Planning application
Langmoor Farm Hawkchurch Axminster EX13 5UD
Works: Roofing Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Retention of all of the following works: replacement of 3no. windows at ground floor, 1no. window at first floor, 2no. doors on front (north) elevation; replace 3no. windows at ground floor, 3no. first floor and 2no. doors on rear (south) elevation; existing flue encased with external chimney stack (cement render) on rear (south) elevation; render 2no. chimney stacks one central and one on gable side (west) elevation with cement render; new rainwater goods on front (north), rear (south) & side (west) elevations and slate roof and replace battens
As published by the council, reference 25/2305/LBC
Application record
- Reference
- 25/2305/LBC
- Type
- Listed Building Consent
- Status
- Awaiting decision
- Received
- 10 Dec 2025
- Validated
- 10 Dec 2025
- Ward
- Yarty
- Parish
- Hawkchurch
- Postcode
- EX13 5UD
Timeline
Dates from the published record
-
10 Dec 2025
Received by East Devon
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 4 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Devon took a median of 43 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Symonds & Sampson LLP Agent, registered in Dorchester
Active · incorporated 2007 · Dorchester
112 applications on PlanIndex · across 10 councils · 85% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided heritage and listed building applications in a median of 64 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Other heritage and listed building applications
In East Devon
-
26/1829/LBC Awaiting decision
4 Porch Cottages Church Street Sidford Sidmouth EX10 9RG
Reduce height to chimney and cap-off the whole of the chimney
-
26/1935/LBC Awaiting decision
4 Causeway Cottages Causeway Beer Seaton EX12 3LF
Proposed single storey rear extension
-
26/1764/LBC Awaiting decision
12 Beer Road Seaton EX12 2PA
Replace glazed window pane only on 1no. dormer window on south elevation (W5)
-
26/1776/LBC Awaiting decision
Stanley Cottage Whitford Axminster EX13 7PE
Replace ceilings in sitting room and upstairs hallway with lath and plaster (like-for-like) after flood damage.
-
26/1711/LBC Awaiting decision
Oak Cottage Snodwell Farm Post Lane Cotleigh Devon EX14 9HZ
Various works to main house and annexe: remove lean-to extension; reinstate ceilings; underfloor heating, DPM & insulation; replace staircase & internal doors; removal & construction of new walls; new steel beam installed for roof strengthening; roof living room: replace roof, remove A-frame & trusses & reinstate historic A-frame; new insulation, timbers & steel frame; roof dining room & others: replace roof and timbers. Annexe: ceilings removed & reinstated, new steel beams installed; new party wall; floors DPM & insulation; replace internal doors with fire doors; staircase to have new balustrade & handrail; removal of wall; timber landing extended; construction of new wall; remove Upvc roof & replace with rooflight; archway blocked up with door; replacement floors. External works: all windows replaced; Rear elevation: window & door removed & central window added, rooflight replaced on first floor, window & door removed & central window added; replace fascias & guttering. 2no. bifold doors on south elevation; dormer window increased in size with Juliette balcony, ASHP, removal of chimney; exchange double door & window, 3no. rooflights, window & door removed & new window created on west elevation; hipped roof to gable on south; Bat and bird boxes