Meadow Linhay Church Road Lympstone Exmouth EX8 5JU

Awaiting decision East Devon 26/0297/DOC Discharge of Condition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of Condition for 23/2386/FUL: Condition 3 (CMP), Condition 4, (WSI), Condition 5 (Arboricultural Report), Condition 6 (Materials), Condition 7 (Landscaping), Condition 10 (WSI PIA), Condition 12 (Solar), Condition 13 (SWD).

As published by the council, reference 26/0297/DOC

Application record

Reference
26/0297/DOC
Type
Discharge of Condition
Status
Awaiting decision
Received
13 Feb 2026
Validated
13 Feb 2026
Ward
Woodbury And Lympstone
Parish
Lympstone
Postcode
EX8 5JU

Timeline

Dates from the published record

  1. 13 Feb 2026

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 10 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

In Ex Design Agent, a design practice

16 applications on PlanIndex · across 3 councils · 83% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided condition discharge and variation applications in a median of 23 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • The Linhay Church Road Lympstone Exmouth EX8 5JU

    26/1288/FUL Submitted 4 Aug 2026 8m away

    93% historically approved · decision due ~29 Sep

    Proposed 1no. dwelling, landscaped garden with off-road parking and single storey double garage/workshop (re-submission of 23/0847/FUL)

    Awaiting decision Full applications 16 docs
    Domestic
  • 11 Charles Court Lympstone Exmouth EX8 5EL

    26/1499/TCA Submitted 22 Jul 2026 46m away

    Eucalyptus - remove; the tree was planted approx 4 years ago when the house was built. Its base is sited approx 300mm from the building and it has grown to a height of approx 6m. The location is totally inappropriate for this type of tree with potential for the roots to undermine the property.

    Decided Trees 7 docs
  • Monterey Strawberry Hill Lympstone Devon EX8 5JZ

    25/1870/TRE Submitted 9 Sep 2025 92m away

    T314, Noble Fir : reduce height by up to 3m. G1 Fell two Eucalyptus trees

    Granted Trees 5 docs
  • Abbotsford Longmeadow Road Lympstone Devon EX8 5LE

    25/1595/FUL Submitted 29 Aug 2025 101m away

    Demolition of existing single storey extension and detached garage to facilitate creation of a new two storey detached dwelling

    Refused Full applications New dwelling Extension +1 23 docs
    Small domestic
  • Abbotsford Longmeadow Road Lympstone EX8 5LE

    26/0645/FUL Submitted 14 Apr 2026 101m away

    Creation of a new two storey detached dwelling.

    Granted Full applications New dwelling 23 docs
    Domestic
  • The Retreat Church Road Lympstone Devon EX8 5JU

    25/1889/DOC Submitted 11 Sep 2025 112m away

    Discharge of condition for 24/2513/FUL: Condition 3 (Surface Water Drainage)

    Granted Conditions 9 docs

In East Devon

  • 26/1853/DOC Granted

    Chelmer Woodhouse Hill Uplyme Lyme Regis DT7 3SL

    Discharge of condition for 25/1842/FUL: Condition 5 (Surface Water Drainage)

    14 Sep 2026 Conditions
  • 26/1850/DOC Awaiting decision

    6 Potters Close West Hill Devon EX11 1YE

    Discharge of condition for 25/1832/FUL: Condition 4 (Trees)

    14 Sep 2026 Conditions
  • 26/1833/DOC Awaiting decision

    2 Lower Wheathill Sidmouth Devon EX10 9UA

    Discharge of condition for 25/2420/FUL: Condition 4 (Tree Protection) and Condition 7 (Materials)

    10 Sep 2026 Conditions
  • 26/1845/DOC Awaiting decision

    Spout Hill Kilmington Axminster EX13 7RW

    Discharge of Condition for 26/1175/LBC: Condition 4a (brick, bedding and pointing mortar details) Bedding Bedding mortar is to be mixed using a well graded washed grit sand (5mm down to 0.075mm) and St Astier NHL 5 at a ratio of 1:2 ? of binder to aggregate by volume. Pointing The pointing mortar is to use a well graded washed aggregate (the largest particle size should not exceed one-third of the joint width) mixed with St Astier NHL5 at a ratio of 1:2 ? of binder to aggregate by volume. Bricks for Chimney Rebuild Reclaimed semi-engineering red brindle brick laid in stretcher bond.

    10 Sep 2026 Conditions
  • 26/1841/DOC Awaiting decision

    Musbury Garage, Spar Marlborough Road Musbury Devon EX13 8AX

    Discharge of condition for 25/1343/FUL: Condition 3 (CMP), Condition 4 (Materials), Condition 7 (Lighting).

    10 Sep 2026 Conditions