Skip to content
PlanIndex Get alerts
Menu

Planning application

86 High Street Honiton Devon EX14 1JN

Awaiting decision East Devon 25/2078/FUL Full Application

Works: Loft or dormer Several homes

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of Use from Office to 2no. dwellings at first, second and third floor levels with separate access to the rear. 5no new rooflights and Juliet balustrading on rear elevation

As published by the council, reference 25/2078/FUL

Application record

Reference
25/2078/FUL
Type
Full Application
Status
Awaiting decision
Received
5 Nov 2025
Validated
5 Nov 2025
Ward
Honiton St Michaels
Parish
Honiton
Postcode
EX14 1JN

Timeline

Dates from the published record

  1. 5 Nov 2025

    Received by East Devon

  2. 12 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 31 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file

8 applications on PlanIndex · across 4 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with East Devon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 94 High Street Honiton Devon EX14 1JL

    25/2265/DOC Submitted 4 Nov 2025 29m away

    Discharge of conditions for 25/1392/LBC : Condition 3 (making good the existing fabric)

    Decided Conditions 3 docs
  • 96 High Street Honiton EX14 1JW

    20/2749/LBC Submitted 2 Feb 2021 40m away

    of internal shop fittings, launderette machines, ancillary ducting/flue and signage.

    Withdrawn Heritage and listed buildings 31 docs
  • 96 High Street Honiton EX14 1JW

    20/2748/FUL Submitted 2 Feb 2021 40m away

    Change of use to launderette/wet cleaning and installation of ducting/flue.

    Withdrawn Full applications 31 docs
  • Barn Mews King Street Honiton EX14 1AB

    22/1253/OUT Submitted 23 Jun 2022 54m away

    Outline application for the construction of a single storey dwelling (including consideration of matters relating to Design, Scale, Layout and External Appearance) and including demolition of existing outbuilding

    Withdrawn Outline Demolition 11 docs
    Small domestic
  • 113 High Street Honiton Devon EX14 1LS

    25/2111/LBC Submitted 3 Nov 2025 68m away

    External works: Alterations to shop front. Internals works to include installing grid ceiling; re-locate air conditioning unit at ground floor; new air conditioning unit at grd floor; new grid ceiling at grd floor; new MF Bulkhead at front of store; emergency fusion sky panel at first floor, and new bureau counter/area at grd floor.

    Granted Heritage and listed buildings Windows or glazing 57 docs
  • 121 High Street Honiton EX14 1LS

    26/1475/LBC Submitted 20 Jul 2026 74m away

    94% historically approved · decision due ~14 Sep

    Proposed replacement of 1x non-illuminated fascia sign and 1x non-illuminated hanging sign to the shopfront.

    Awaiting decision Heritage and listed buildings Windows or glazing 6 docs

In East Devon

  • 26/1714/FUL Awaiting decision

    5 Long Copp Budleigh Salterton Devon EX9 6DY

    Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit

    4 Sep 2026 Full applications
  • 26/1565/FUL Granted

    1 Hillymead Seaton EX12 2LF

    Retrospective permission for re-landscaping the drive area

    4 Aug 2026 Full applications
  • 26/1757/FUL Awaiting decision

    Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL

    New porch

    3 Sep 2026 Full applications
  • 26/1571/FUL Granted

    Hillsboro 44 Marlpit Lane Seaton EX12 2HL

    Construction of two-storey side extension

    5 Aug 2026 Full applications
  • 26/1536/FUL Granted

    Bramblings Smallridge Axminster EX13 7JL

    Single storey extension to the east elevation and raised patio.

    4 Aug 2026 Full applications