Planning application

Land North East Of Deepways Budleigh Salterton

Awaiting decision East Devon 26/1160/V106 Section 106 Viability Reappraisal

Works: New dwelling Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Deed of variation of s106 agreement dated 28th November 2013 and its subsequent modifications, attached to planning consent 11/2629/MFUL (Residential development of 59 dwellings), to revise the affordable housing mix from 11 affordable rent and 11 shared ownership units to 18 affordable rented and 4 shared ownership dwellings.

As published by the council, reference 26/1160/V106

Application record

Reference
26/1160/V106
Type
Section 106 Viability Reappraisal
Status
Awaiting decision
Received
11 Jun 2026
Validated
11 Jun 2026
Ward
Budleigh And Raleigh
Parish
Budleigh Salterton

Timeline

Dates from the published record

  1. 11 Jun 2026

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 6 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

What happens while it is decided

This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided condition discharge and variation applications in a median of 23 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

In East Devon

  • 26/1853/DOC Granted

    Chelmer Woodhouse Hill Uplyme Lyme Regis DT7 3SL

    Discharge of condition for 25/1842/FUL: Condition 5 (Surface Water Drainage)

    14 Sep 2026 Conditions
  • 26/1850/DOC Awaiting decision

    6 Potters Close West Hill Devon EX11 1YE

    Discharge of condition for 25/1832/FUL: Condition 4 (Trees)

    14 Sep 2026 Conditions
  • 26/1833/DOC Awaiting decision

    2 Lower Wheathill Sidmouth Devon EX10 9UA

    Discharge of condition for 25/2420/FUL: Condition 4 (Tree Protection) and Condition 7 (Materials)

    10 Sep 2026 Conditions
  • 26/1845/DOC Awaiting decision

    Spout Hill Kilmington Axminster EX13 7RW

    Discharge of Condition for 26/1175/LBC: Condition 4a (brick, bedding and pointing mortar details) Bedding Bedding mortar is to be mixed using a well graded washed grit sand (5mm down to 0.075mm) and St Astier NHL 5 at a ratio of 1:2 ? of binder to aggregate by volume. Pointing The pointing mortar is to use a well graded washed aggregate (the largest particle size should not exceed one-third of the joint width) mixed with St Astier NHL5 at a ratio of 1:2 ? of binder to aggregate by volume. Bricks for Chimney Rebuild Reclaimed semi-engineering red brindle brick laid in stretcher bond.

    10 Sep 2026 Conditions
  • 26/1841/DOC Awaiting decision

    Musbury Garage, Spar Marlborough Road Musbury Devon EX13 8AX

    Discharge of condition for 25/1343/FUL: Condition 3 (CMP), Condition 4 (Materials), Condition 7 (Lighting).

    10 Sep 2026 Conditions