Planning application
Winch House Queens Drive Exmouth EX8 2AY
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of condition for 25/0176/FUL: Condition 4 (Materials)
As published by the council, reference 25/2380/DOC
Application record
- Reference
- 25/2380/DOC
- Type
- Discharge of Condition
- Status
- Awaiting decision
- Received
- 19 Nov 2025
- Validated
- 19 Nov 2025
- Ward
- Exmouth Littleham
- Parish
- Exmouth
- Postcode
- EX8 2AY
Site history
Applications at this address on the East Devon register
This site has had 2 applications since 2025: 1 approved, 0 refused.
-
25/1770/DOC Granted
Winch House Queens Drive Exmouth EX8 2AY
Discharge of Condition for 25/0176/FUL: Condition 3 (Construction and Environment Management Plan)
Timeline
Dates from the published record
-
19 Nov 2025
Received by East Devon
-
12 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 14 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Devon took a median of 43 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Paul Humphries Architects Ltd Agent, an architecture practice registered in Exeter
Active · incorporated 2004 · Exeter
36 applications on PlanIndex · across 5 councils · 96% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided condition discharge and variation applications in a median of 22 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Winch House Queens Drive Exmouth EX8 2AY
Discharge of Condition for 25/0176/FUL: Condition 3 (Construction and Environment Management Plan)
Granted Conditions 3 docs -
Queens Drive Seawall Exmouth EX8 2GD
93% historically approved · decision due ~26 Dec
Retrospective flood and coastal erosion risk management scheme comprising the replacement of a failed section of the Queens Drive Seawall. The development included removal of the former seawall and installation of an anchored steel sheet pile retaining wall along the alignment of the former structure and facilitating compound and stockpiling areas.
Awaiting decision Full applications 18 docs -
Unit 6 And 7 Sideshore Queens Drive Exmouth EX8 2GD
2no non-illuminated circular signs - one on the west elevation and one on the east elevation
Split decision Advertising 6 docs -
Execliff 1 Trefusis Terrace Exmouth EX8 2AX
Removal of the first floor balcony conservatory structures and structural repair and alterations to the the first floor balconies to flats 1 and 2.
Granted Full applications New dwelling Extension 9 docs -
6 Trefusis House, Flat 1 Trefusis Terrace Exmouth EX8 2AX
Replace plain casement UPVC window with new UPVC window with glazing bars.
Granted Full applications Windows or glazing 8 docs -
2A Carlton Hill Exmouth Devon EX8 2AH
Proposed first floor and roof extension with associated external alterations including new and replacement windows and doors, installation of weatherboarding and PV Panels
Granted Full applications Extension Windows or glazing 23 docs
Other condition discharge and variation applications
In East Devon
-
26/2041/DOC Awaiting decision
Lower Corry Farm Dalwood Axminster EX13 7HJ
Discharge of condition for 24/1032/LBC: Condition 3 (Materials)
-
26/2038/DOC Awaiting decision
Skypark Dakota Way Exeter Airport Clyst Honiton Exeter EX5 2BD
Discharge of condition for 22/2825/MFUL: Condition 4 (CEMP), Condition 5 (Asbestos Management Survey), Condition 6 (Drainage), Condition 7 (Landscaping)
-
26/2042/DOC Awaiting decision
8 Oakbeer Orchard Cranbrook Devon EX5 7BL
Discharge of conditions for 26/0188/FUL : Condition 3 (surface water drainage)
-
26/2026/DOC Awaiting decision
Plot 6 Tiger Moth Road Skypark Clyst Honiton Exeter EX5 2BD
Discharge of conditions for 26/0479/MFUL : Condition 4 (surface water drainage) Condition 5 (soft/hard landscaping), Condition 9 (construction works), Condition 10 (Construction Management Plan), Condition 12 (CEcoMP), Condition 13 (LEMP), Condition 14 (wildlife hazard management plan) , Condition 15 (IFP Assessment), Condition 16 (waste audit statement), Condition 17 (ground conditions)
-
26/2017/DOC Granted
May House Combpyne Road Musbury EX13 8AR
Discharge of Condition for 25/2292/LBC: Condition 6