Skip to content
PlanIndex Get alerts
Menu

Planning application

56 Scalwell Lane Seaton EX12 2DL

Awaiting decision East Devon 26/1245/FUL Full Application

Works: Extension Loft or dormer Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed single storey side extension, single storey rear extension, alterations to roof design with hip to gable on rear elevation, convert loft with dormer window and erection of shed.

As published by the council, reference 26/1245/FUL

Application record

Reference
26/1245/FUL
Type
Full Application
Status
Awaiting decision
Received
23 Jun 2026
Validated
23 Jun 2026
Ward
Seaton
Parish
Seaton
Postcode
EX12 2DL

Timeline

Dates from the published record

  1. 23 Jun 2026

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 18 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

ModArc LTD Agent, registered in Bridgwater

Active · incorporated 2018 · Bridgwater

8 applications on PlanIndex · across 5 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided full applications in a median of 50 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 60 Scalwell Lane Seaton Devon EX12 2DL

    26/1474/TRE Submitted 22 Jul 2026 42m away

    93% historically approved · decision due ~16 Sep

    Ash tree - Prune the canopy overhanging the driveway on the south side by up to 2m with pruning cuts up to 50mm in diameter, to suitable growth points, this will also reduce the encroachment on the dwelling

    Awaiting decision Trees 3 docs
    Domestic
  • 19 Riverdale Orchard Seaton Devon EX12 2RG

    25/1723/TRE Submitted 25 Aug 2025 43m away

    T1: Oak - crown reduction by 1m and thinning by 10% by removing small branches.

    Granted Trees 5 docs
  • 52 Scalwell Lane Seaton EX12 2DJ

    26/0410/TRE Submitted 27 Feb 2026 43m away

    T1, Oak : crown clean, remove, back to the collar, the growth going towards the power lines; remove, back to the collar, the lower 5 limbs extending towards the east, approximately 100-120mm diameter cuts, poor growth/ epicormic growth on these branches to go too, so a branch removal would suit the trees natural defence better.

    Refused Trees 5 docs
  • 52 Scalwell Lane Seaton EX12 2DJ

    26/1131/TRE Submitted 8 Jun 2026 43m away

    T1: Oak - reduce lower limbs (shown on annotated photograph) on the east side by up to 2-2.5m making cuts of approximately 80mm. Crown clean and cut away small growth near the powerlines approximately 40mm diameter.

    Granted Trees 8 docs
  • 65 Elizabeth Road Seaton EX12 2DS

    21/0404/FUL Submitted 10 Feb 2021 78m away

    Construction of garage to side.

    Granted Full applications 7 docs
  • 68 Scalwell Lane Seaton EX12 2DL

    25/2051/FUL Submitted 10 Oct 2025 116m away

    Demolition of garage, construction of new garage; extension of first floor, existing half-hipped roof replaced with new gable ends and construction of new pitched roof incorporating rooflights and PV panels; changes in fenestration, construction of canopy above entrance on west elevation, and inset balcony with glass balustrading on east (rear) elevation; external finishes including painted render, vertical cladding, and stone slip details; new raised terrace with glass balustrading to rear

    Granted Full applications Extension Loft or dormer +2 10 docs

In East Devon

  • 26/1859/FUL Awaiting decision

    55 King Alfred Way Newton Poppleford Sidmouth EX10 0DG

    Installation of conservatory to the rear of the property.

    15 Sep 2026 Full applications
  • 26/1796/FUL Awaiting decision

    Popplefords Barn Nursery And Farm Shop Exeter Road Newton Poppleford EX10 0DE

    Proposed change of use, conversion of the existing spa building to provide staff/Care Home Manager's accommodation tied to Hillside House Residential Care Home; retention of the existing single-storey plant/store building and associated works.

    11 Sep 2026 Full applications
  • 26/1448/FUL Granted

    16 Bussel Close Exeter EX1 3GU

    Proposed single storey extension on north elevation

    11 Aug 2026 Full applications
  • 26/1059/FUL Granted

    Little Hayes Broadclyst Station Exeter EX5 3AX

    Replacement dwelling.

    9 Jun 2026 Full applications
  • 26/1601/FUL Awaiting decision

    31 Newlands Road Sidmouth EX10 9NL

    Construction of first floor studio over existing detached garage with external staircase.

    10 Sep 2026 Full applications