Skip to content
PlanIndex Get alerts
Menu

Planning application

26/0192/LBC

Sidford Farm School Street Sidford EX10 9PF

Awaiting decision East Devon Listed Building Consent

Proposal

Retention of a lift void in the floor and installation of a new lift.

As published by the council, reference 26/0192/LBC

Timeline

Dates from the published record

  1. 2 Feb 2026

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with East Devon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • 26/1127/FUL Awaiting decision

    9 Sid Vale Close Sidford EX10 9PH

    Construction of living room and porch extension

    5 Jun 2026 32m away Full applications
  • 21/0377/FUL Granted

    25 Sidford High Street Sidford Sidmouth EX10 9SN

    Construction of single and two-storey side extensions (part ground floor as garage conversion).

    8 Feb 2021 315m away Full applications
  • 26/1010/FUL Awaiting decision

    Oakdene Higher Brook Meadow Sidford Sidmouth EX10 9SS

    To construct a double garage to the front of the property; to convert the existing single integral garage into a bedroom; to expand the rear facing dormer; to install two additional Velux windows to the south elevation and resurface the driveway

    1 Jun 2026 359m away Full applications
  • 25/2565/FUL Awaiting decision

    70A Malden Road Sidmouth EX10 9NA

    Retrospective application to regularise the site boundary as built; proposed erection of garage, summer house and bin/store shed

    18 Dec 2025 487m away Full applications

In East Devon

  • 26/1306/LBC Awaiting decision

    Pulshays Combe Raleigh Honiton EX14 4UJ

    Install vent in rear door on north elevation; installation of Ecco Stove and flue in living room/bedroom 1; create opening in existing stone cap chimney for flue and install clay pot on western chimney stack on western elevation

    22 Jul 2026 Heritage and listed buildings
  • 26/1475/LBC Awaiting decision

    121 High Street Honiton EX14 1LS

    Proposed replacement of 1x non-illuminated fascia sign and 1x non-illuminated hanging sign to the shopfront.

    20 Jul 2026 Heritage and listed buildings
  • 26/0499/LBC Granted

    22 Bicton Street Exmouth EX8 2RU

    To replace the existing wooden and lead-clad guttering with black cast aluminium rounded guttering

    25 Mar 2026 Heritage and listed buildings
  • 26/0601/LBC Granted

    Lady Seawards C Of E Primary School Clyst St George Exeter EX3 0RE

    Replacement of main entrance and secondary entrance gates with new gates 2m in height

    7 Apr 2026 Heritage and listed buildings
  • 26/0593/LBC Granted

    Norton Garth Court Station Road Sidmouth

    Side (SW) elevation north block shutters retained and repaired; side (sw) elevation middle block shutters removed; side (SW) elevation north and middle blocks and front (SE) elevation south block vestibule, all rainwater goods replaced; side (SW) elevation north and middle block 4no. second floor dormers, replace flat roofs and repair soffits/facias where necessary; side (SW) elevation north block 2no. bays at first floor, windows repaired/replaced where necessary retaining all existing glazing units, replace roofs & repair sub-structures where necessary; front (SW) elevation north block replace veranda & feature roof, repair soffits & fascias & balustrades where necessary; install new drainage channel to northern end of veranda below rainwater downpipe discharge point. side (SW) elevation south block, front (SE) elevation south block, and side (NE) elevation south block replace vestibule roof, repair soffits & fascias & balustrades where necessary

    17 Apr 2026 Heritage and listed buildings