Skip to content
PlanIndex Get alerts
Menu

Planning application

Nutwell Lyme Road Uplyme Devon DT7 3UZ

Awaiting decision East Devon 25/2298/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Conversion of the existing garage into a habitable bedroom, the construction of a single-storey link extension connecting the main dwelling to the converted garage, and the addition of three single-storey extensions to the south, east, and north elevations of the property.

As published by the council, reference 25/2298/FUL

Application record

Reference
25/2298/FUL
Type
Full Application
Status
Awaiting decision
Received
14 Nov 2025
Validated
14 Nov 2025
Ward
Trinity
Parish
Uplyme
Postcode
DT7 3UZ

Timeline

Dates from the published record

  1. 14 Nov 2025

    Received by East Devon

  2. 12 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 9 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Guildford

1 application on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided full applications in a median of 49 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Bracken Rigg Cathole Lane Uplyme Devon DT7 3XD

    25/2237/FUL Submitted 19 Nov 2025 113m away

    Change of use of existing garage to ancillary residential annexe accommodation.

    Granted Full applications 7 docs
  • 11 Yawl Crescent Uplyme Devon DT7 3XL

    25/2170/TRE Submitted 22 Oct 2025 213m away

    T1, Beech : radial crown lift to approximately 4m from ground level. To lift the crown away from the residential properties (10 & 11), the oil tank, lane and parking areas.; to carry out a Crown reduction of up to 30% and radial target prune (up to 75mm diameter) the side limbs to shape in.

    Granted Trees 6 docs
  • Cathole Farm Cathole Lane Uplyme DT7 3XE

    26/0939/VAR Submitted 27 May 2026 232m away

    96% historically approved · decision due ~22 Jul

    Variation of condition numbers 3, 4, 5, 6 and 7 on planning permission 22/1173/FUL (convert shippen and linhay to two dwellings, alterations to garage and installation of two wastewater treatment systems and a bat hibernaculum); variation of Condition 3 and removal of condition 4 following submission of temporary bat roosting provisions and bat hibernaculum details; Condition 5 to be amended to reflect the surface water drainage strategy provided; condition 6 to be amended to reflect the The Arboricultural Method Statement and Tree Protection Plan provided. Condition 7 to be amended to reflect the revised foul water drainage strategy provided

    Awaiting decision Amendments Trees 6 docs
    Several homes
  • Cathole Farm Cathole Lane Uplyme Lyme Regis DT7 3XE

    26/1419/NMA Submitted 10 Jul 2026 232m away

    96% historically approved · decision due ~4 Sep

    Non-material amendment to condition 3 of planning permission 22/1173/FUL to allow the water treatment system and its associated connections to be installed before the temporary bat roosting provisions and the bat hibernaculum are required to be provided

    Awaiting decision Amendments 3 docs
  • Cathole Farm Cathole Lane Uplyme Devon DT7 3XE

    26/0862/DOC Submitted 1 May 2026 250m away

    Discharge of conditions for 22/1173/FUL : Condition 4 (bat hibernaculum), Condition 5 (surface water drainage scheme), Condition 6 a (trees)

    Granted Conditions Trees 6 docs
  • 11 Yawl Crescent Uplyme Devon DT7 3XL

    25/1749/TRE Submitted 21 Aug 2025 270m away

    G1 - x7 Ash stools: sectionally fell to ground level. No replanting plan due to native regen. growth in hedge line. (All showing symptoms of Ash Die-back.) All works to be carried out in accordance with BS 3998:2010 Tree Work ? Recommendations.

    Granted Trees 12 docs

In East Devon

  • 26/1714/FUL Awaiting decision

    5 Long Copp Budleigh Salterton Devon EX9 6DY

    Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit

    4 Sep 2026 Full applications
  • 26/1565/FUL Granted

    1 Hillymead Seaton EX12 2LF

    Retrospective permission for re-landscaping the drive area

    4 Aug 2026 Full applications
  • 26/1757/FUL Awaiting decision

    Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL

    New porch

    3 Sep 2026 Full applications
  • 26/1571/FUL Granted

    Hillsboro 44 Marlpit Lane Seaton EX12 2HL

    Construction of two-storey side extension

    5 Aug 2026 Full applications
  • 26/1536/FUL Granted

    Bramblings Smallridge Axminster EX13 7JL

    Single storey extension to the east elevation and raised patio.

    4 Aug 2026 Full applications