Planning application
Woodlands Salcombe Regis Devon EX10 0PD
Works: Demolition Domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Replacement dwelling - demolish existing bunglaow and replace with new bungalow
As published by the council, reference 25/2058/FUL
Application record
- Reference
- 25/2058/FUL
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 13 Nov 2025
- Validated
- 13 Nov 2025
- Ward
- Sidmouth Rural
- Parish
- Sidmouth
- Postcode
- EX10 0PD
Timeline
Dates from the published record
-
13 Nov 2025
Received by East Devon
-
12 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 8 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Devon took a median of 42 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Liverpool
6 applications on PlanIndex · across 3 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with East Devon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Oakdown Touring Park Weston Sidmouth EX10 0PT
95% historically approved · decision due ~1 Jan
Discharge of condition for 23/0220/MFUL: Condition 3 (Drainage Design), Condition 4 (Landscaping), Condition 5 (Colours), Condition 6 (Landscpe maintenance)
Awaiting decision Conditions 17 docs -
Kings Down Tail Caravan And Camping Park Salcombe Regis Sidmouth EX10 0PD
Environmental Impact Assessment Screening Opinion relating to development proposed under application 26/0665/MFUL (Demolition of shower block and installation of 59 bases for the siting of static caravans with decking; retention of an existing tree house; change of use of existing building to spa/gym and reception; all with associated access, landscaping, car parking, drainage and infrastructure works (above and below ground)).
Decided Outline Demolition Trees 14 docs
Other full applications applications
In East Devon
-
26/1714/FUL Awaiting decision
5 Long Copp Budleigh Salterton Devon EX9 6DY
Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit
-
26/1565/FUL Granted
1 Hillymead Seaton EX12 2LF
Retrospective permission for re-landscaping the drive area
-
26/1757/FUL Awaiting decision
Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL
New porch
-
26/1571/FUL Granted
Hillsboro 44 Marlpit Lane Seaton EX12 2HL
Construction of two-storey side extension
-
26/1536/FUL Granted
Bramblings Smallridge Axminster EX13 7JL
Single storey extension to the east elevation and raised patio.