Skip to content
PlanIndex Get alerts
Menu

Planning application

26/0958/FUL

The Summerhouse Rousdon Lyme Regis DT7 3XU

Awaiting decision East Devon Full Application

Proposal

Remove existing shed. Proposed construction of a detached garage and open-sided car port with EV charging facilities. Solar array to be mounted on the roof

As published by the council, reference 26/0958/FUL

Timeline

Dates from the published record

  1. 25 Jun 2026

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with East Devon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/0224/TCA Awaiting decision

    The Summerhouse Rousdon Lyme Regis DT7 3XU

    Ash (x4): fell (Ash Die-back).

    9 Feb 2026 15m away Trees
  • 26/1177/TCA Awaiting decision

    East Lodge North Rousdon Lyme Regis DT7 3XU

    T1: Ash; remove to ground level, extensive Ash Die-back, dead. T2: Ash clump; 30% reduction of the crown to reduce the risk of failure due to ADB, to allow the tree/s to regenerate at a lower height. Max dia. cuts 100mm. T3: Ash; 30% reduction of the crown to reduce the risk of failure due to ADB, to allow the tree/s to regenerate at a lower height. Max dia. cuts 100mm. T4: Ash; remove to ground level, extensive Ash Die-back dead. T5: Ash clump; 30% reduction of the crown to reduce the risk of failure due to ADB, to allow the tree/s to regenerate at a lower height. Max dia. cuts 100mm. T6: Pine; crown clean to remove the lower dead limb and higher deadwood into the crown. T7: Ash; 30% reduction of the crown to reduce the risk of failure due to ADB, to allow the tree/s to regenerate at a lower height. Max dia. cuts 100mm. T8: Monterey Cypress; crown clean, deadwood removal over the shed/garage.

    11 Jun 2026 254m away Trees

In East Devon

  • 26/0768/FUL Granted

    2 Yew Tree Cottage New Road Beer Seaton EX12 3JR

    Replacement of doors and windows and demolition of existing single storey garage

    24 Apr 2026 Full applications
  • 26/1490/FUL Awaiting decision

    7 Broad Street Ottery St Mary EX11 1BS

    Renovation works and new rear external staircase to commercial property

    28 Jul 2026 Full applications
  • 26/1486/FUL Awaiting decision

    Holly Batch Cooks Lane Axminster EX13 5SQ

    New single storey garden room extension to rear elevation.

    27 Jul 2026 Full applications
  • 26/1363/FUL Awaiting decision

    Lower Cobden Whimple Exeter EX5 2PZ

    Full planning permission for the change of use of Barn 5 from agricultural uses to storage and distribution (Use Class B8) (Retrospective)

    23 Jul 2026 Full applications
  • 26/1505/FUL Awaiting decision

    1 Whinfield Terrace Barline Beer EX12 3LN

    Erection of replacement garage/outbuilding

    23 Jul 2026 Full applications