Skip to content
PlanIndex Get alerts
Menu

Planning application

4 Coombelake Cottages Coombelake Ottery St Mary EX11 1NG

Awaiting decision East Devon 25/2426/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Roof terrace on existing single storey flat roofed extension (part retrospective).

As published by the council, reference 25/2426/FUL

Application record

Reference
25/2426/FUL
Type
Full Application
Status
Awaiting decision
Received
2 Dec 2025
Validated
2 Dec 2025
Ward
Ottery St Mary
Parish
Ottery St Mary
Postcode
EX11 1NG

Site history

Applications at this address on the East Devon register

This site has had 2 applications since 2025.

  • 26/0513/NMA Decided

    4 Coombelake Cottages Coombelake Ottery St Mary EX11 1NG

    Minor amendment for 25/2426/FUL : To move the spiral staircase to the right (south) by approximately 1.2m and change to the wording of condition 3 on original permission to be in relation to the revised submitted plan.

    Decided 14 Apr 2026 Amendments

Timeline

Dates from the published record

  1. 2 Dec 2025

    Received by East Devon

  2. 12 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 27 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 26/0513/NMA Decided

    4 Coombelake Cottages Coombelake Ottery St Mary EX11 1NG

    Minor amendment for 25/2426/FUL : To move the spiral staircase to the right (south) by approximately 1.2m and change to the wording of condition 3 on original permission to be in relation to the revised submitted plan.

    Decided 14 Apr 2026 Amendments

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

16 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided full applications in a median of 49 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 4 Coombelake Cottages Coombelake Ottery St Mary EX11 1NG

    26/0513/NMA Submitted 16 Mar 2026 0m away

    Minor amendment for 25/2426/FUL : To move the spiral staircase to the right (south) by approximately 1.2m and change to the wording of condition 3 on original permission to be in relation to the revised submitted plan.

    Decided Amendments 6 docs
  • The Coaching Cottage 4 The Fairmile Fairmile Ottery St Mary EX11 1LP

    26/1063/FUL Submitted 28 May 2026 312m away

    Removal of existing timber coach house doors and installation of new joinery panel comprising timber front entrance door and timber flush casement windows

    Granted Full applications Windows or glazing 9 docs
  • The Coaching Cottage 4 The Fairmile Fairmile Ottery St Mary EX11 1LP

    26/1064/LBC Submitted 28 May 2026 312m away

    94% historically approved · decision due ~23 Jul

    Removal of existing timber coach house doors and installation of new joinery panel comprising timber front entrance door and timber flush casement windows

    Awaiting decision Heritage and listed buildings Windows or glazing 7 docs
  • 7 Taleford Villas Taleford Devon EX11 1NB

    25/2617/FUL Submitted 19 Dec 2025 498m away

    93% historically approved · decision due ~13 Feb

    Construction of two storey side extension and front porch.

    Awaiting decision Full applications Extension 15 docs
    Small domestic

In East Devon

  • 26/1714/FUL Awaiting decision

    5 Long Copp Budleigh Salterton Devon EX9 6DY

    Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit

    4 Sep 2026 Full applications
  • 26/1565/FUL Granted

    1 Hillymead Seaton EX12 2LF

    Retrospective permission for re-landscaping the drive area

    4 Aug 2026 Full applications
  • 26/1757/FUL Awaiting decision

    Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL

    New porch

    3 Sep 2026 Full applications
  • 26/1571/FUL Granted

    Hillsboro 44 Marlpit Lane Seaton EX12 2HL

    Construction of two-storey side extension

    5 Aug 2026 Full applications
  • 26/1536/FUL Granted

    Bramblings Smallridge Axminster EX13 7JL

    Single storey extension to the east elevation and raised patio.

    4 Aug 2026 Full applications