Skip to content
PlanIndex Get alerts
Menu

Planning application

25/2462/FUL

25 Pine Park Road Honiton EX14 2HR

Awaiting decision East Devon Full Application

Proposal

Demolition of dwelling, construction of replacement single dwelling and associated works

As published by the council, reference 25/2462/FUL

Timeline

Dates from the published record

  1. 22 Dec 2025

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with East Devon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/1330/DOC Awaiting decision

    25 Pine Park Road Honiton Devon EX14 2HR

    Discharge of conditions for 25/2462/FUL : Condition 3 (materials), Condition 4 (vehicular access), Condition 5 (landscaping), Condition 6 (ecology enhancement)

    30 Jun 2026 0m away Conditions
  • 26/1494/PIP Awaiting decision

    25 Pine Park Road Honiton EX14 2HR

    Permission in principle for the erection of 1no. new dwelling

    21 Jul 2026 6m away Outline
  • 25/2494/TRE Awaiting decision

    3 Glenview Honiton EX14 2NT

    T1, Silver Birch : prune and crown reduce the height and spread by 10%, making natural target pruning cuts of up to 25 mm in diameter and removing branch lengths of up to 1.5m.

    4 Dec 2025 43m away Trees
  • 26/0870/DOC Granted

    7 Pine Park Road Honiton EX14 2HZ

    Discharge of conditions for 25/1270/FUL : Condition 4 (external cladding material)

    1 May 2026 189m away Conditions
  • 26/0025/FUL Awaiting decision

    3 Pine Park Road Honiton EX14 2HZ

    Demolition of an existing conservatory and replacement with a rear extension

    15 Jan 2026 218m away Full applications
  • 26/0707/FUL Awaiting decision

    9 Pinaster Close Honiton EX14 2UL

    Proposed single storey extension

    15 Apr 2026 294m away Full applications

In East Devon

  • 26/0768/FUL Granted

    2 Yew Tree Cottage New Road Beer Seaton EX12 3JR

    Replacement of doors and windows and demolition of existing single storey garage

    24 Apr 2026 Full applications
  • 26/1490/FUL Awaiting decision

    7 Broad Street Ottery St Mary EX11 1BS

    Renovation works and new rear external staircase to commercial property

    28 Jul 2026 Full applications
  • 26/1486/FUL Awaiting decision

    Holly Batch Cooks Lane Axminster EX13 5SQ

    New single storey garden room extension to rear elevation.

    27 Jul 2026 Full applications
  • 26/1363/FUL Awaiting decision

    Lower Cobden Whimple Exeter EX5 2PZ

    Full planning permission for the change of use of Barn 5 from agricultural uses to storage and distribution (Use Class B8) (Retrospective)

    23 Jul 2026 Full applications
  • 26/1505/FUL Awaiting decision

    1 Whinfield Terrace Barline Beer EX12 3LN

    Erection of replacement garage/outbuilding

    23 Jul 2026 Full applications