Skip to content
PlanIndex Get alerts
Menu

Planning application

Woodlands Salcombe Regis Devon EX10 0PD

Awaiting decision East Devon 25/2058/FUL Full Application

Works: Demolition Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Replacement dwelling - demolish existing bunglaow and replace with new bungalow

As published by the council, reference 25/2058/FUL

Application record

Reference
25/2058/FUL
Type
Full Application
Status
Awaiting decision
Received
13 Nov 2025
Validated
13 Nov 2025
Ward
Sidmouth Rural
Parish
Sidmouth
Postcode
EX10 0PD

Timeline

Dates from the published record

  1. 13 Nov 2025

    Received by East Devon

  2. 12 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 8 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Liverpool

6 applications on PlanIndex · across 3 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with East Devon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Oakdown Touring Park Weston Sidmouth EX10 0PT

    25/2276/DOC Submitted 6 Nov 2025 152m away

    95% historically approved · decision due ~1 Jan

    Discharge of condition for 23/0220/MFUL: Condition 3 (Drainage Design), Condition 4 (Landscaping), Condition 5 (Colours), Condition 6 (Landscpe maintenance)

    Awaiting decision Conditions 17 docs
  • Kings Down Tail Caravan And Camping Park Salcombe Regis Sidmouth EX10 0PD

    26/0007/EIA Submitted 26 Aug 2026 386m away

    Environmental Impact Assessment Screening Opinion relating to development proposed under application 26/0665/MFUL (Demolition of shower block and installation of 59 bases for the siting of static caravans with decking; retention of an existing tree house; change of use of existing building to spa/gym and reception; all with associated access, landscaping, car parking, drainage and infrastructure works (above and below ground)).

    Decided Outline Demolition Trees 14 docs

In East Devon

  • 26/1714/FUL Awaiting decision

    5 Long Copp Budleigh Salterton Devon EX9 6DY

    Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit

    4 Sep 2026 Full applications
  • 26/1565/FUL Granted

    1 Hillymead Seaton EX12 2LF

    Retrospective permission for re-landscaping the drive area

    4 Aug 2026 Full applications
  • 26/1757/FUL Awaiting decision

    Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL

    New porch

    3 Sep 2026 Full applications
  • 26/1571/FUL Granted

    Hillsboro 44 Marlpit Lane Seaton EX12 2HL

    Construction of two-storey side extension

    5 Aug 2026 Full applications
  • 26/1536/FUL Granted

    Bramblings Smallridge Axminster EX13 7JL

    Single storey extension to the east elevation and raised patio.

    4 Aug 2026 Full applications