Planning application
25/2460/FUL
The Parish Church Of St John The Baptist Church Lane Membury
Proposal
Proposed change of use of agricultural land to allow for the extension of the graveyard (sui generis).
As published by the council, reference 25/2460/FUL
Timeline
Dates from the published record
-
11 Dec 2025
Received by East Devon
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with East Devon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/1389/DOC Awaiting decision
Peppercorn Cottage Membury Axminster EX13 7AG
Discharge of condition for 25/0231/FUL: Condition3 (Surface Water Drainage)
-
26/0437/DOC Refused
Peppercorn Cottage Membury Axminster EX13 7AG
Discharge of conditions for 25/0231/FUL: Condition 3 (Surface water drainage), Condition 4 (Roof materials)
-
26/1352/TRE Awaiting decision
8 Heath Common Membury Axminster EX13 7UF
T2, Oak; crown lift and target prune southern aspect to take the crown up and away from the home owners property. Crown clean, removal of deadwood. Remove the lower limb back to the stem on the southern side. Higher target prunes of up to 2.5m in length and up to 50mm dia. leaving appropriate growth points and shaping-in.
-
26/1350/TRE Awaiting decision
Magnolia Cottage Membury Axminster EX13 7TF
T1, Ash; sectionally fell to ground level - tree has been showing progressive signs of Ash Die-Back, resulting in an accumulation of deadwood in the canopy and deadwood falling onto the homeowners garden and property.
Other full applications applications
In East Devon
-
26/0768/FUL Granted
2 Yew Tree Cottage New Road Beer Seaton EX12 3JR
Replacement of doors and windows and demolition of existing single storey garage
-
26/1490/FUL Awaiting decision
7 Broad Street Ottery St Mary EX11 1BS
Renovation works and new rear external staircase to commercial property
-
26/1486/FUL Awaiting decision
Holly Batch Cooks Lane Axminster EX13 5SQ
New single storey garden room extension to rear elevation.
-
26/1363/FUL Awaiting decision
Lower Cobden Whimple Exeter EX5 2PZ
Full planning permission for the change of use of Barn 5 from agricultural uses to storage and distribution (Use Class B8) (Retrospective)
-
26/1505/FUL Awaiting decision
1 Whinfield Terrace Barline Beer EX12 3LN
Erection of replacement garage/outbuilding