Skip to content
PlanIndex Get alerts
Menu

Planning application

Barnards Harepath Hill Seaton EX12 2TF

Awaiting decision East Devon 26/0885/FUL Full Application

Works: New dwelling

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Construction of 3 no. self-build dwellings and associated works

As published by the council, reference 26/0885/FUL

Application record

Reference
26/0885/FUL
Type
Full Application
Status
Awaiting decision
Received
18 Jun 2026
Validated
18 Jun 2026
Ward
Seaton
Parish
Seaton
Postcode
EX12 2TF

Timeline

Dates from the published record

  1. 18 Jun 2026

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 13 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 43 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Dalton Aram Planning Ltd Agent, a planning consultancy registered in Seaton

Active · incorporated 2014 · Seaton

46 applications on PlanIndex · across 2 councils · 82% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided full applications in a median of 50 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land Adjacent Harepath Hill Harepath Hill Seaton EX12 2TF

    25/2552/DOC Submitted 11 Dec 2025 200 yards away

    97% historically approved · decision due ~5 Feb

    Discharge of Condition for 22/2542/FUL: Condition 3 (Written Scheme of Investigation) and 4 (Tree Protection Details)

    Awaiting decision Conditions Trees 5 docs
  • 29 Poplar Tree Drive Seaton EX12 2TW

    25/1844/DOC Submitted 4 Sep 2025 350 yards away

    Discharge of Condition for 23/2575/FUL: Condition 3 (Cladding)

    Granted Conditions 2 docs
  • Uppacott Harepath Hill Seaton Devon EX12 2TF

    26/1520/CPE Submitted 28 Jul 2026 400 yards away

    79% historically approved · decision due ~22 Sep

    Lawful Development Certificate (CLUED) to confirm that the alterations to the building and its use as a dwelling for holiday accommodation purposes is lawful

    Awaiting decision Lawful development 13 docs
    Domestic
  • Monterey Harepath Hill Seaton EX12 2TA

    26/1900/TRE Submitted 28 Sep 2026 400 yards away

    93% historically approved · decision due ~23 Nov

    T1, Monterey pine : height reduction by approximately 60% to reduce the potential risk of failure; cutting all growth above the red line on the image attached and maintaining the lowest growth point of the stem.

    Awaiting decision Trees 4 docs
  • Land To The South Of Harepath Hill Seaton

    25/1788/MOUT Submitted 9 Sep 2025 0.2 miles away

    91% historically approved · decision due ~9 Dec

    Outline application (approval sought for means of access) for residential development comprising of up to 72 dwellings, the formation of vehicular and pedestrian access from Harepath Road, public open space and other associated infrastructure

    Awaiting decision Outline New dwelling 43 docs
    Major scheme
  • Manor Farm Camping And Caravan Site Seaton Down Hill Seaton EX12 2JA

    26/0172/FUL Submitted 9 Feb 2026 0.3 miles away

    93% historically approved · decision due ~6 Apr

    Change of use of 12 no. existing touring pitches to permanent pitches for static holiday caravan accommodation

    Awaiting decision Full applications 8 docs

In East Devon

  • 26/2021/FUL Awaiting decision

    19 Stoneborough Lane Budleigh Salterton EX9 6HL

    Proposed single storey rear and side extensions

    Received 5 Oct, published by the council 9 Oct 2026 Full applications
  • 26/1999/FUL Awaiting decision

    Glendale Clyst St George Exeter EX3 0QJ

    Demolition of existing rear single storey extension with replacement single storey extension and formation of new internal driveway

    Received 5 Oct, published by the council 9 Oct 2026 Full applications
  • 26/1111/FUL Refused

    Flat 1 11 Marine Place Seaton EX12 2QJ

    Replacing non-functioning timber sash windows with same style white uPVC sash windows on western elevation.

    Received 9 Jun, published by the council 26 Jul 2026 Full applications
  • 26/1770/FUL Awaiting decision

    Roseleigh Church Road Colaton Raleigh Devon EX10 0LH

    Demolition of existing bungalow and construction of replacement two-storey dwelling

    Received 2 Oct, published by the council 9 Oct 2026 Full applications
  • 26/1708/FUL Granted

    Southlea Lower Broad Oak Road West Hill Ottery St Mary EX11 1XH

    Proposed rear/south extension in place of existing conservatory, new entrance door and canopy, cladding and raised patio to main dwelling; garage extension and roof alterations, including solar installation

    Received 7 Sep, published by the council 17 Sep 2026 Full applications