Skip to content
PlanIndex Get alerts
Menu

Planning application

Driftwood Barline Beer Devon EX12 3LR

Awaiting decision East Devon 25/2354/FUL Full Application

Works: Extension Loft or dormer Roofing Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed loft conversion comprising rear dormer and associated alterations to roof. Replacement of conservatory with two storey extension, alterations to fenestration, additional external materials, installation of solar panels and construction of detached garage with permeable parking area

As published by the council, reference 25/2354/FUL

Application record

Reference
25/2354/FUL
Type
Full Application
Status
Awaiting decision
Received
12 Dec 2025
Validated
12 Dec 2025
Ward
Beer And Branscombe
Parish
Beer
Postcode
EX12 3LR

Timeline

Dates from the published record

  1. 12 Dec 2025

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 6 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

David Golightly Consulting Engineers Ltd Agent, an engineering consultancy registered in Exeter

Active · incorporated 2008 · Exeter

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided full applications in a median of 50 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Driftwood Barline Beer Seaton EX12 3LR

    26/1149/FUL Submitted 12 Jun 2026 0m away

    93% historically approved · decision due ~7 Aug

    Construction of a detached garage

    Awaiting decision Full applications 8 docs
  • Hamble Barline Beer Seaton EX12 3LR

    25/2028/DOC Submitted 1 Oct 2025 45m away

    Discharge of Condition for 25/1511/FUL: condition 9 (protection of existing boundary hedge and tree), condition 10 (tree protection details) and condition 11 (external lighting)

    Granted Conditions Trees 5 docs
  • Hamble Barline Beer Seaton EX12 3LR

    26/1402/VAR Submitted 13 Jul 2026 45m away

    96% historically approved · decision due ~7 Sep

    Variation of Condition Numbers 2 & 5 (Approved Plans & External Materials) on Planning Permission 25/1511/FUL (Proposed two-storey garage including creation and alteration of vehicular access; installation of rooflights and alterations to roof and fenestration to facilitate loft conversion; addition of external cladding.) Change of existing roof tile on main dwelling to slates.

    Awaiting decision Amendments Loft or dormer Windows or glazing 5 docs
    Domestic
  • 7 Underleys Beer Devon EX12 3LY

    25/2399/DOC Submitted 24 Nov 2025 70m away

    Discharge of condition for 25/1971/FUL : Condition 3 (Materials Pallete), Condition 4 (Drainage Plan)

    Granted Conditions 4 docs
  • 7 Underleys Beer Devon EX12 3LY

    25/1971/FUL Submitted 13 Oct 2025 70m away

    Proposed driveway and associated works

    Granted Full applications 9 docs
  • Seddul Bahr Barline Beer Devon EX12 3LS

    26/0357/TRE Submitted 23 Feb 2026 82m away

    Walnut: -Remove all dead or moribund twigs and small branches throughout the crown of the tree, this in itself will reduce congestion and improve the appearance -Remove any small rubbing or crossing branches to allow more light and air into the crown to encourage flowering and fruiting. The maximum diameter pruning cuts will be up to 15mm - this can be carried out with secateurs or long handled loppers. -Prune to an outward facing bud where possible to encourage good form, with pruning cuts made at 45 degrees.

    Granted Trees 5 docs

In East Devon

  • 26/1859/FUL Awaiting decision

    55 King Alfred Way Newton Poppleford Sidmouth EX10 0DG

    Installation of conservatory to the rear of the property.

    15 Sep 2026 Full applications
  • 26/1796/FUL Awaiting decision

    Popplefords Barn Nursery And Farm Shop Exeter Road Newton Poppleford EX10 0DE

    Proposed change of use, conversion of the existing spa building to provide staff/Care Home Manager's accommodation tied to Hillside House Residential Care Home; retention of the existing single-storey plant/store building and associated works.

    11 Sep 2026 Full applications
  • 26/1448/FUL Granted

    16 Bussel Close Exeter EX1 3GU

    Proposed single storey extension on north elevation

    11 Aug 2026 Full applications
  • 26/1059/FUL Granted

    Little Hayes Broadclyst Station Exeter EX5 3AX

    Replacement dwelling.

    9 Jun 2026 Full applications
  • 26/1601/FUL Awaiting decision

    31 Newlands Road Sidmouth EX10 9NL

    Construction of first floor studio over existing detached garage with external staircase.

    10 Sep 2026 Full applications