Skip to content
PlanIndex Get alerts
Menu

Planning application

21 Barnfield Avenue Exmouth Devon EX8 2QE

Granted East Devon 25/1766/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single-storey rear extension and front porch extension.

As published by the council, reference 25/1766/FUL

Application record

Reference
25/1766/FUL
Type
Full Application
Status
Approved
Decision
Approval with conditions
Received
27 Aug 2025
Validated
27 Aug 2025
Decided
3 Oct 2025
Ward
Exmouth Littleham
Parish
Exmouth
Decision by
Delegated Decision
Postcode
EX8 2QE

Timeline

Dates from the published record

  1. 27 Aug 2025

    Received by East Devon

  2. 3 Oct 2025

    Decision issued: Approval with conditions

  3. 12 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in Exeter

49 applications on PlanIndex · across 3 councils · 89% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 49 Cranford Avenue Exmouth EX8 2QF

    26/1752/DOC Submitted 26 Aug 2026 21m away

    95% historically approved · decision due ~21 Oct

    Discharge of Condition for 25/1364/FUL: Condition 4 (tree protection scheme), Condition 5 (materials), Condition 6 (surface water management scheme) and Condition 7 (foul sewage pump)

    Awaiting decision Conditions Trees 11 docs
  • 45 Cranford Avenue Exmouth EX8 2QD

    26/1372/FUL Submitted 13 Jul 2026 23m away

    Proposed new driveway, entrance gates and access onto the highway

    Granted Full applications 7 docs
  • 49 Cranford Avenue Exmouth Devon EX8 2QF

    25/1901/TRE Submitted 11 Sep 2025 28m away

    1x Weeping Willow : pollard to previous pollard points with final cuts made at approximately 6m from ground level, removing approximately 4m of growth.

    Granted Trees
  • 4 Littleham Road Exmouth Devon EX8 2QG

    25/1952/FUL Submitted 6 Oct 2025 124m away

    93% historically approved · decision due ~1 Dec

    Change of use from bakery (Class E) to hot food takeaway (Sui Generis)

    Awaiting decision Full applications 22 docs
  • 2A Littleham Road Exmouth EX8 2QG

    26/0592/FUL Submitted 7 Apr 2026 136m away

    93% historically approved · decision due ~2 Jun

    Loft conversion including new front and rear rooflights

    Awaiting decision Full applications Loft or dormer 7 docs
  • 2 Littleham Road Exmouth Devon EX8 2QG

    25/2133/TRE Submitted 17 Oct 2025 143m away

    T1, Oak : Crown reduction by a maximum of 1.5m to achieve sufficient clearance to the property, maintaining the natural form and primary structural framework with a final crown spread of approximately 6-7m; reduction cuts will be made to suitable lateral growth points; all pruning wounds will not exceed 50mm in diameter. Additionally, pruning within the lower crown, north of the pavement, is 2.3 to 2.4m, allowing for safe pedestrian access.

    Split decision Trees 7 docs

In East Devon

  • 26/1714/FUL Awaiting decision

    5 Long Copp Budleigh Salterton Devon EX9 6DY

    Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit

    4 Sep 2026 Full applications
  • 26/1565/FUL Granted

    1 Hillymead Seaton EX12 2LF

    Retrospective permission for re-landscaping the drive area

    4 Aug 2026 Full applications
  • 26/1757/FUL Awaiting decision

    Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL

    New porch

    3 Sep 2026 Full applications
  • 26/1571/FUL Granted

    Hillsboro 44 Marlpit Lane Seaton EX12 2HL

    Construction of two-storey side extension

    5 Aug 2026 Full applications
  • 26/1536/FUL Granted

    Bramblings Smallridge Axminster EX13 7JL

    Single storey extension to the east elevation and raised patio.

    4 Aug 2026 Full applications