Skip to content
PlanIndex Get alerts
Menu

Planning application

Langmoor Farm Hawkchurch Axminster EX13 5UD

Awaiting decision East Devon 25/2305/LBC Listed Building Consent

Works: Roofing Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Retention of all of the following works: replacement of 3no. windows at ground floor, 1no. window at first floor, 2no. doors on front (north) elevation; replace 3no. windows at ground floor, 3no. first floor and 2no. doors on rear (south) elevation; existing flue encased with external chimney stack (cement render) on rear (south) elevation; render 2no. chimney stacks one central and one on gable side (west) elevation with cement render; new rainwater goods on front (north), rear (south) & side (west) elevations and slate roof and replace battens

As published by the council, reference 25/2305/LBC

Application record

Reference
25/2305/LBC
Type
Listed Building Consent
Status
Awaiting decision
Received
10 Dec 2025
Validated
10 Dec 2025
Ward
Yarty
Parish
Hawkchurch
Postcode
EX13 5UD

Timeline

Dates from the published record

  1. 10 Dec 2025

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 4 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 43 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Symonds & Sampson LLP Agent, registered in Dorchester

Active · incorporated 2007 · Dorchester

112 applications on PlanIndex · across 10 councils · 85% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided heritage and listed building applications in a median of 64 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

In East Devon

  • 26/1829/LBC Awaiting decision

    4 Porch Cottages Church Street Sidford Sidmouth EX10 9RG

    Reduce height to chimney and cap-off the whole of the chimney

    Received 30 Sep, published by the council 6 Oct 2026 Heritage and listed buildings
  • 26/1935/LBC Awaiting decision

    4 Causeway Cottages Causeway Beer Seaton EX12 3LF

    Proposed single storey rear extension

    Received 29 Sep, published by the council 6 Oct 2026 Heritage and listed buildings
  • 26/1764/LBC Awaiting decision

    12 Beer Road Seaton EX12 2PA

    Replace glazed window pane only on 1no. dormer window on south elevation (W5)

    Received 28 Sep, published by the council 6 Oct 2026 Heritage and listed buildings
  • 26/1776/LBC Awaiting decision

    Stanley Cottage Whitford Axminster EX13 7PE

    Replace ceilings in sitting room and upstairs hallway with lath and plaster (like-for-like) after flood damage.

    Received 28 Sep, published by the council 6 Oct 2026 Heritage and listed buildings
  • 26/1711/LBC Awaiting decision

    Oak Cottage Snodwell Farm Post Lane Cotleigh Devon EX14 9HZ

    Various works to main house and annexe: remove lean-to extension; reinstate ceilings; underfloor heating, DPM & insulation; replace staircase & internal doors; removal & construction of new walls; new steel beam installed for roof strengthening; roof living room: replace roof, remove A-frame & trusses & reinstate historic A-frame; new insulation, timbers & steel frame; roof dining room & others: replace roof and timbers. Annexe: ceilings removed & reinstated, new steel beams installed; new party wall; floors DPM & insulation; replace internal doors with fire doors; staircase to have new balustrade & handrail; removal of wall; timber landing extended; construction of new wall; remove Upvc roof & replace with rooflight; archway blocked up with door; replacement floors. External works: all windows replaced; Rear elevation: window & door removed & central window added, rooflight replaced on first floor, window & door removed & central window added; replace fascias & guttering. 2no. bifold doors on south elevation; dormer window increased in size with Juliette balcony, ASHP, removal of chimney; exchange double door & window, 3no. rooflights, window & door removed & new window created on west elevation; hipped roof to gable on south; Bat and bird boxes

    Received 23 Sep, published by the council 6 Oct 2026 Heritage and listed buildings