Skip to content
PlanIndex Get alerts
Menu

Planning application

6 Lower Wheathill Sidmouth EX10 9UA

Awaiting decision East Devon 25/2599/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed two storey extension to north east elevation and two storey extension to north west as permitted ref. 25/0479/FUL with the addition of a single storey link and garage extension.

As published by the council, reference 25/2599/FUL

Application record

Reference
25/2599/FUL
Type
Full Application
Status
Awaiting decision
Received
16 Dec 2025
Validated
16 Dec 2025
Ward
Sidmouth Sidford
Parish
Sidmouth
Postcode
EX10 9UA

Timeline

Dates from the published record

  1. 16 Dec 2025

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 10 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

KD Crellen Partnership Ltd Agent

38 applications on PlanIndex · across 4 councils · 85% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided full applications in a median of 50 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 6 Lower Wheathill Sidmouth Devon EX10 9UA

    25/1834/FUL Submitted 3 Sep 2025 0m away

    Proposed two storey extension to north east elevation and two storey extension to north west (Re-submission of 25/0479/FUL), with the addition of a single storey link and garage extension.

    Refused Full applications Extension 17 docs
    Small domestic
  • 6 Lower Wheathill Sidmouth Devon EX10 9UA

    25/2085/TRE Submitted 10 Oct 2025 27m away

    T2, Monterey pine: Fell and undertake replacement planting scheme

    Refused Trees 15 docs
  • 2 Lower Wheathill Sidmouth Devon EX10 9UA

    26/1833/DOC Submitted 10 Sep 2026 47m away

    97% historically approved · decision due ~5 Nov

    Discharge of condition for 25/2420/FUL: Condition 4 (Tree Protection) and Condition 7 (Materials)

    Awaiting decision Conditions Trees 3 docs
  • 9 Lower Wheathill Sidmouth EX10 9UA

    26/0801/TRE Submitted 23 Apr 2026 69m away

    T1, Atlas Cedar : Full crown reduction by approximately 2m to leave a final height of approximately 11m and final spread of approximately 9-10m.

    Granted Trees
  • 2 Lower Wheathill Sidmouth Devon EX10 9UA

    25/2420/FUL Submitted 4 Dec 2025 104m away

    Construction of front and rear extensions, raising the roof including dormers to form first floor living space. Construction of first floor balcony

    Granted Full applications Extension Loft or dormer 16 docs
  • 30 Tyrrell Mead Sidmouth EX10 9TP

    26/0806/CPL Submitted 7 May 2026 226m away

    79% historically approved · decision due ~2 Jul

    Certificate of lawfulness for proposed demolition of existing lean-to and garden store/WC, and construction of a conservatory on the south/west elevation

    Awaiting decision Lawful development Extension Demolition 8 docs

In East Devon

  • 26/1859/FUL Awaiting decision

    55 King Alfred Way Newton Poppleford Sidmouth EX10 0DG

    Installation of conservatory to the rear of the property.

    15 Sep 2026 Full applications
  • 26/1796/FUL Awaiting decision

    Popplefords Barn Nursery And Farm Shop Exeter Road Newton Poppleford EX10 0DE

    Proposed change of use, conversion of the existing spa building to provide staff/Care Home Manager's accommodation tied to Hillside House Residential Care Home; retention of the existing single-storey plant/store building and associated works.

    11 Sep 2026 Full applications
  • 26/1448/FUL Granted

    16 Bussel Close Exeter EX1 3GU

    Proposed single storey extension on north elevation

    11 Aug 2026 Full applications
  • 26/1059/FUL Granted

    Little Hayes Broadclyst Station Exeter EX5 3AX

    Replacement dwelling.

    9 Jun 2026 Full applications
  • 26/1601/FUL Awaiting decision

    31 Newlands Road Sidmouth EX10 9NL

    Construction of first floor studio over existing detached garage with external staircase.

    10 Sep 2026 Full applications