
-
26/1565/FUL Granted
1 Hillymead Seaton EX12 2LF
Retrospective permission for re-landscaping the drive area
-
26/1757/FUL Awaiting decision
Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL
New porch
-
26/1571/FUL Granted
Hillsboro 44 Marlpit Lane Seaton EX12 2HL
Construction of two-storey side extension
-
26/1536/FUL Granted
Bramblings Smallridge Axminster EX13 7JL
Single storey extension to the east elevation and raised patio.