Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To South Broadway Woodbury

Awaiting decision East Devon 25/2611/DOC Discharge of Condition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of Condition for 22/2838/MOUT: Condition 21 (Pedestrian Crossing)

As published by the council, reference 25/2611/DOC

Application record

Reference
25/2611/DOC
Type
Discharge of Condition
Status
Awaiting decision
Received
18 Dec 2025
Validated
18 Dec 2025
Ward
Woodbury And Lympstone
Parish
Woodbury

Site history

Applications at this address on the East Devon register

This site has had 2 applications since 2025.

  • 26/0024/FUL Awaiting decision

    Land To South Broadway Woodbury

    Construction of pedestrian bridge

    Submitted 14 Jan 2026 Full applications

Timeline

Dates from the published record

  1. 18 Dec 2025

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 12 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

CarneySweeney Ltd Agent, registered in Farnham

Active · incorporated 2019 · Farnham

493 applications on PlanIndex · across 101 councils · 96% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided condition discharge and variation applications in a median of 23 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land To South Broadway Woodbury

    26/0024/FUL Submitted 14 Jan 2026 98m away

    93% historically approved · decision due ~11 Mar

    Construction of pedestrian bridge

    Awaiting decision Full applications 12 docs
  • Heatherdene Broadway Woodbury Exeter EX5 1NR

    26/1167/TCA Submitted 10 Jun 2026 117m away

    T1 - Plum, crown reduce by 2m for weight alleviation. T2 - Golden Rain Tree, remove two low dead limbs in southwestern canopy.

    Decided Trees 5 docs
  • Lea House Couches Lane Woodbury Exeter EX5 1HL

    26/0217/CPL Submitted 15 Feb 2026 161m away

    Use of the building as a C3 residential annexe, installation of new roof covering and installation of new windows and doors

    Granted Lawful development Roofing Windows or glazing 11 docs
  • Meadowside Broadway Woodbury Exeter EX5 1NR

    26/1820/FUL Submitted 7 Sep 2026 168m away

    93% historically approved · decision due ~2 Nov

    Two-storey extension, side porch and internal alterations.

    Awaiting decision Full applications Extension 12 docs
    Small domestic
  • 21 Meadow View Close Woodbury Exeter EX5 1FW

    26/0713/FUL Submitted 12 May 2026 171m away

    93% historically approved · decision due ~7 Jul

    Proposed change of use of agricultural land to residential

    Awaiting decision Full applications 6 docs
  • Bixley Haven Broadway Woodbury Exeter EX5 1NR

    26/0964/TCA Submitted 14 May 2026 180m away

    T1 - Cedar, fell to ground level. T2 - Ash, remove upper canopy to leave 6m habitat poles. T3 - Leyland Cypress, fell to ground level. T5 - Monterey Cypress, crown lift to 3m above ground level. T6 - Portuguese Laurel, trim top hard to shape. T7 - Robinia, crown reduce by up to 2m, ensuring a minimum 1.5m clearance from property.

    Decided Trees 6 docs

In East Devon

  • 26/1853/DOC Granted

    Chelmer Woodhouse Hill Uplyme Lyme Regis DT7 3SL

    Discharge of condition for 25/1842/FUL: Condition 5 (Surface Water Drainage)

    14 Sep 2026 Conditions
  • 26/1850/DOC Awaiting decision

    6 Potters Close West Hill Devon EX11 1YE

    Discharge of condition for 25/1832/FUL: Condition 4 (Trees)

    14 Sep 2026 Conditions
  • 26/1833/DOC Awaiting decision

    2 Lower Wheathill Sidmouth Devon EX10 9UA

    Discharge of condition for 25/2420/FUL: Condition 4 (Tree Protection) and Condition 7 (Materials)

    10 Sep 2026 Conditions
  • 26/1845/DOC Awaiting decision

    Spout Hill Kilmington Axminster EX13 7RW

    Discharge of Condition for 26/1175/LBC: Condition 4a (brick, bedding and pointing mortar details) Bedding Bedding mortar is to be mixed using a well graded washed grit sand (5mm down to 0.075mm) and St Astier NHL 5 at a ratio of 1:2 ? of binder to aggregate by volume. Pointing The pointing mortar is to use a well graded washed aggregate (the largest particle size should not exceed one-third of the joint width) mixed with St Astier NHL5 at a ratio of 1:2 ? of binder to aggregate by volume. Bricks for Chimney Rebuild Reclaimed semi-engineering red brindle brick laid in stretcher bond.

    10 Sep 2026 Conditions
  • 26/1841/DOC Awaiting decision

    Musbury Garage, Spar Marlborough Road Musbury Devon EX13 8AX

    Discharge of condition for 25/1343/FUL: Condition 3 (CMP), Condition 4 (Materials), Condition 7 (Lighting).

    10 Sep 2026 Conditions